<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Global]]></title>
                    <link>https://newsroom.bmwgroup.com/global/</link>
                    <description></description>
                    <language>en</language>
                    <lastBuildDate>Wed, 07 Oct 2026 15:10:09 +0200</lastBuildDate>
                    <pubDate>Thu, 26 Mar 2026 08:00:00 +0100</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom Global]]></title>
                        <url>https://content.presspage.com/clients/150_3228.png</url>
                        <link>https://newsroom.bmwgroup.com/global/</link>
                        <width>144</width>
                    </image><item>
                        <title>BMW Group builds new Competence Centre Circularity at Wackersdorf site</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-builds-new-competence-centre-circularity-at-wackersdorf-site/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-builds-new-competence-centre-circularity-at-wackersdorf-site/</guid><pp:caseid>769404</pp:caseid><pp:summary><![CDATA[+++ BMW Group Recycling and Dismantling Centre (RDC) set to become  Competence Centre Circularity +++ Strengthening the circular economy,  resource efficiency and technology development +++ Clear signal for the future  of the Wackersdorf location +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Munich/Wackersdorf.</strong> The BMW Group is relocating its
  Recycling and Dismantling Centre (RDC) from Unterschleißheim to the
  company’s Wackersdorf site, with a significant expansion. At the new
  location, a technologically state-of-the-art competence centre for
  circularity is being built, advancing vehicle dismantling and
  recycling expertise for the future. Commissioning is scheduled for
  early 2029.</p>
<p>“The circular economy is a key element of the BMW Group’s corporate
  strategy,” says Jörg Lederbauer, Vice-President Circular Economy,
  Spare Parts Supply High Voltage Battery and Electric Powertrain at the
  BMW Group. “Our new competence centre in Wackersdorf will be a core
  component of our circular value chain and will help make the mobility
  of the future more resource efficient. We want to find the best way to
  keep materials in the cycle, ensuring that resources retain their
  value for further use in the long term. This will also reduce our
  dependence on primary raw materials. At the same time, the use of
  high-quality secondary materials will continue to significantly lower
  our vehicles’ carbon footprint.”</p>
<p>For more than 30 years, at its current location in Unterschleißheim,
  near Munich, the BMW Group Recycling and Dismantling Centre (RDC) has
  developed methods aimed at achieving significant advances in the
  recycling of parts and the recovery of materials, and has tested them
  in practice. The insights gained by the RDC into the recyclability of
  components and materials, in line with Design for Circularity
  principles, are already incorporated into product development at the
  BMW Group. These insights also feed into the cooperation with PreZero,
  which the BMW Group recently entered into in order to leverage the
  strategic and economic potential of the circular economy in
  end‑of‑life vehicle recycling. </p>
<p>The recycling industry’s global network also benefits from the work
  of the RDC. Around 3,000 businesses in 32 countries rely on a shared
  recycling database for information on how recyclable components can be
  disassembled cost-effectively and valuable materials efficiently recovered.</p>
<p>At the future site, process, material and technology development will
  be even more closely integrated with vehicle recycling operations. The
  new scope of activities at the Competence Centre Circularity includes
  the recycling of hydrogen vehicles, automation of dismantling
  processes and development of expertise in innovative shredding and
  sorting technologies.</p>
<p>The BMW Group sees Wackersdorf as the ideal new location for the
  Competence Centre Circularity, with BMW Group Plant Wackersdorf having
  embodied flexibility for decades: Housing cockpit production, the
  Rolls-Royce door and flap production centre, parts supply for overseas
  plants and the battery testing centre, the site has wide-ranging
  expertise and is firmly established within the BMW Group network.</p>
<p>“In recent years, the company has set a decisive course for the
  future of the Wackersdorf location. Throughout this process, the
  entire plant team has consistently demonstrated flexibility. Building
  the competence centre for circularity here provides our site with a
  broader foundation. In this way, we are tapping into an attractive,
  future-oriented area of activity,” says Stefan Betz, head of BMW Group
  Plant Wackersdorf.</p>
<p>“The company is systematically continuing its successful
  transformation. Establishing the new Competence Centre Circularity
  here represents an important strategic decision by the company in
  favour of the Wackersdorf location – and, above all, its employees. As
  employee representatives, we also supported this,” says André Mandl,
  Works Council Chairman for BMW Group Plants Regensburg and Wackersdorf.</p>
<p>“In Wackersdorf, BMW has been a strong partner by our side for many
  decades. We are delighted that the BMW Group is reaffirming its
  commitment to the location with this move. It sends a clear signal for
  our site and for sustainable future technologies,” says Thomas Falter,
  Mayor of Wackersdorf.</p>
<p>“The cutting-edge Competence Centre Circularity will make a major
  contribution to regional value creation and further development of the
  circular economy,” adds Thomas Ebeling, District Administrator of
  Schwandorf District. “In combination with the trechnology transfer
  centre planned for Wackersdorf by the Regensburg University of Applied
  Sciences and the University of Applied Sciences Amberg Weiden, close
  integration of business and academia on the circular economy will now
  also be possible. In this way, we are strengthening the region.”</p>
<p>Following the location decision, the detailed planning phase for the
  Competence Centre Circularity at the new site can now begin. The
  existing RDC in Unterschleißheim will remain fully operational until
  the relocation. The BMW Group will provide further information on the
  next steps in due course.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Jochen Diernberger<br>Tel: +49-89-382-27935<br>E-mail: <a href="mailto:jochen.diernberger@bmw.de">jochen.diernberger@bmw.de</a></div></div></div>]]></description><category><![CDATA[Sustainability,Wackersdorf,Research &amp; Development,Production,Logistics,Supply Chain,Circular Economy]]></category>
            <pubDate>Thu, 26 Mar 2026 08:00:00 +0100</pubDate>
            <pp:lastModified>Thu, 26 Mar 2026 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/6b0823ef-a8fa-465a-9f5c-e7bf889856f0/500_P90633314_highRes_wackersdorf-03-2026-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/6b0823ef-a8fa-465a-9f5c-e7bf889856f0/500_P90633314_highRes_wackersdorf-03-2026-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/6b0823ef-a8fa-465a-9f5c-e7bf889856f0/P90633314_highRes_wackersdorf-03-2026-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90633314_highRes_wackersdorf-03-2026-.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Plant Regensburg marks 40th anniversary with record production</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-plant-regensburg-marks-40th-anniversary-with-record-production/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-plant-regensburg-marks-40th-anniversary-with-record-production/</guid><pp:caseid>769474</pp:caseid><pp:summary><![CDATA[+++ From regional development powerhouse to the BMW Group's highest-volume vehicle plant in Europe – Record production in 2025: Plant hits 40-year high with 356,901 vehicles +++ +++ 8.7 million vehicles since start of production in 1986 +++ +++ Plant Director Armin Ebner: “Continuous efforts to increase competitiveness are the key to our success” +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>+++ From regional development powerhouse to the BMW Group's
    highest-volume vehicle plant in Europe – Record production in 2025:
    Plant hits 40-year high with 356,901 vehicles +++</strong></p>
<p>
  <strong>+++ 8.7 million vehicles since start of production in 1986 +++</strong>
  <br />
  <strong>+++ Plant Director Armin Ebner: “Continuous efforts to
    increase competitiveness are the key to our success” +++</strong></p>
<p>
  <strong>Regensburg. </strong>Plant Regensburg achieved a new
  production record of 356,901 vehicles in 2025, making it the BMW
  Group’s highest-volume car plant in Europe. Since the plant opened in
  1986, 8.7 million vehicles have rolled off its production line. “With
  this record production, we not only reached a new all-time high in the
  plant’s 40-year history but also – as in the previous year – helped
  the BMW Group’s German plants build more than one million vehicles
  again in 2025,” says Plant Director Armin Ebner. “For 40 years, the
  plant has been a central development powerhouse for the eastern
  Bavarian region.”</p>
<p>
  <strong>Continuous efforts to increase competitiveness as key success factor </strong></p>
<p>“Continuous and consistent efforts to increase our competitiveness
  remain the key to our success. Every single day in Regensburg, we
  demonstrate that competitive production is possible in Germany,” adds
  Ebner. By implementing efficiency measures within its production
  system, BMW Group Plant Regensburg has lowered costs by more than a
  quarter since 2019.</p>
<p>
  <span>
    <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90628651&attachment=1&actEvent=image"></span></span></p>
<p>“Digitalisation is an important lever for this,” says Ebner. Examples
  include the use of artificial intelligence in automated surface
  processing in the paint shop and for quality controls during vehicle
  assembly, or a cloud-based traffic control system for supplying parts.
  Since early 2025, new vehicles have also been able to navigate
  autonomously, without a driver, from the assembly line to the loading area.</p>
<p>
  <span>
    <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90602513&attachment=1&actEvent=image"></span></span></p>
<p>
  <strong>More than 150,000 electrified models in 2025</strong></p>
<p>More than 150,000 of the vehicles manufactured in Regensburg in 2025
  were electrified – that is, either fully-electric vehicles or plug-in
  hybrids. The BMW X1 was the highest-volume model, with over 266,000
  vehicles produced, while the BMW X2 accounted for more than 90,000 vehicles.</p>
<p>Over 55,000 vehicles remained in the company’s domestic market of
  Germany. More than half of the cars produced in Regensburg in 2025
  went to customers in other European countries. More than 100,000
  vehicles were shipped overseas.</p>
<p>Ebner is optimistic about the plant’s anniversary year: “With our
  attractive BMW X1 and BMW X2 models, we are producing exactly what our
  customers want, while continuing to operate three shifts around the
  clock.” Every 57 seconds, a new vehicle rolls off the assembly line.
  This currently adds up to more than 1,400 vehicles per workday, which
  are then delivered to customers around the world. Different types of
  drive train are flexibly manufactured on a single production line –
  from models with internal combustion engines to plug-in hybrids and
  fully-electric vehicles.</p>
<p>
  <strong>BMW Group Plant Regensburg – powering jobs across the region</strong></p>
<p>As part of the settlement agreement with the City of Regensburg in
  the 1980s, BMW pledged to produce 400 vehicles per day and create
  3,500 jobs. With the ramp-up and expansion of the plant in subsequent
  years, both employee numbers and production capacity increased: In
  1991, the plant exceeded the 100,000-vehicle threshold for the first
  time, with around 128,000 cars manufactured. By 1999, it was building
  about 750 vehicles daily and more than 200,000 annually. In 2005,
  annual production surpassed 300,000 vehicles for the first time – with
  a daily output of around 1,000 units. Having assembled its
  one-millionth vehicle back in 1995, Plant Regensburg is set to produce
  its nine-millionth vehicle this year.</p>
<p>
  <span>
    <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90628657&attachment=1&actEvent=image"></span></span></p>
<p>Employee numbers have also continued to climb: In 1988, the plant
  employed around 3,300 people. By 1991, that number had risen to about
  7,300. Today, the BMW Group’s core staff at its Regensburg and
  Wackersdorf locations in eastern Bavaria comprises around 9,000
  employees, including approximately 380 apprentices.</p>
<p>This makes the plant a significant economic factor and employer
  across the region. Ebner: “Our employees’ commitment, their innovation
  mindset and their forward-looking decisions have shaped BMW Group
  Plant Regensburg into what it is today: a driving force and economic
  engine for the entire region.”<strong>
    <br clear="all" /></strong></p>
<p>
  <strong>40 years of BMW Group Plant Regensburg – overview of milestones:<br />
    <br /></strong></p>
<p>
  <strong>1983      </strong>Decision, contract signing for
  establishment of Regensburg site</p>
<p>
  <strong>
    <span>
      <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90628681&attachment=1&actEvent=image"></span></span></strong></p>
<p>
  <strong>1984      </strong>Groundbreaking with Minister-President
  Franz-Josef Strauß; <br />              construction of production
  halls begins<br />
  <strong>
    <span>
      <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90628682&attachment=1&actEvent=image"></span></span></strong></p>
<p>
  <strong>1985</strong>     Topping-out ceremony</p>
<p>
  <strong>1986     </strong>Start of production for BMW 3 Series (E30);
  around 1,300 employees</p>
<p>
  <strong>
    <span>
      <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90628684&attachment=1&actEvent=image"></span></span></strong></p>
<p>
  <strong>1987      </strong>Paint shop commissioned;<br />first
  networked computers in assembly usher in the computer age</p>
<p>
  <strong>1988</strong>     Around 3,300 employees</p>
<p>
  <strong>1990      </strong>Body shop commissioned</p>
<p>
  <strong>1991      </strong>Annual production: around 128,000 vehicles,
  surpassing the 100,000 mark;<br />around 7,300 employees</p>
<p>
  <strong>1995      </strong>Production milestone: 1,000,000 vehicles
  manufactured in Regensburg</p>
<p>
  <strong>1997      </strong>Press shop completed</p>
<p>
  <strong>1999      </strong>Annual production exceeds 200,000 vehicles
  for the first time; <br />              more than 8,700 employees</p>
<p>
  <strong>2001      </strong>Groundbreaking for plant expansion: paint
  shop and body shop</p>
<p>
  <strong>2005      </strong>Annual production exceeds 300,000 vehicles
  for the first time</p>
<p>
  <strong>2007      </strong>Groundbreaking for press shop expansion</p>
<p>
  <strong>2010      </strong>Assembly/finish refurbishment</p>
<p>
  <strong>2013      </strong>New press system commissioned</p>
<p>
  <strong>2014      </strong>Completion of automated small parts warehouse</p>
<p>
  <strong>2015      </strong>EFQM Excellence Award; BMW X1 series launch</p>
<p>
  <strong>2017      </strong>West expansion of assembly commissioned</p>
<p>
  <strong>2018 </strong>    Start of BMW X2 series production</p>
<p>
  <strong>2025      </strong>Additional body shop commissioned in Neutraubling</p>
<p>
  <strong>2026      </strong>Around 9,000 employees, including approx.
  380 apprentices</p>
<p> </p>
<p>
  <strong>40 years of BMW Group Plant Regensburg – vehicle models produced:</strong></p>
<p>
  <strong>  <span>
      <span style=""><img src="https://mediapool.bmwgroup.com/download/edown/pressclub/publicq?&dokNo=P90628683&attachment=1&actEvent=image"></span></span></strong>
  <strong>
    <br /></strong></p>
<table border="1" cellpadding="0" cellspacing="0" style="width: 100.0%;">
  
    <tr>
      <td style="width: 134.45pt;" valign="top"><p>
          <strong>Model</strong></p></td><td style="width: 36.3pt;" valign="top"><p>
          <strong>Type</strong></p></td><td style="width: 126.5pt;" valign="top"><p>
          <strong>Production period:</strong></p></td><td style="width: 100.6pt;" valign="top"><p>
          <strong>Number of units</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 1 Series 5-Door</p></td><td style="width: 36.3pt;"><p>E87</p></td><td style="width: 126.5pt;"><p>2003 – 2011</p></td><td style="width: 100.6pt;"><p>908,144</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 1 Series 5-Door</p></td><td style="width: 36.3pt;"><p>F20</p></td><td style="width: 126.5pt;"><p>2010 – 2019</p></td><td style="width: 100.6pt;"><p>818,530</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 1 Series 3-Door</p></td><td style="width: 36.3pt;"><p>F21</p></td><td style="width: 126.5pt;"><p>2010 – 2019</p></td><td style="width: 100.6pt;"><p>128,070</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 1 Series 5-Door</p></td><td style="width: 36.3pt;"><p>F40</p></td><td style="width: 126.5pt;"><p>2018 – 2023</p></td><td style="width: 100.6pt;"><p>83,160</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total BMW 1 Series  </strong></p></td><td style="width: 100.6pt;"><p>
          <strong>1,937,904</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E30</p></td><td style="width: 126.5pt;"><p>1986 – 1993</p></td><td style="width: 100.6pt;"><p>310,590</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E36</p></td><td style="width: 126.5pt;"><p>1990 – 1999</p></td><td style="width: 100.6pt;"><p>1,187,502</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E46</p></td><td style="width: 126.5pt;"><p>1997 – 2006</p></td><td style="width: 100.6pt;"><p>1,488,660</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E90</p></td><td style="width: 126.5pt;"><p>2004 – 2012</p></td><td style="width: 100.6pt;"><p>243,240</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series Coupé</p></td><td style="width: 36.3pt;"><p>E92</p></td><td style="width: 126.5pt;"><p>2005 – 2013</p></td><td style="width: 100.6pt;"><p>380,698</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series
        Convertible</p></td><td style="width: 36.3pt;"><p>E93</p></td><td style="width: 126.5pt;"><p>2005 – 2013</p></td><td style="width: 100.6pt;"><p>254,051</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>F30</p></td><td style="width: 126.5pt;"><p>2011 – 2018</p></td><td style="width: 100.6pt;"><p>278,853</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW M3</p></td><td style="width: 36.3pt;"><p>F80</p></td><td style="width: 126.5pt;"><p>2012 – 2018</p></td><td style="width: 100.6pt;"><p>34,677</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total BMW 3 Series </strong></p></td><td style="width: 100.6pt;"><p>
          <strong>4,178,271</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW Z4</p></td><td style="width: 36.3pt;"><p>E89</p></td><td style="width: 126.5pt;"><p>2008 – 2016</p></td><td style="width: 100.6pt;"><p>116,163</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total BMW Z4 </strong></p></td><td style="width: 100.6pt;"><p>
          <strong>116,163</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 2 Series</p></td><td style="width: 36.3pt;"><p>F46</p></td><td style="width: 126.5pt;"><p>2014 – 2023</p></td><td style="width: 100.6pt;"><p>209,883</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total BMW 2 Series </strong> </p></td><td style="width: 100.6pt;"><p>
          <strong>209,883</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 4 Series
        Convertible</p></td><td style="width: 36.3pt;"><p>F33</p></td><td style="width: 126.5pt;"><p>2013 – 2020</p></td><td style="width: 100.6pt;"><p>158,587</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW 4 Series
        Convertible</p></td><td style="width: 36.3pt;"><p>F83</p></td><td style="width: 126.5pt;"><p>2013 – 2020</p></td><td style="width: 100.6pt;"><p>19,869</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total BMW 4 Series  </strong></p></td><td style="width: 100.6pt;"><p>
          <strong>178,456</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW X2</p></td><td style="width: 36.3pt;"><p>F39</p></td><td style="width: 126.5pt;"><p>2016 – 2023</p></td><td style="width: 100.6pt;"><p>307,555</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW X2</p></td><td style="width: 36.3pt;"><p>U10</p></td><td style="width: 126.5pt;"><p>since 2021</p></td><td style="width: 100.6pt;"><p>184,612</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total BMW X2  </strong></p></td><td style="width: 100.6pt;"><p>
          <strong>492,167</strong></p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW X1</p></td><td style="width: 36.3pt;" valign="top"><p>F48</p></td><td style="width: 126.5pt;" valign="top"><p>2014 – 2022</p></td><td style="width: 100.6pt;" valign="top"><p>851,471</p></td></tr>
    <tr>
      <td style="width: 134.45pt;"><p>BMW X1</p></td><td style="width: 36.3pt;" valign="top"><p>U11</p></td><td style="width: 126.5pt;" valign="top"><p>since 2022</p></td><td style="width: 100.6pt;" valign="top"><p>770,131</p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;" valign="top"><p>
          <strong>Total BMW X1  </strong></p></td><td style="width: 100.6pt;" valign="top"><p>
          <strong>1,621,602</strong></p></td></tr>
    <tr>
      <td colspan="3" style="width: 297.25pt;"><p>
          <strong>Total number of vehicles* </strong></p></td><td style="width: 100.6pt;"><p>
          <strong>8,734,446</strong></p></td></tr></table>
<p>*Updated: Dec. 2025</p>
<p> </p>
<p>
  <strong> </strong>
  <strong> </strong></p>
<p>
  <strong>BMW Group Corporate Communications<br /></strong>Saskia
  Graser, head of Communications Regensburg and Wackersdorf +49 151 6060
  2014, Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a></p>
<p>Media website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a></p>
<p>Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a></p>
<p> </p>
<p>
  <strong>BMW Group Plants Regensburg and Wackersdorf<br /></strong>
  <strong>BMW Group Plant Regensburg</strong> has been in operation for
  more than four decades. After construction of the production halls was
  completed in 1984, series production of the BMW 3 Series (E30) began
  in autumn 1986. As part of the settlement agreement with the City of
  Regensburg, BMW pledged at that time to produce 400 vehicles per day
  and create 3,500 jobs.</p>
<p>Today, Plant Regensburg is one of more than 30 BMW Group production
  locations worldwide. More than 1,400 BMW X1 and BMW X2 model vehicles
  roll off the assembly line each day, destined for customers around the
  globe. Different types of drive train are flexibly manufactured on a
  single production line – from models with internal combustion engines
  to plug-in hybrids and fully-electric vehicles.</p>
<p>Within the framework of the BMW iFACTORY, the BMW Group is also
  setting standards at its Regensburg location in the fields of
  digitalisation, circularity and competitiveness – as confirmed by
  recent awards. For example, in 2025, the plant was named “FACTORY OF
  THE YEAR” in the category “Excellent Large-Series Assembly”. In
  addition, the BMW X1 from Regensburg was once again voted Best in
  Class in “Best Cars 2025”. It is already possible to experience, in
  virtual form, what the factory will look like in the coming years.
  Production of the “Neue Klasse” – BMW’s next model generation – is set
  to ramp up in Regensburg in the second half of this decade.</p>
<p>
  <strong>BMW Group Plant Wackersdorf</strong> is home to cockpit
  production and parts supply for overseas plants, and also serves as
  the door and flap production centre for Rolls-Royce. With its battery
  testing centre, the site also makes a significant contribution to electromobility.</p>
<p>The BMW Group's core staff at its Regensburg and Wackersdorf
  locations in eastern Bavaria comprises around 9,000 employees,
  including approximately 380 apprentices.</p>
<p>
  <a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Saskia Graser<br>Tel: +49-941-770-2014<br>E-mail: <a href="mailto:saskia.graser@bmw.de">saskia.graser@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Regensburg,Wackersdorf,Production Plants,Research &amp; Development,Corporate Heritage,Heritage,Production]]></category>
            <pubDate>Mon, 02 Feb 2026 08:00:00 +0100</pubDate>
            <pp:lastModified>Mon, 02 Feb 2026 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/603cbbbd-0d3d-4819-b683-d92597a29850/500_P90628664_highRes_vehicle-production-a.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/603cbbbd-0d3d-4819-b683-d92597a29850/500_P90628664_highRes_vehicle-production-a.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/603cbbbd-0d3d-4819-b683-d92597a29850/P90628664_highRes_vehicle-production-a.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90628664_highRes_vehicle-production-a.jpg]]></pp:imageTitle></item><item>
                        <title>Automotive Lean Production Award for the cockpit production at the BMW Group plants Landshut and Wackersdorf.</title>
                        <link>https://newsroom.bmwgroup.com/global/automotive-lean-production-award-for-the-cockpit-production-at-the-bmw-group-plants-landshut-and-wackersdorf/</link>
                        <guid>https://newsroom.bmwgroup.com/global/automotive-lean-production-award-for-the-cockpit-production-at-the-bmw-group-plants-landshut-and-wackersdorf/</guid><pp:caseid>769169</pp:caseid><pp:summary><![CDATA[+++ Award in the category "Supplier" for outstanding interaction of lean management, digitalization, and innovative power +++ Martin Frensch, Senior Vice President of Body, Exterior Trim and Interior in the purchasing and supplier network at BMW Group: "Lean before Digital is our guiding principle for efficient and forwardlooking production." +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>+++ Award in the category "Supplier" for outstanding
    interaction of lean management, digitalization, and innovative power
    +++ Martin Frensch, Senior Vice President of Body, Exterior Trim and
    Interior in the purchasing and supplier network at BMW Group:
    "Lean before Digital is our guiding principle for efficient and
    forwardlooking production." +++</strong></p>
<p>
  <strong>
    <br /></strong>
  <strong>Landshut/Wackersdorf.</strong> The cockpit production at the
  BMW Group plants in Landshut and Wackersdorf will be awarded with the 
  Automotive Lean Production Award in the category "Supplier".
  The  jury was impressed by the outstanding ensemble of lean
  management, digitalization, and innovation in the interior components
  production at the BMW Group. The award will be presented at the 19th
  Automotive Lean Production Congress on November 25 and 26, 2025, in
  Poznań, Poland.<br />
  <br />
  <strong>Smart production of cockpits: increased flexibility and
    efficiency in the production and supply chain.</strong>
  <br />With highest precision, employees at the BMW Group plants in
  Landshut and Wackersdorf manufacture interior components for the BMW 1
  Series, 2 Series, 3 Series, 4 Series, 5 Series, and 7 Series, as well
  as the BMW iX. Every day, several thousand instrument panels and glove
  boxes leave the two component plants. "Technological know-how,
  highly automated production processes, AI-supported quality controls
  as well as lean value streams form the foundation for efficient work
  in this field of production," explains Wolf Duwenkamp, Vice
  President Purchasing, Quality, Production Cockpit and Door Panels at
  the BMW Group plants in Landshut and Wackersdorf.<br />
  <br />
  <strong>Excellent processes, digital transformation and highest
    quality standards.</strong>
  <br />The production process at the cockpit production of the BMW
  Group plants Landshut and Wackersdorf is based on the PULL principle.
  The workstations where sequencing begins are optimally supplied
  through self-regulating control loops, ensuring a smooth material
  flow. The digital transformation of employee roles, such as the mobile
  operator, demonstrates the close collaboration between humans and
  machines and brings out additional benefits. Automated end-of-line
  inspections using AI-supported camera systems, allow an early
  detection and elimination of potential sources of error.<br />
  <br />“Lean before Digital is our guiding principle for an efficient
  and forward-looking production in the component manufacturing. The
  combination of excellent processes, digital transformation, and the
  highest quality standards forms the foundation of our success. By
  sharing our knowledge, we actively contribute to the global
  supplier qualification, ensuring robust industrialization of all
  partners,” explains Martin Frensch, Senior Vice President of Body,
  Exterior Trim and Interior in the purchasing and supplier network at
  BMW Group. “To remain competitive, we must continuously question and
  develope ourselves. The Automotive Lean Production Award shows that we
  are benchmark, which is something to be proud of,” Frensch adds.<br />
  <br />
  <strong>About Automotive Lean Production – Award & Study.</strong>
  <br />The goal of the joint project by AUTOMOBIL PRODUKTION and Agamus
  Consult is to demonstrate how the European automotive industry
  leverages the potentials of lean and digitalization. For 19 years,
  companies – both OEMs and suppliers – have been participating in a
  benchmark study, facing international competition for the prestigious
  Automotive Lean Production Awards with the guiding  principle
  “Learning from the best!”.<br />
  <br />In the event of enquiries please contact:</p>
<p>
  <br />
  <strong>BMW Group, Corporate Communications</strong></p>
<p>
  <br />Carolin Seidel, Press Spokesperson BMW Group Plant
  Landshut<br />Email: Carolin.Seidel@bmwgroup.com, Phone: +49 151 601 90340<br />
  <br />Stefanie Schindler, Communications BMW Group Plant
  Landshut<br />Email: Stefanie.Schindler@bmw.de, Phone: +49 151 601 41977<br />
  <br />Saskia Graser, Head of Communications Regensburg and
  Wackersdorf Email: Saskia.Graser@bmw.de, Phone: +49 151 6060 2014<br />
  <br />Dr. Annika Biss, Communications BMW Group Plant
  Wackersdorf<br />Email: Annika.Biss@bmwgroup.com, Phone: +49-151-601-52588<br />
  <br />Media website: <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a><br />Email: presse@bmw.de<br />
  <br /></p>
<p>
  <strong>BMW Group Plant Landshut<br />
    <br /></strong>At BMW Group Plant Landshut, around 3,800 employees
  produce light metal cast engine, suspension and body structure
  components, electrical and electronic components, plastic components
  for the vehicle exterior, carbon body components, cockpit and
  equipment features, engines and propeller shafts. Plant Landshut is
  the BMW Group’s largest component plant and supplies components to all
  BMW Group vehicle and engine plants worldwide – and therefore for
  virtually every BMW, MINI and Rolls-Royce vehicle, as well as for BMW
  Motorrad. Component production at BMW Group Plant  Landshut is
  characterised by digitalisation, a focus on sustainability and a
  commitment to responsible use of resources. With its forward-looking
  technologies, BMW Group Plant Landshut assumes the role of innovation
  driver in the technological transformation of the automotive sector
  and its supplier industry. At the Technology Centre adjacent to the
  plant, specialists from a wide range of disciplines are brought into
  development processes for new vehicles in the early stages and help to
  actively drive sustainable development of future vehicle models. BMW
  Group Plant Landshut is a socially responsible, innovative and
  attractive employer for the region of Landshut and Lower Bavaria.<br />
  <br />
  <a href="https://www.bmwgroup-werke.com/landshut/en.html">https://www.bmwgroup-werke.com/landshut/en.html</a>
  <br />
  <br /></p>
<p>
  <strong>BMW Group Plants Regensburg und Wackersdorf<br />
    <br /></strong>The BMW Group vehicle plant in Regensburg has been in
  operation since 1986 and is one of more than 30 BMW Group production
  locations worldwide. Every workday, around 1,400 vehicles of the BMW
  X1 and BMW X2 models roll off the production line at Plant Regensburg,
  destined for customers around the globe. Different types of drive
  trains are flexibly manufactured on a single production line – ranging
  from vehicles with internal combustion engines to plug-in hybrids and
  fully-electric models.<br />
  <br />BMW Group Plant Regensburg was recognised as “FACTORY OF THE
  YEAR” 2024 in the category “excellent large-series assembly” of the
  prestigious industrial competition. As it implements the BMW iFACTORY,
  the BMW Group is focused on digitalisation of the Regensburg plant
  site to create a digital and intelligently connected factory. It is
  already possible to experience in virtual form what the factory will
  look like a few years from now. Production of models for the NEUE
  KLASSE, BMW’s next generation of vehicles, will ramp up in Regensburg
  in the second half of the decade.<br />
  <br />The BMW Group plant in Wackersdorf is home to cockpit production
  and parts supply for overseas plants. With the opening of a new
  battery testing centre and commissioning of the first phase in autumn
  2024, the location has also become a key facilitator for
  electromobility. An entirely new area of expertise for the site is the
  door and flap production centre for Rolls-Royce.<br />
  <br />The BMW Group core staff at the Regensburg and Wackersdorf
  locations in eastern Bavaria consists of around 9,250 employees,
  including around 350 apprentices.<br />
  <br />
  <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/en.html</a>
  <br />
  <br />
  <br />
  <strong>The BMW Group<br /></strong>
  <br />With its four brands BMW, MINI, Rolls-Royce and BMW Motorrad,
  the BMW Group is the world’s leading premium manufacturer of
  automobiles and motorcycles and also provides premium financial
  services. The BMW Group production network comprises over 30
  production sites worldwide; the company has a global sales network in
  more than 140 countries.<br />
  <br />In 2024, the BMW Group sold over 2.45 million passenger vehicles
  and more than 210,000 motorcycles worldwide. The profit before tax in
  the financial year 2024 was € 11.0 billion on revenues amounting to €
  142.4 billion. As of 31 December 2024, the BMW Group had a workforce
  of 159,104 employees.<br />
  <br />The economic success of the BMW Group has always been based on
  long-term thinking and responsible action. Sustainability is a key
  element of the BMW Group’s corporate strategy and covers all products
  from the supply chain and production to the end of their useful life.</p>
<p>
  <br />
  <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/www.bmwgroup.com">www.bmwgroup.com</a>
  <br />LinkedIn: <a href="http://www.linkedin.com/company/bmw-group/">http://www.linkedin.com/company/bmw-group/</a><br />YouTube:
    <a href="https://www.youtube.com/bmwgroup">https://www.youtube.com/bmwgroup</a><br />Instagram:
    <a href="https://www.instagram.com/bmwgroup">https://www.instagram.com/bmwgroup</a><br />Facebook:
    <a href="https://www.facebook.com/bmwgroup">https://www.facebook.com/bmwgroup</a><br />X:
    <a href="https://www.x.com/bmwgroup">https://www.x.com/bmwgroup</a></p>
<p> </p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Carolin Seidel<br>Tel: +49-151-601-90340<br>E-mail: <a href="mailto:carolin.seidel@bmw.de">carolin.seidel@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Regensburg,Wackersdorf,Production Plants,Research &amp; Development,Production,Landshut]]></category>
            <pubDate>Fri, 08 Aug 2025 09:00:00 +0200</pubDate>
            <pp:lastModified>Fri, 08 Aug 2025 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/0cf01154-3e70-4604-beee-6fba7d5281b7/500_P90557858_highRes_employees-at-bmw-gro.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/0cf01154-3e70-4604-beee-6fba7d5281b7/500_P90557858_highRes_employees-at-bmw-gro.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/0cf01154-3e70-4604-beee-6fba7d5281b7/P90557858_highRes_employees-at-bmw-gro.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90557858_highRes_employees-at-bmw-gro.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Plant Regensburg pilots thermal oil system for heat generation in paint shop</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-plant-regensburg-pilots-thermal-oil-system-for-heat-generation-in-paint-shop/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-plant-regensburg-pilots-thermal-oil-system-for-heat-generation-in-paint-shop/</guid><pp:caseid>769221</pp:caseid><pp:summary><![CDATA[+++ Faster, more efficient transition from gas to alternative energy sources possible +++ Pilot project will save around 480 tons of CO2e per year +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>+++ Faster, more efficient transition from gas to alternative
    energy sources possible +++ Pilot project will save around 480 tons
    of CO2e per year +++</strong></p>
<p>
  <strong>Regensburg. </strong>As it transitions from natural gas to
  renewable energy, the BMW Group is gradually electrifying its paint
  shops as part of its efforts to decarbonise vehicle production. A
  recently concluded pilot project at Plant Regensburg demonstrates how
  this transition can be simplified and accelerated. The key lies in the
  installation of a thermal oil system. Using thermal oil as a heat
  transfer medium enables heat generation to be decoupled from the rest
  of the system’s components. This allows the energy supply to the
  coating lines to be adapted flexibly at any time.</p>
<p>“One advantage of switching to thermal oil is the flexibility to
  choose the energy source for heat generation in our paint shops. For
  example, thermal oil can be heated using electricity, geothermal
  energy, solar thermal energy – or even a hydrogen-powered heating
  system. The ability to change fuels quickly at any time makes our
  paint shops more resilient. If an energy source becomes scarce or
  unavailable, we can respond at short notice,” explains Samuel Flieger,
  project manager for technical planning in the Regensburg paint shop.</p>
<p>This means paint shops can already be set up to run on renewable
  energy – even if gas-free heating is not yet an option. The power grid
  is not currently equipped at all locations to handle the high energy
  demands of a fully electrified paint shop, largely due to its
  extremely energy-intensive drying processes. A thermal oil-based
  system can also be operated with gas as an interim solution.</p>
<p>
  <strong>Testing successfully concluded in Regensburg</strong></p>
<p>The Regensburg pilot project team took advantage of the production
  downtime over the New Year period to install the thermal oil
  technology. Within just a few days, they replaced the gas-powered
  drying equipment used for one of the three top coat lines with an
  electrically heated thermal oil system – complete with an innovative
  electric-powered eRTO exhaust air unit.</p>
<p>The key innovation lies in using the new electric heating unit to
  transfer heat to the thermal oil, instead of directly heating the air
  around the car bodies in the drying chamber after paint application.
  The heated oil circulates in a closed loop and, in a second step,
  heats the air in the drying chamber via heat exchangers. The
  circulating thermal oil reaches temperatures of several hundred
  degrees Celsius. Unlike water, it remains stable even at these high temperatures.</p>
<p>
  <strong>Retrofitting boosts energy efficiency</strong></p>
<p>Wherever waste heat is generated, it is recovered and reused as
  process heat. This reduces the temperature of the exhaust air released
  through the hall's roof. As a result of these retrofitting measures,
  the drying equipment’s total energy consumption has been reduced by
  approximately 40 percent. Switching to thermal oil heating, combined
  with the system's improved energy efficiency, will reduce the carbon
  footprint of BMW Group Plant Regensburg’s paint shop by approximately
  480 tons of CO<sub>2</sub>e per year.</p>
<p>
  <strong> </strong></p>
<p>
  <strong>If you have any questions, please contact:<br />
    <br /></strong>Christian Dürrschmidt, Communications
  Regensburg<br />Cell phone: +49 151 6060 5194, <br />Email: <a href="mailto:Christian.Duerrschmidt@bmw.de">Christian.Duerrschmidt@bmw.de</a><br /> <br />Saskia
  Graser, head of Communications Regensburg and Wackersdorf<br />Cell
  phone: +49 151 6060 2014, <br />Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a><br /> <br />Media
    website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a><br />Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a></p>
<p> </p>
<p>
  <strong>BMW Group Plants Regensburg and
  Wackersdorf<br /></strong> <br />The BMW Group vehicle plant in
  Regensburg has been in operation since 1986 and is one of more than 30
  BMW Group production locations worldwide. Every workday, around 1,400
  vehicles of the BMW X1 and BMW X2 models roll off the production line
  at Plant Regensburg, destined for customers around the globe.
  Different types of drive trains are flexibly manufactured on a single
  production line – ranging from vehicles with internal combustion
  engines to plug-in hybrids and fully-electric models.</p>
<p>BMW Group Plant Regensburg was recognised as “FACTORY OF THE YEAR”
  2024 in the category “excellent large-series assembly” of the
  prestigious industrial competition. As it implements the so-called BMW
  iFACTORY, the BMW Group is focused on digitalisation of the Regensburg
  plant site to create a digital and intelligently connected factory. It
  is already possible to experience in virtual form what the factory
  will look like a few years from now. Production of models for the NEUE
  KLASSE, BMW’s next generation of vehicles, will ramp up in Regensburg
  in the second half of the decade.</p>
<p>The BMW Group plant in Wackersdorf is home to cockpit production and
  parts supply for overseas plants. With the opening of a new battery
  testing centre and commissioning of the first phase in autumn 2024,
  the location also makes a significant contribution to electromobility.
  An entirely new area of expertise is the door and flap centre for Rolls-Royce.</p>
<p>The BMW Group core staff at the Regensburg and Wackersdorf locations
  in eastern Bavaria consists of around 9,250 employees, including about
  350 apprentices.</p>
<p>
  <a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Christian Duerrschmidt<br>Tel: +49-151-6060-5194<br>E-mail: <a href="mailto:christian.duerrschmidt@bmw.de">christian.duerrschmidt@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Sustainability,Regensburg,Wackersdorf,Research &amp; Development,Production]]></category>
            <pubDate>Tue, 05 Aug 2025 11:37:58 +0200</pubDate>
            <pp:lastModified>Tue, 05 Aug 2025 09:37:58 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/e6c88feb-5bf4-424e-b9a6-c152e9fdccf5/500_P90596466_highRes_flexible-use-of-ener.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/e6c88feb-5bf4-424e-b9a6-c152e9fdccf5/500_P90596466_highRes_flexible-use-of-ener.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/e6c88feb-5bf4-424e-b9a6-c152e9fdccf5/P90596466_highRes_flexible-use-of-ener.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90596466_highRes_flexible-use-of-ener.jpg]]></pp:imageTitle></item><item>
                        <title>Green light for Wackersdorf battery testing centre –  first phase goes live</title>
                        <link>https://newsroom.bmwgroup.com/global/green-light-for-wackersdorf-battery-testing-centre---first-phase-goes-live/</link>
                        <guid>https://newsroom.bmwgroup.com/global/green-light-for-wackersdorf-battery-testing-centre---first-phase-goes-live/</guid><pp:caseid>768670</pp:caseid><pp:summary><![CDATA[+++ Investment of over € 100 million in BMW Group Plant Wackersdorf – site in Upper Palatinate becomes key enabler for electromobility +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>+++ Investment of over € 100 million in BMW Group Plant
    Wackersdorf – site in Upper Palatinate becomes key enabler for
    electromobility +++</strong></p>
<p>
  <br />
  <strong>Wackersdorf. </strong>One year ago, the BMW Group announced
  plans to build a new battery testing centre at the Wackersdorf
  location. Now, the initial phase has come on-stream as planned.
  Scheduled for completion in late 2025, the site, which spans over
  8,000 square metres, will rigorously test individual battery cells,
  complete high-voltage batteries and other electric powertrain
  components for future BMW Group models early in development, well
  before they go into production.</p>
<p>The investment of around 100 million euros has primarily focused on
  complex test-bench technology and the upgrades to the building's
  existing infrastructure required for operation. Hall 80, located on
  the grounds of the Wackersdorf plant, has been remodelled for this
  purpose: Originally constructed in the 1980s for a planned
  reprocessing facility, the building has quite a history.</p>
<p>In recent months, structural work for the new battery testing centre
  has been in progress, including installation of a new floor slab. A
  total of 2,200 tonnes of structural steel and 10,000 cubic metres of
  concrete were used in the expansion.</p>
<p>The commissioning of the initial section means that the so-called
  “battery testers” will be operating around the clock to test battery
  cells during the early phase of development. Essentially, the
  electrical performance of individual battery cells is determined
  during charging and discharging under different conditions. This
  allows use cases that will be relevant for customers later to be
  simulated, long before a vehicle under development drives on the road. </p>
<p>“Parallel testing of several hundred battery cells will initially be
  possible. Once the ramp-up is complete, testing capacity will reach
  several thousand battery cells,” explains Project Manager Dr Felix
  Schmidt-Stein. In the final phase from 2025 onwards, the testing
  centre will also be used to validate the BMW Group’s battery-electric
  vehicles prior to the official launch of series production and ensure
  the required premium quality. “For example, this includes subjecting
  the batteries to vibration and shock tests,” adds Schmidt-Stein. “We
  can also simulate complex driving patterns in endurance tests,
  including charging and discharging cycles. Tests like these are
  essential for type approval of electric vehicles.” </p>
<p>“Commissioning of the first phase of the new battery testing centre
  means that the BMW Group's Wackersdorf location is poised to become a
  major facilitator in the transformation towards electromobility,”
  confirms Site Manager Christoph Peters. “The new battery testing
  centre gives our site a broader foundation. We are now adding a fourth
  pillar in Wackersdorf – in addition to supplying our overseas plants,
  cockpit production and door production for Rolls-Royce models. This
  represents a strong commitment to the future of the site.” <br />
  <strong>BMW Group Corporate Communications</strong></p>
<p>Saskia Graser, head of Communications Regensburg and
  Wackersdorf<br />Cell phone: +49 151 6060 2014, Email: Saskia.Graser@bmw.de </p>
<p>Media website: <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a> <br />Email: presse@bmw.de </p>
<p>
  <strong>BMW Group Plants Regensburg and Wackersdorf</strong></p>
<p>The BMW Group has viewed itself for decades as the benchmark for
  production technology and operational excellence in vehicle
  construction – including at its locations in Regensburg and
  Wackersdorf. <br />The BMW Group vehicle plant in Regensburg has been
  in operation since 1986 and is one of more than 30 BMW Group
  production locations worldwide. A total of up to 1,400 vehicles of the
  BMW X1 and BMW X2 models come off the production line at Plant
  Regensburg every workday – destined for customers all over the world.
  Different types of drive trains are flexibly manufactured on a single
  production line – from vehicles with internal combustion engines to
  plug-in hybrids, to fully-electric models. </p>
<p>High-voltage batteries for the electric models built in Regensburg
  are also produced locally, in direct proximity to the vehicle plant.
  They are assembled at the electric component production facility,
  which opened in 2021 at the Leibnizstrasse location.</p>
<p>BMW Innovation Park Wackersdorf also belongs to the Regensburg site.
  The 55-hectare campus built in the 1980s was originally intended as a
  nuclear reprocessing facility. The BMW Group has located its cockpit
  production there, as well as its parts supply for overseas plants. In
  addition to BMW as the largest employer, several other companies are
  also based at Innovation Park Wackersdorf. A total of around 2,500
  employees work there. <br />The BMW Group core staff at the Regensburg
  and Wackersdorf locations in eastern Bavaria is made up of around
  9,250 employees, including more than 300 apprentices.</p>
<p>
  <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a> </p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Saskia Graser<br>Tel: +49-941-770-2014<br>E-mail: <a href="mailto:saskia.graser@bmw.de">saskia.graser@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Regensburg,Wackersdorf,Drive Technologies,Research &amp; Development,Production]]></category>
            <pubDate>Tue, 19 Nov 2024 08:00:00 +0100</pubDate>
            <pp:lastModified>Tue, 19 Nov 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/f6c0d742-5970-488b-b4d7-ca1b7347db12/500_P90577255_highRes_bmw-group-plant-wack.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/f6c0d742-5970-488b-b4d7-ca1b7347db12/500_P90577255_highRes_bmw-group-plant-wack.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/f6c0d742-5970-488b-b4d7-ca1b7347db12/P90577255_highRes_bmw-group-plant-wack.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90577255_highRes_bmw-group-plant-wack.jpg]]></pp:imageTitle></item><item>
                        <title>Innovative “3D human simulation”: BMW Group Plant Regensburg uses virtual tools to plan assembly processes years ahead of NEUE KLASSE series launch</title>
                        <link>https://newsroom.bmwgroup.com/global/innovative-3d-human-simulation-bmw-group-plant-regensburg-uses-virtual-tools-to-plan-assembly-processes-years-ahead-of-neue-klasse-series-launch/</link>
                        <guid>https://newsroom.bmwgroup.com/global/innovative-3d-human-simulation-bmw-group-plant-regensburg-uses-virtual-tools-to-plan-assembly-processes-years-ahead-of-neue-klasse-series-launch/</guid><pp:caseid>768666</pp:caseid><pp:summary><![CDATA[+++ Realistic simulations of future operations already possible in digital factory layout +++ Employees trained on “digital twin” using VR goggles +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
<strong>+++ Realistic simulations of future operations already
    possible in digital factory layout +++ Employees trained on “digital
    twin” using VR goggles +++</strong></p>
<p>
<strong>Regensburg. </strong>At BMW Group Plant Regensburg, it is
  already possible to experience in virtual form what the factory will
  look like a few years from now: Production of the NEUE KLASSE, BMW’s
  next model generation, will also ramp up in Regensburg in the second
  half of the decade. Plant Director Armin Ebner: “With the NEUE KLASSE,
  which is based on an entirely new vehicle architecture, our goal as a
  company is to set new standards for digitalisation, electrification
  and circularity. Today, many years before the official launch of
  series production, virtual planning of the new production lines is
  already well underway – even as we continue to build the current BMW
  X1 and BMW X2 models.”</p>
<p>
<strong>Virtual image of new production lines years before series launch</strong></p>
<p>As part of a pilot project implemented in vehicle assembly, BMW Group
  Regensburg is utilising “3D human simulation” for the first time
  company-wide. “This allows us to not only map future manufacturing
  structures virtually in a digital twin, but also simulate the
  employees who will work on our assembly lines in the future,” explains
  Sebastian Moser, an innovation and digitalisation specialist for the
  Regensburg production system. In practice, this means future workflows
  and individual operations on the Regensburg assembly line can be
  virtually mapped and tested long before the series launch of new models.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3228/f0fc5dc3-84a8-4f67-b59c-091eeaca3647/P90561085_highRes_innovative-3d-human-.jpg"/></span></span></p>
<p>“The project is a further step towards the digital and intelligently
  connected BMW iFACTORY,” confirms Ebner. “Virtualisation, artificial
  intelligence and data science are accelerating and refining our
  planning. Digital factory planning enables us to reduce planning
  effort and realise more efficient, stable vehicle launches in the
  future.” The BMW Group is adopting a digital-first approach to
  validate and optimise complex manufacturing systems throughout its
  production network, relying on NVIDIA Omniverse Enterprise, a platform
  for creating and operating 3D industrial metaverse applications, to
  run simulations with digital twins.</p>
<p>
<strong>Human simulation already very close to future factory reality</strong></p>
<p>To date, the "3D human simulation" at the BMW Group site in
  Regensburg encompasses a complete line section with 41 operating
  cycles, covering over 1,000 square metres of assembly space. Realistic
  simulation of operations in the future factory layout makes it
  possible to already develop effective cycle specifications and conduct
  health-friendly ergonomic analyses today.</p>
<p>“The ‘model people’ on our digital assembly line move and behave just
  like real people,” explains Dominik Wottke, a production and quality
  expert in vehicle assembly at the Regensburg plant. “For example, if
  the software detects that a virtual employee needs to bend too low or
  lift a weight that is too heavy to be able to complete an operation,
  then that is also the case in the real world. We are therefore able to
  respond to this in a targeted manner and make improvements in the modelling.”</p>
<p>
<strong>VR goggles take employees on virtual journey into the future</strong></p>
<p>The “3D human simulation” also serves as a training and information
  tool. “We can use video sequences from the digital twin to take our
  associates on a journey into the future and show them what their
  future workplace will look like,” says Wottke. Project managers have
  set up a virtual room for this purpose, where employees from vehicle
  assembly in Regensburg can wear VR goggles to explore the future
  assembly line virtually and examine details up close, if needed. They
  can also practice specific operating cycles and enhance their skills,
  working alongside virtual “colleagues”. The aim is to train these
  operations so well in advance that the learning phase on the actual
  assembly line can be shortened.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3228/7a6ff52c-494f-432e-8fc9-2b0a297c76a9/P90561089_highRes_innovative-3d-human-.jpg"/></span></span></p>
<p> </p>
<p>
<strong>If you have any questions, please contact:</strong></p>
<p>Christian Dürrschmidt, Communications Regensburg</p>
<p>Cell phone: +49 151 6060 5194,</p>
<p>Email: <a href="mailto:Christian.Duerrschmidt@bmw.de">Christian.Duerrschmidt@bmw.de</a></p>
<p> </p>
<p>Saskia Graser, head of Communications Regensburg and Wackersdorf</p>
<p>Cell phone: +49 151 6060 2014,</p>
<p>Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a></p>
<p>Media website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a></p>
<p>Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a></p>
<p>
<strong> </strong></p>
<p>
<strong>BMW Group Plants Regensburg and Wackersdorf</strong></p>
<p>The BMW Group has viewed itself for decades as the benchmark for
  production technology and operational excellence in vehicle
  construction – including at its locations in Regensburg and
  Wackersdorf. <br/>The BMW Group vehicle plant in Regensburg has been
  in operation since 1986 and is one of more than 30 BMW Group
  production locations worldwide. A total of up to 1,400 vehicles of the
  BMW X1 and BMW X2 models come off the production line at Plant
  Regensburg every workday – destined for customers all over the world.
  Different types of drive trains are flexibly manufactured on a single
  production line – from vehicles with internal combustion engines to
  plug-in hybrids, to fully-electric models.</p>
<p>High-voltage batteries for the electric models built in Regensburg
  are also produced locally, in direct proximity to the vehicle plant.
  They are assembled at the electric component production facility,
  which opened in 2021 at the Leibnizstrasse location.</p>
<p>BMW Innovation Park Wackersdorf also belongs to the Regensburg site.
  The 55-hectare campus built in the 1980s was originally intended as a
  nuclear reprocessing facility. The BMW Group has located its cockpit
  production there, as well as its parts supply for overseas plants. In
  addition to BMW as the largest employer, several other companies are
  also based at Innovation Park Wackersdorf. A total of around 2,500
  employees work there.</p>
<p>The BMW Group core staff at the Regensburg and Wackersdorf locations
  in eastern Bavaria is made up of around 9,250 employees, including
  more than 300 apprentices.</p>
<p>
<a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Saskia Graser<br/>Tel: +49-941-770-2014<br/>E-mail: <a href="mailto:saskia.graser@bmw.de">saskia.graser@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Regensburg,Wackersdorf,Research &amp; Development,Production]]></category>
            <pubDate>Thu, 18 Jul 2024 09:00:00 +0200</pubDate>
            <pp:lastModified>Thu, 18 Jul 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/ee942e2f-9c73-4065-9610-6a301711803d/500_P90561087_highRes_innovative-3d-human-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/ee942e2f-9c73-4065-9610-6a301711803d/500_P90561087_highRes_innovative-3d-human-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/ee942e2f-9c73-4065-9610-6a301711803d/P90561087_highRes_innovative-3d-human-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90561087_highRes_innovative-3d-human-.jpg]]></pp:imageTitle></item><item>
                        <title>New battery testing centre: BMW Group to invest more than 100 million euros in Wackersdorf site by 2026</title>
                        <link>https://newsroom.bmwgroup.com/global/new-battery-testing-centre-bmw-group-to-invest-more-than-100-million-euros-in-wackersdorf-site-by-2026/</link>
                        <guid>https://newsroom.bmwgroup.com/global/new-battery-testing-centre-bmw-group-to-invest-more-than-100-million-euros-in-wackersdorf-site-by-2026/</guid><pp:caseid>768292</pp:caseid><pp:summary><![CDATA[Site Manager Christoph Peters: “BMW Group’s Wackersdorf location set to become a major facilitator for the transformation towards electromobility” +++ Building constructed in the 1980s as reprocessing facility to symbolise Wackersdorf site’s electric future]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>+++ Site Manager Christoph Peters: “BMW Group’s Wackersdorf
    location set to become a major facilitator for the transformation
    towards electromobility” +++ Building constructed in the 1980s as
    reprocessing facility to symbolise Wackersdorf site’s electric
    future +++ </strong></p>
<p>
  <strong>Wackersdorf. </strong>Signalling its strong commitment to the
  Wackersdorf location in Upper Palatinate and as part of its continuing
  e-mobility ramp-up, the BMW Group is investing around 100 million
  euros between now and 2026 in a new battery testing centre that will
  be integrated into the site’s existing building structures. The first
  deliverables for BMW Group development activities in the field of
  high-voltage batteries will go into regular operation as early as
  mid-2024. From then on, across a total area spanning 8,442
  m<sup>2</sup>, high-voltage batteries and other electric powertrain
  components for future BMW Group models will be put through their paces
  very early in development – well before the start of production.</p>
<p>“The BMW Group’s Wackersdorf location is set to become a major
  facilitator for the transformation towards electromobility,” confirms
  Site Manager Christoph Peters, adding that the new battery testing
  centre will broaden the foundation of the BMW Group site in
  Wackersdorf. “In addition to supplying our overseas plants, cockpit
  production and, from 2024, door production for Rolls-Royce models,
  this will become Wackersdorf’s fourth main area of activity. This, in
  turn, strengthens our location’s future viability.”</p>
<p>The around 100-million-euro investment will mainly be focused on
  complex test bench technology and the upgrades to the building’s
  existing infrastructure needed for their operation. Hall 80, located
  on the plant grounds, is currently being remodelled for this purpose:
  This building, which was originally constructed in the 1980s for the
  reprocessing facility planned at the time, has quite a history. “Now,
  this storied building will become a symbol of our plant’s electric
  future,” says Peters.</p>
<p>Structural work is already underway, including installation of a new
  floor slab for the building. In mid-2024, with commissioning of the
  first section, so-called “battery testers” will be put into service.
  From the outside, these resemble large, rather insignificant
  refrigerators – however, on the inside, they make use of cutting-edge
  high tech. Here, battery cells will be tested round the clock, early
  in their development. Essentially, the electrical performance of
  individual battery cells is determined during charging and discharging
  under different conditions. This allows use cases that will be
  relevant for customers later to be simulated, long before a vehicle
  under development drives on the road. Parallel testing of several
  hundred battery cells will initially be possible. Once the ramp-up is
  complete, testing capacity will reach several thousand.</p>
<p>In the final phase from 2025 onwards, the testing centre will also be
  used to validate the BMW Group’s battery-electric vehicles prior to
  the official launch of series production and ensure the required
  premium quality. This includes subjecting the batteries to vibration
  and shock tests, for instance, using so-called “shakers” – highly
  complex testing devices of which there are currently only a few across
  Europe. Complex driving patterns, including charging and discharging
  cycles, can also be simulated in endurance tests. Tests like these are
  essential for type approval of electric vehicles. In some cases,
  country-specific tests must also be completed. Capacity for such tests
  in the free market is currently limited – which is why the BMW Group
  is creating its own capacity with the new battery testing centre in Wackersdorf.</p>
<p>
  <strong>If you have any questions, please contact:</strong></p>
<p>
  <strong>BMW Group Corporate Communications<br /></strong>Dominik
  Hämmerl, Communications Wackersdorf<br />Cell phone: +49 151 6060
  3889, Email: Dominik.Haemmerl@bmw.de </p>
<p>Saskia Graser, acting head of Communications Regensburg and
  Wackersdorf<br />Cell phone: +49 151 6040 3232, Email: Saskia.Graser@bmw.de</p>
<p>Media website: https://newsroom.bmwgroup.com/global/en</p>
<p>Email: presse@bmw.de</p>
<p>
  <strong> </strong></p>
<p>
  <strong>BMW Group Plants Regensburg and Wackersdorf<br /></strong>The
  BMW Group has viewed itself for decades as the benchmark for
  production technology and operational excellence in vehicle
  construction – including at its locations in Regensburg and
  Wackersdorf. <br />The BMW Group vehicle plant in Regensburg has been
  in operation since 1986 and is one of more than 30 BMW Group
  production locations worldwide. A total of up to 1,000 vehicles of the
  BMW 1 Series, BMW X1 and BMW X2 models come off the production line at
  Plant Regensburg every workday – destined for customers all over the
  world. Different types of drive trains are flexibly manufactured on a
  single production line – from vehicles with internal combustion
  engines to plug-in hybrids, to fully-electric
  models.<br />High-voltage batteries for the electric models built in
  Regensburg are also produced locally, in direct proximity to the
  vehicle plant. They are assembled at the electric component production
  facility, which opened in 2021 at the Leibnizstrasse
  location.<br />BMW Innovation Park Wackersdorf also belongs to the
  Regensburg site. The 55-hectare campus built in the 1980s was
  originally intended as a nuclear reprocessing facility. The BMW Group
  has located its cockpit production there, as well as its parts supply
  for overseas plants. In addition to BMW as the largest employer,
  several other companies are also based at Innovation Park Wackersdorf.
  A total of around 2,500 employees work there.<br />The BMW Group core
  staff at the Regensburg and Wackersdorf locations in eastern Bavaria
  is made up of around 9,000 employees, including more than 300 apprentices.</p>
<p>
  <a href="https://www.bmwgroup-werke.com/regensburg/de.html">bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Dominik Haemmerl<br>Tel: +49-151-601-50401<br>E-mail: <a href="mailto:dominik.haemmerl@bmw.de">dominik.haemmerl@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Wackersdorf,Production Plants,Research &amp; Development,Production]]></category>
            <pubDate>Fri, 29 Sep 2023 09:00:00 +0200</pubDate>
            <pp:lastModified>Fri, 29 Sep 2023 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/c487a434-0281-413f-8aaf-194114680159/500_P90524671_highRes_100-million-euro-inv.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/c487a434-0281-413f-8aaf-194114680159/500_P90524671_highRes_100-million-euro-inv.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/c487a434-0281-413f-8aaf-194114680159/P90524671_highRes_100-million-euro-inv.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90524671_highRes_100-million-euro-inv.jpg]]></pp:imageTitle></item></channel>
                    </rss>