<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Global]]></title>
                    <link>https://newsroom.bmwgroup.com/global/</link>
                    <description></description>
                    <language>en</language>
                    <lastBuildDate>Wed, 14 Oct 2026 12:47:40 +0200</lastBuildDate>
                    <pubDate>Tue, 05 May 2026 10:00:00 +0200</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom Global]]></title>
                        <url>https://content.presspage.com/clients/150_3228.png</url>
                        <link>https://newsroom.bmwgroup.com/global/</link>
                        <width>144</width>
                    </image><item>
                        <title>BMW Group Plant Leipzig introduces terahertz-based measurement of plastic components in series production.</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzig-introduces-terahertz-based-measurement-of-plastic-components-in-series-production/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzig-introduces-terahertz-based-measurement-of-plastic-components-in-series-production/</guid><pp:caseid>769451</pp:caseid><pp:summary><![CDATA[+++ New inline solution enables non‑destructive measurement of paint layer thickness +++ First application of terahertz technology for exterior plastics +++ Digitalisation continues to advance in paint operations +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> As the BMW Group systematically advances the
  digitalisation of its production processes, Plant Leipzig is
  introducing a terahertz-based measurement system for plastic exterior
  components in series production. Capable of determining paint layer
  thickness non-destructively, the new technology has recently been
  scaled up to enable automated, precise and reproducible quality
  inspections directly within the production process.</p>
<p>“Terahertz measurement technology replaces complex manual inspection
  with a fully automated solution, taking quality assurance to an
  entirely new level,” says Christoph Theiselmann, Head of Exterior
  Plastics, Production at Plant Leipzig.</p>
<p>At the heart of the innovation is the terahertz measurement system
  “Irys”, developed by technology partner das‑Nano specifically for
  industrial inline inspections. The system enables contactless,
  non‑destructive measurement of multi‑layer paint systems and delivers
  real‑time data, representing a significant advance over previous
  inspection methods.</p>
<p>
  <strong>From manual inspection to inline measurement</strong></p>
<p>Until now, paint layer thickness inspections on plastic exterior
  components at Plant Leipzig have been carried out manually during
  production, using scalpels and microscopy, thereby destroying parts in
  the process. This not only generated unnecessary waste but also meant
  that deviations from specifications were often only identified at a
  later stage.</p>
<p>Terahertz technology fundamentally transforms this process: sensors
  mounted on two robots in the existing end‑of‑line measurement cell are
  automatically and precisely positioned in relation to the component,
  where they measure the thickness of the individual paint layers by
  analysing the time‑of‑flight of reflected terahertz waves.
  Measurements take only seconds and achieve accuracy down to the
  micrometre level.</p>
<p>The new technology not only delivers objective and reproducible
  measurement results, but also enables the early detection of process
  deviations. By eliminating destructive testing, it reduces waste and
  material consumption while improving both process efficiency and
  cost-effectiveness. The resulting digital measurement data enhance
  transparency within production and provide a robust foundation for
  data‑driven process control.</p>
<p>“The combination of higher measurement accuracy, direct process
  integration and full digitalisation delivers tangible benefits across
  the entire production chain, strengthening quality, economic
  efficiency and resource conservation in equal measure,” Christoph
  Theiselmann adds.</p>
<p>
  <strong>Digitalisation of plastic component paint operations</strong></p>
<p>Following the introduction of automated surface inspection in 2024,
  terahertz measurement technology marks the next step towards a fully
  digital paint shop for plastic components at Leipzig. The measurement
  and quality data it generates are available entirely in digital form,
  creating the basis for advanced data‑supported analysis. In the
  future, this data will be analysed using AI‑based methods to identify
  deviations early, evaluate trends and continuously optimise process parameters.</p>
<p>
  <strong>Pioneering role within the BMW Group and the plastics segment</strong></p>
<p>By scaling terahertz measurement technology for industrial use,
  Exterior Plastics at Leipzig has broken new ground in more than one
  respect. As well as being the first BMW Group site to integrate the
  new technology into in-house production, Plant Leipzig sets new
  standards in the plastics segment more widely, being the first to use
  terahertz technology to inspect paint layer thickness on plastic components.</p>
<p>Following successful piloting and ramp‑up, the new technology can now
  be deployed with all component carrier systems, or ‘skids’, and is
  currently being enabled for all colour variants as well. It also
  offers significant potential for rollout at other plants, particularly
  in painted body shops and across the supplier network.</p>
<p>The Exterior Plastics team is part of the Purchasing and Supplier
  Network division at Leipzig. Its 450 employees specialise in the
  manufacture of injection-moulded plastic exterior body components –
  such as bumpers, side sills and spoilers – which it supplies not just
  to Leipzig, but also to the BMW Group plants in Dingolfing and Regensburg.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Leipzig,Production,Industry 4.0]]></category>
            <pubDate>Tue, 05 May 2026 10:00:00 +0200</pubDate>
            <pp:lastModified>Tue, 05 May 2026 08:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/66159fef-de1d-4eca-b62b-75871f87f9f6/500_P90640165_highRes_terahertz-measuremen.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/66159fef-de1d-4eca-b62b-75871f87f9f6/500_P90640165_highRes_terahertz-measuremen.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/66159fef-de1d-4eca-b62b-75871f87f9f6/P90640165_highRes_terahertz-measuremen.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90640165_highRes_terahertz-measuremen.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group to deploy humanoid robots in production in Germany for the first time</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-to-deploy-humanoid-robots-in-production-in-germany-for-the-first-time/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-to-deploy-humanoid-robots-in-production-in-germany-for-the-first-time/</guid><pp:caseid>769408</pp:caseid><pp:summary><![CDATA[+++ BMW Group bringing Physical AI to Europe +++ Pilot project at BMW Group Plant Leipzig +++ New “Center of Competence for Physical AI in Production” accelerates global integration of AI and robotics in production +++ First pilot deployment of humanoid robots successfully completed at BMW Group Plant Spartanburg, USA +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Munich.</strong> The BMW Group is consistently advancing the
  digitalisation and use of artificial intelligence in production. A key
  element in this effort is “Physical AI”, which combines digital
  artificial intelligence (AI) with real machines and robots. This
  enables intelligent systems such as humanoid robots to be integrated
  into real-world production processes.</p>
<p>For the first time, the BMW Group is now bringing Physical AI to
  Europe and launching a pilot project with humanoid robots at the
  Leipzig plant. The project aims to integrate humanoid robotics into
  existing series production of cars and to explore further applications
  in the production of batteries and components.</p>
<p>“Digitalisation improves the competitiveness of our production – here
  in Europe and worldwide. The symbiosis of engineering expertise and
  artificial intelligence opens up entirely new possibilities in
  production,” said Milan Nedeljković, Member of the Board of Management
  of BMW AG, Production.</p>
<p>Last year, the BMW Group successfully implemented a pilot project
  with humanoid robots at its Spartanburg plant in the United States.
  The insights gained from this project are being leveraged to further
  develop and scale Physical AI applications.</p>
<p> </p>
<p>
  <strong>Unified IT and data model in the production system</strong></p>
<p>Artificial intelligence is already an integral part of the BMW
  Group’s production system. From the virtual factory with digital twins
  and AI‑enabled quality controls to intralogistics with autonomous
  transport solutions, intelligent systems are used in almost all
  production steps.</p>
<p>A prerequisite for the effective use of artificial intelligence in
  production is a unified IT and data model across the entire production
  system. The BMW Group has consistently transformed isolated data silos
  into a unified data platform in its production system meaning that all
  data is consistent, standardised, and available at all times. This
  enables digital AI agents to take on increasingly challenging tasks
  autonomously and in complex environments while continuously learning
  and becoming available for additional areas of application. The
  introduction of intelligent and autonomous decision‑making agents
  marks a paradigm shift in production. In combination with robots,
  these digital AI agents are what make up Physical AI.</p>
<p>“Our aim is to be a technology leader and to integrate new
  technologies into production at an early stage. Pilot projects help us
  to test and further develop the use of Physical AI – that is,
  AI‑enabled robots capable of learning – under real-world industrial
  conditions,” said Michael Nikolaides, Senior Vice President Production
  Network, Supply Chain Management at BMW Group.</p>
<p>Digitalisation and artificial intelligence are core elements of BMW
  iFACTORY and are the foundation for future‑proof, flexible, and
  competitive production.</p>
<p> </p>
<p>
  <strong>Humanoid robotics complements existing automation</strong></p>
<p>The BMW Group is strategically expanding its automation portfolio to
  include Physical AI and humanoid robotics. Humanoid robots are viewed
  as a value‑adding complement to existing automation. Particularly,
  they demonstrate potential in monotonous, ergonomically demanding, or
  safety‑critical tasks. The goal is to relieve employees and further
  improve working conditions.</p>
<p> </p>
<p>
  <strong>Center of Competence for Physical AI in Production
    consolidates expertise</strong></p>
<p>Its consistent data platform in production makes the BMW Group an
  attractive partner for technology companies seeking to test the
  possibilities of Physical AI – particularly humanoid robotics – in an
  industrial environment under real-world conditions. By setting up the
  new “Center of Competence for Physical AI in Production”, the BMW
  Group is taking the next step in consolidating its expertise and
  ensuring that the full range of knowledge can be leveraged across the organisation.</p>
<p>The BMW Group is following a clearly structured approach. Technology
  partners are evaluated according to defined maturity and
  industrialisation criteria and tested in pilot projects under
  real-world production conditions. Following a theoretical assessment,
  an evaluation is carried out at the manufacturer’s site in the
  laboratory using real use cases from the BMW production system to test
  integration capability. If this phase is successful, it is followed by
  an initial test deployment under real-world production conditions at a
  BMW Group plant and subsequently the actual pilot phase.</p>
<p> </p>
<p>
  <strong>First pilot project with humanoid robots in Europe</strong></p>
<p>In collaboration with Hexagon, a long‑standing, established partner
  of the BMW Group in the field of sensor technology and software, the
  first pilot project in Europe is now underway. Hexagon’s
  organisational unit located in Zürich, Hexagon Robotics, specialises
  in Physical AI and presented its first humanoid robot, AEON, in June
  2025. Following an initial theoretical evaluation phase and successful
  laboratory tests, there was an initial test deployment at
  BMW Group Plant Leipzig in December 2025. A further test deployment is
  planned from April 2026 to ensure full integration for the actual
  pilot phase starting in summer 2026.</p>
<p>The deployment in Leipzig is focusing on testing a multifunctional
  application of the robot. It is based on AEON’s design, whose
  human‑like body allows a wide range of hand and gripper elements or
  scanning tools to be flexibly attached and enables dynamic use on
  wheels. During testing and later in the pilot phase, the robot will be
  used in the assembly of high‑voltage batteries and in component manufacturing.</p>
<p> </p>
<p>
  <strong>Successful pilot at BMW Group Plant Spartanburg provides key
    insights for use of humanoid robots in production</strong></p>
<p>The world’s first deployment of humanoid robots at a BMW Group plant
  took place at the Spartanburg plant in the United States in 2025, in
  collaboration with the technology company Figure AI. The results
  demonstrated that Physical AI can deliver measurable added value under
  real-world conditions. Within ten months, the robot Figure 02
  supported the production of more than 30,000 BMW X3, working ten-hour
  shifts daily from Monday to Friday. Figure 02 handled the precise
  removal and positioning of sheet metal parts for the welding process –
  a task that is particularly demanding in terms of speed and accuracy
  while also being physically exhausting. In total, it moved more than
  90,000 components and covered approximately 1.2 million steps in
  around 1,250 operating hours.</p>
<p>The pilot confirmed that humanoid robots can safely perform precise,
  repetitive work steps – such as positioning components with millimetre
  precision – and provided important insights for the further deployment
  of Physical AI in production.</p>
<p>During the initial test phases with Figure 02, it was essential to
  involve all areas of the production IT infrastructure, occupational
  safety, production process management, and shop floor logistics at an
  early stage.</p>
<p>One key finding was that the transition from the laboratory to the
  actual production environment was faster than expected. Motion
  sequences trained in the laboratory could be quickly transferred into
  stable shift operation. To ensure smooth coexistence with existing
  systems, integration into the BMW Smart Robotics ecosystem was
  implemented via standardised interfaces.</p>
<p>The body shop was deliberately selected for the test phase in
  Spartanburg, as it already has a high degree of automation. BMW Group
  employees in this area have extensive experience in integrating new
  technologies and processes. For example, material supply on the line
  is already carried out almost exclusively via automated smart
  transport robots (STR). The project team’s early communication ensured
  transparency from the outset and promoted acceptance. The deployment
  of humanoid robots was met with great interest among employees and
  quickly became a natural part of everyday work during the course of
  the project.</p>
<p>The BMW Group and Figure are currently evaluating additional use
  cases for deploying the Figure 03 robot.</p>
<p> </p>
<p>
  <strong>Additional quotes for use:</strong></p>
<p> </p>
<p>
  <strong>Michael Nikolaides, Senior Vice President Production Network,
    Supply Chain Management at BMW Group:</strong></p>
<p>“Our aim is to be a technology leader and to integrate new
  technologies into production at an early stage. Pilot projects help us
  to test and further develop the use of Physical AI – that is,
  AI‑enabled robots capable of learning – under real-world industrial
  conditions. The successful first deployment of humanoid robots at our
  BMW Group plant in Spartanburg in the USA proves that a humanoid robot
  can function not only under controlled laboratory conditions but also
  in an existing automotive manufacturing environment.”</p>
<p> </p>
<p>
  <strong>Michael Ströbel, Head of Process Management and
    Digitalisation, Order to Delivery at BMW Group:</strong></p>
<p>“We are delighted to deploy a humanoid robot for the first time in a
  pilot project at a plant in Germany. Following evaluation by our
  Center of Competence for Physical AI in Production, tests were carried
  out in the laboratory and at Plant Leipzig at the end of last year.
  This year, our focus is on step‑by‑step integration into our
  production system to explore a wide range of applications. The
  emphasis is on researching multifunctional use of the robot in various
  production areas such as battery manufacturing for energy modules and
  component production for exterior parts. With Hexagon, we have found a
  proven long‑standing partner with a highly innovative approach to
  humanoid robotics for this project.”</p>
<p> </p>
<p>
  <strong>Felix Haeckel, Team Lead CoC Physical AI for Production:</strong></p>
<p>“At our new Center of Competence for Physical AI in Production, we
  are pooling our expertise to make knowledge on AI and robotics widely
  usable within the company. In recent years, we have built up an
  international team of experts that, in addition to in‑house research
  and programming, is dedicated to the gradual integration of AI into
  the existing production system. At the same time, our team in Munich
  is driving its own robotics research to set up, support, and further
  develop pilot projects in the field of Physical AI at our plants.”</p>
<p> </p>
<p>
  <strong>Arnaud Robert, President of Hexagon Robotics:</strong></p>
<p>“We are very pleased to be working with the BMW Group to advance the
  use of humanoid robots in real‑world environments.”</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Benedikt Torka<br>Tel: +49-151-601-32455<br>E-mail: <a href="mailto:benedikt.torka@bmwgroup.com">benedikt.torka@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Production Plants,Leipzig,Research &amp; Development,Innovation,Spartanburg,Artificial Intelligence]]></category>
            <pubDate>Fri, 27 Feb 2026 15:03:00 +0100</pubDate>
            <pp:lastModified>Fri, 27 Feb 2026 14:03:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/f2923197-ca1c-4f11-ae5d-45a37242aee5/500_P90630889_highRes_humanoid-robotics-at.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/f2923197-ca1c-4f11-ae5d-45a37242aee5/500_P90630889_highRes_humanoid-robotics-at.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/f2923197-ca1c-4f11-ae5d-45a37242aee5/P90630889_highRes_humanoid-robotics-at.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90630889_highRes_humanoid-robotics-at.jpg]]></pp:imageTitle></item><item>
                        <title>20 years of driving the future: Representatives from politics, business and society congratulate BMW Group Plant Leipzig on two decades of series production</title>
                        <link>https://newsroom.bmwgroup.com/global/20-years-of-driving-the-future-representatives-from-politics-business-and-society-congratulate-bmw-group-plant-leipzig-on-two-decades-of-series-production_20260723111612715/</link>
                        <guid>https://newsroom.bmwgroup.com/global/20-years-of-driving-the-future-representatives-from-politics-business-and-society-congratulate-bmw-group-plant-leipzig-on-two-decades-of-series-production_20260723111612715/</guid><pp:caseid>769311</pp:caseid><pp:summary><![CDATA[+++ Over 6,600 jobs with BMW created +++ More than €5.6 billion invested +++ Production expected to reach new record in 2025 +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> As BMW Group Plant Leipzig celebrates its
  20<sup>th</sup> anniversary, a stream of high-ranking representatives
  from politics, business and civil society today came to the plant to
  offer their congratulations on its two-decade success story. Among
  them were Barbara Meyer, Secretary of State for the Free State of
  Saxony, and the Lord Mayor of Leipzig Burkhard Jung. Both highlighted
  the plant’s importance for the economic development of the
  Leipzig/Halle region, but also for Saxony more generally. Milan
  Nedeljković, Member of the Board of Management of BMW AG responsible
  for Production, emphasised Leipzig’s pioneering spirit and extreme
  flexibility as factors in its success.</p>
<p>Since 2005 Plant Leipzig has produced almost 4,000,000 vehicles and
  received over €5.6 billion so far in investment from the BMW Group,
  creating 6,680 jobs with BMW. More than 11,600 people in total
  currently work at the site, which has undergone constant improvement
  over the years to enhance efficiency, flexibility and innovation, and
  prepare for the future. Today Leipzig is the only BMW Group plant to
  produce BMW and MINI vehicles side by side on the same production line
  – to customer specification and with the full range of drive options,
  from combustion engine to hybrid or electric drive.</p>
<p>Capacity utilisation is currently high at Plant Leipzig, with
  round-the-clock production in three shifts. This year the plant is
  expecting to achieve a new production record, its last being in 2024,
  when output totalled 246,195 vehicles. In 2025 Plant Leipzig will once
  again be a key contributor to the over 1,000,000 vehicles made at BMW
  Group plants in Germany. These account for roughly one in every four
  of all vehicles made in this country by the various manufacturers
  operating here.</p>
<p>Milan Nedeljkovic, Member of the Board of Management for Production,
  sees Leipzig truly ready for the future: “Leipzig is synonymous with
  innovation and digitalisation – and has proved it time and again over
  the last 20 years. Because of its flexibility and efficiency, it is a
  key cornerstone in what we do, as we believe in Germany’s strength
  within our global production network.”</p>
<p>
  <a name="_Hlk214290210"></a>Alongside flexibility and efficiency,
  Plant Director Petra Peterhänsel emphasised another key factor in
  Leipzig’s success: its capacity for innovation. “Here in Leipzig, we
  have paved the way for many innovations. One was the first electric
  BMW – the BMW i3. Another is the use of hydrogen, which we are already
  applying in intralogistics and will soon utilise in the paint shop
  too.” Looking ahead, Peterhänsel commented: “We are currently
  investing hundreds of millions in extending and modernising our
  systems and structures to prepare our plant for forthcoming vehicle
  generations. This will set the course for our future and keep Leipzig competitive.”</p>
<p>Saxony’s Minister President Michael Kretschmer emphazises: “BMW in
  Leipzig has completely reshaped our economic history. BMW has always
  been focused on technical progress and people’s real needs, on the
  cars they truly want to drive. If it continues on this path, it will
  remain at the forefront in the future as well.”</p>
<p>Lord Mayor Burkhard Jung highlighted the plant’s importance for the
  city of Leipzig: “We are very pleased indeed that the largest
  industrial employer in our city is looking back on 20 years of
  success. while also looking forward to a bright future. It will
  benefit not just employees, but our city as a whole, of course.
  Congratulations! And here’s to another 20 years of successful collaboration.”</p>
<p>For more detailed information on the Plant Leipzig success story,
  click <a href="https://newsroom.bmwgroup.com/global/en">HERE</a>
  to view our press release from 1 March 2025.</p>
<p> </p>
<p>
  <strong>If you have any questions, please contact: </strong></p>
<p>Kai Lichte, Head of Communications for BMW Group Plants Leipzig,
  Berlin and Eisenach</p>
<p>Telephone: +49-(0)341-445-38000</p>
<p>Mobile: +49-(0)176-601-51240</p>
<p>Email: <a href="mailto:Kai.Lichte@bmwgroup.com">Kai.Lichte@bmwgroup.com</a></p>
<p> </p>
<p>
  <strong>BMW Group Plant Leipzig</strong></p>
<p>BMW Group Plant Leipzig first started series production in March
  2025. Today it manufactures up to 1,300 vehicles a day, which
  currently comprise the BMW 1 Series, BMW 2 Series Gran Coupe, BMW 2
  Series Active Tourer and the MINI Countryman. The BMW Group has
  invested a total of more than €5,6 billion in its Leipzig site, where
  the regular workforce currently totals more than 6,600 employees.</p>
<p>Internet: <a href="http://www.bmw-werk-leipzig.de">www.bmw-werk-leipzig.de</a></p>
<p>Instagram: <a href="https://www.instagram.com/bmwgroupwerkleipzig">https://www.instagram.com/bmwgroupwerkleipzig</a></p>
<p> </p>
<p>
  <strong>The BMW Group</strong></p>
<p>With its four brands BMW, MINI, Rolls-Royce and BMW Motorrad, the BMW
  Group is the world’s leading premium manufacturer of automobiles and
  motorcycles and also provides premium financial services. The BMW
  Group production network comprises over 30 production sites worldwide;
  the company has a global sales network in more than 140 countries.</p>
<p>In 2024, the BMW Group sold over 2.45 million passenger vehicles and
  more than 210,000 motorcycles worldwide. The profit before tax in the
  financial year 2023 was € 17.1 billion on revenues amounting to €
  155.5 billion. As of 31 December 2023, the BMW Group had a workforce
  of 154,950 employees.</p>
<p>The economic success of the BMW Group has always been based on
  long-term thinking and responsible action. Sustainability is a key
  element of the BMW Group’s corporate strategy and covers all products
  from the supply chain and production to the end of their useful life.</p>
<p>www.bmwgroup.com</p>
<p>LinkedIn: <a href="http://www.linkedin.com/company/bmw-group/">http://www.linkedin.com/company/bmw-group/</a></p>
<p>YouTube: <a href="https://www.youtube.com/bmwgroup">https://www.youtube.com/bmwgroup</a></p>
<p>Instagram: <a href="https://www.instagram.com/bmwgroup">https://www.instagram.com/bmwgroup</a></p>
<p>Facebook: <a href="https://www.facebook.com/bmwgroup">https://www.facebook.com/bmwgroup</a></p>
<p>X: <a href="https://www.x.com/bmwgroup">https://www.x.com/bmwgroup</a></p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Production Plants,Leipzig]]></category>
            <pubDate>Thu, 20 Nov 2025 15:49:32 +0100</pubDate>
            <pp:lastModified>Thu, 20 Nov 2025 14:49:32 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/631c1c65-2b72-4d66-be7a-ec683ca9f6b5/500_P90625514_highRes_wolfgang-tiefensee-f.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/631c1c65-2b72-4d66-be7a-ec683ca9f6b5/500_P90625514_highRes_wolfgang-tiefensee-f.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/631c1c65-2b72-4d66-be7a-ec683ca9f6b5/P90625514_highRes_wolfgang-tiefensee-f.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90625514_highRes_wolfgang-tiefensee-f.jpg]]></pp:imageTitle></item><item>
                        <title>Anniversary: 20 years of series production at BMW Group Plant Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/global/anniversary-20-years-of-series-production-at-bmw-group-plant-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/global/anniversary-20-years-of-series-production-at-bmw-group-plant-leipzig/</guid><pp:caseid>769069</pp:caseid><pp:summary><![CDATA[+++ Production launch on 1 March 2005 with BMW 3 Series Sedan +++ 3.75 million vehicles made since +++ Plant Leipzig uniquely innovative and flexible +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> On 1 March 2005 BMW Group Plant Leipzig went
  on stream – with series production of the fifth-generation BMW 3
  Series Sedan. Its construction had been announced four years earlier,
  in July 2001, with the location chosen from among more than 250
  applicants. Since then, some 3.75 million cars have rolled off the
  production lines, and the plant has been steadily extended and
  upgraded. The BMW Group has so far invested more than 5 billion euros
  in the site – and will continue to capitalise on its flexibility in
  the future.</p>
<p>BMW Group Plant Leipzig currently manufactures four models with three
  different types of drive by two different brands – all on the same
  production line: the BMW 1 Series, BMW 2 Series Active Tourer
  (including the plug-in hybrid version) and BMW 2 Series Gran Coupé as
  well as the MINI Countryman in both its fully electric and
  conventionally powered variants. When the plant was in planning,
  output was expected to total 650 units a day. Now, 20 years down the
  line, capacity stands at up to 1,300 units a day. Since 2005 there
  have been 20 different product launches of BMWs and MINIs Made in Leipzig.</p>
<p>
  <strong>Extraordinary architecture and flexible structures</strong></p>
<p>In its 20 years of existence, BMW Group Plant Leipzig has set
  standards time and again and clocked up a succession of milestones.
  The architecture of the central building alone remains impressive to
  this day. Designed by the renowned Iraqi-British architect Zaha Hadid,
  it was awarded the German Architecture Prize in 2005, the year it
  opened. As the centrepiece and linking element of the plant, it
  provides the backdrop to the spectacular procession of vehicles that
  pass overhead through the offices on their way through the production process.</p>
<p>The flexible structures of the plant halls have also proven their
  worth to this day, throughout the various expansion stages of the
  facility. Leipzig was the first assembly plant in the world to feature
  a ‘finger’ arrangement in the production hall, for example, which
  offers ideal logistics solutions and can be flexibly adapted as
  needed. Developed specifically for this site, the finger layout allows
  trucks to deliver parts and preassembliesstraight to the production
  line. It also means extensions can be added as needed and new assembly
  stations integrated easily without having to rebuild the line from
  scratch. At the moment various further extensions are being added on
  the 240-hectare site.</p>
<p>For the last 20 years, BMW Group Plant Leipzig has demonstrated
  tremendous flexibility and adaptability, accommodating new products,
  processes and technologies. It has often played a pioneering role
  within the BMW Group production network. Its first upgrade consisted
  of the addition of a new press shop. This went into operation in 2009
  and incorporated the first high-speed servo press in the world, able
  to produce pressed parts with unprecedented speed and efficiency. By
  2014 three additional large-scale presses and two coil systems for
  body panels had also been installed, completing the press shop upgrade.</p>
<p>
  <strong>Pioneer in electromobility </strong></p>
<p>One particularly defining moment for Plant Leipzig was the decision
  to produce its first fully electric vehicle there, making it the
  birthplace of electromobility at the BMW Group. Between 2013 and 2022
  more than 250,000 all-electric BMW i3 vehicles rolled off the
  production lines. Their carbon bodies were a world first in series
  production. In 2014 the BMW i8 followed: the first plug-in hybrid by
  the BMW Group, it featured an award-winning, futuristic design and
  progressive technologies, which together made it an icon among
  sportscars. With 20,500 units made – including the BMW i8 roadster
  launched in 2018 – the era drew to a close in 2020.</p>
<p>But the team’s expertise in electromobility continues: in 2021 BMW
  Group Plant Leipzig launched e-component manufacturing for
  high-voltage battery production. Having started with the production of
  battery modules for the BMW Group production network, facilities were
  expanded within four years to include further stages of manufacturing
  and additional production lines. Since the start of MINI Countryman
  Electric production in March 2024, Plant Leipzig has carried out the
  entire process of high-voltage battery manufacturing for the fifth
  generation of batteries, with its five cell-coating lines, three
  module assembly lines and two lines for high-voltage battery assembly.
  The batteries are used in the MINI Countryman Electric and fully
  electric BMW models at various BMW Group sites.</p>
<p>
  <strong>From rear-wheel to front-wheel drive </strong></p>
<p>It’s not just the BMW i8 that made 2014 a landmark year: it was also
  the year production of the first generation of BMW 2 Series Active
  Tourer began. This brought fundamental change to BMW Group Plant
  Leipzig: it was the first ever BMW with a front-wheel
  drive architecture and paved the way for this drive technology to
  become integrated into Plant Leipzig’s production lines. Thanks to
  Leipzig’s flexibility, the sports activity tourer was able to roll off
  the same line as the BMW 1 Series, 2 Series and first-generation BMW
  X1, all of which are rear-wheel drives.</p>
<p>Integrating the BMW 2 Series Active Tourer required just a few minor
  adjustments to the paintshop and assembly, but in the bodyshop, its
  new front-wheel drive concept and vehicle architecture meant a whole
  new production area was needed. About a year and a half later,
  production of a plug-in hybrid model was launched: the BMW 225xe. Like
  the BMW i8, this featured a combined combustion-engine and electric
  drive. Its successor, the second-generation BMW Active Tourer, in
  production since 2021, is also manufactured with either a plug-in
  hybrid drive or an internal combustion engine. In 2021, Leipzig’s
  rear-wheel drive era came to an end when the BMW 2 Series Coupé, BMW 2
  Series Convertible and BMW M2 were phased out.</p>
<p>Production of the MINI Countryman is another USP of Plant Leipzig
  within the production network: it is the only full vehicle production
  facility in the BMW Group to produce BMW- and MINI-badged cars on one
  and the same production line.</p>
<p>
  <strong>Important employer in the region</strong></p>
<p>With some 6,800 BMW employees and more than 11,000 people based
  locally, the BMW Group plant is a major contributor to the economy and
  a key employer in the region. When it first went on stream, it had
  roughly 2,600 BMW employees, with plans for around 5,500 jobs over the
  medium term.</p>
<p>In 2001, when Leipzig was chosen as the site for a new plant, the
  enthusiasm and welcome across the region were huge. Job applications
  poured in. On the day of the announcement alone, the specially
  established call centre took more than 4,000 calls. Over the next few
  days, the post bags were full, and by September 2001 thirty-five
  apprentices had become the first cohort to receive an employment
  contract with BMW Group Plant Leipzig. Since then, Leipzig has trained
  some 1,100 apprentices.</p>
<p>Last year Plant Leipzig opened its Talent Campus. This accommodates
  training and development spaces in a single new building on the plant
  premises, offering the perfect conditions for employee training.</p>
<p>In 2024 the MINI Countryman meant production volumes increased,
  marking another first for Leipzig: the introduction of nightshifts –
  unprecedented in the history of the plant.Today, BMW and MINI vehicles
  are manufactured round the clock, in three shifts. The additional
  shift has created jobs for another 900 employees.</p>
<p>
  <strong>Progressive energy management</strong></p>
<p>Planning the BMW plant in Leipzig, efficient and sustainable
  processes played a crucial role – not just in vehicle production but
  in energy supplies as well. Visible from afar, the plant’s four wind
  turbines are among its landmark features and have been powering
  production with green energy since 2013. With a total capacity of 10
  megawatts, they generate 26 gigawatt hours a year of electricity from
  wind energy – enough to cover about 15 percent of the plant’s total
  energy needs.</p>
<p>In addition, BMW Group Plant Leipzig is equipped for interim energy
  storage, with a battery storage farm that went into operation in 2017.
  This comprises up to 700 second-life high-voltage batteries from BMW
  i3 cars, enabling us to optimise local energy management and help
  stabilise the electricity network.</p>
<p>Looking to the future, BMW Group Plant Leipzig attaches great
  importance to hydrogen as a fuel. In pursuit of its vision of largely
  decarbonising production – by replacing fossil fuels with hydrogen –
  it will need sufficient supplies from a grid. A regional hydrogen
  network is currently under construction, and Plant Leipzig plans to
  tap into it.</p>
<p>BMW Group Plant Leipzig has extensive experience of working with
  hydrogen, having already used it for in-house plant logistics for more
  than a decade. A pioneer in the automotive industry, it opened
  Germany’s first indoor hydrogen filling station in 2013. It now
  operates five such facilities for refuelling forklifts and tug trains
  in intralogistics. Its hydrogen fuel cell-powered fleet currently
  consists of over 200 vehicles and is one of the largest in Europe.</p>
<p>Plant Leipzig was also the first car plant in the world to introduce
  a brand-new bivalent burner technology that can run on either natural
  gas or hydrogen. It can even switch between the two while operations
  are ongoing. In the paintshop, five such gas- and hydrogen-capable
  burners are currently used to dry the contrast roofs of the MINI
  Countryman, BMW 1 Series and BMW 2 Series Gran Coupe, and another six
  have replaced the previous systems in the PVC drying section.</p>
<p>BMW Group Plant Leipzig is currently undergoing further extensions
  and upgrades in preparation for forthcoming models – and for the next
  20 years in its history.</p>
<p> </p>
<p>BMW Group Plant Leipzig – Key milestones:</p>
<ul>
  <li>
    <strong>2001</strong> Leipzig is chosen as the location for the new plant</li>
  <li>
    <strong>2002 </strong>Zaha Hadid’s design is selected for the
    central building. The ground-breaking is celebrated</li>
  <li>
    <strong>2003 </strong>The foundation stone is laid for the central
    building, and the topping-out ceremony is celebrated later that year</li></ul>
<ul>
  <li>
    <strong>2005</strong> Series production is launched with BMW 3
    Series. Plant Leipzig is inaugurated. The central building wins the
    German Architecture Prize</li>
  <li>
    <strong>2007 </strong>Production of the three-door BMW 1 Series and
    the BMW 1 Series Coupé begins</li>
  <li>
    <strong>2009</strong> Leipzig produces its 500,000<sup>th</sup> car.
    Production of the first generation of BMW X1 begins. The press shop
    opens with the world’s first high-speed servo press</li>
  <li>
    <strong>2011</strong> Plant Leipzig delivers its
    1,000,000<sup>th</sup> BMW</li></ul>
<ul>
  <li>
    <strong>2013</strong> Four wind turbines go on stream. Production of
    the BMW i3 begins. Carbon is used in series production – a world first</li>
  <li>
    <strong>2014</strong> Production of the BMW i8 begins. Plant Leipzig
    is extended for production of the BMW 2 Series Active Tourer (the
    first front-wheel drive BMW). The press shop is upgraded</li>
  <li>
    <strong>2016</strong> Plant Leipzig delivers its
    2,000,000<sup>th</sup> BMW</li>
  <li>
    <strong>2018</strong> The plant is upgraded</li>
  <li>
    <strong>2021</strong> Plant Leipzig delivers its
    3,000,000<sup>th</sup> BMW. Battery module production begins</li>
  <li>
    <strong>2022 </strong>The BMW i3 is phased out</li>
  <li>
    <strong>2023</strong> Production of the MINI Countryman begins</li>
  <li>
    <strong>2024</strong> Production of three models begins: the MINI
    Countryman Electric, fourth-generation BMW 1 Series and
    second-generation BMW 2 Series Gran Coupé. Night shifts are
    introduced in assembly</li></ul>
<p> </p>
<table border="1" cellpadding="0" cellspacing="0" style="border-collapse: collapse;width: 102.204%;height: 721.4px;" width="65%">
  
    <tr style="height: 49.0px;">
      <td colspan="3" nowrap="nowrap" style="width: 100.132%;"><p>
          <strong>All BMW Models made by BMW Group Plant Leipzig</strong></p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;"><p>
          <strong>Model</strong></p></td><td nowrap="nowrap" style="width: 31.1415%;"><p>
          <strong>Production period</strong></p></td><td nowrap="nowrap" style="width: 17.008%;"><p>
          <strong>Quantity</strong></p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;"><p>
          <strong>BMW 3 Series Sedan </strong>E90</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2005
          - 2009</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>333.427</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 1 Series three door </strong>E81</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2007
          - 2011</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>187.263</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 1 Series Coupé </strong>E82</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2007
          - 2013</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>130.205</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 1 Series Convertible </strong>E88</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2007
          - 2013</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>131.664</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW X1 </strong>E84</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2009 -
        2015</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>635.194</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 1 Series M Coupé </strong>E82</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2011
          - 2012</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>6.342</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 1 Series five door </strong>F20</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2012
          - 2019</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>424.111</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 2 Series Coupé </strong>F22</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2013
          - 2021</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>165.224</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW i3 </strong>i01</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2013 -
        2022</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>250.271</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW i8 </strong>i12</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2014 -
        2020</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>16.581</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 2 Series Active Tourer </strong>F45</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2014
          - 2021</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>368.503</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 2 Series Convertible </strong>F23</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2014
          - 2021</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>119.092</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW M2 </strong>F87</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2015 -
        2021</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>61.856</p></td></tr>
    <tr style="height: 25.0px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW i8 Roadster </strong>i15</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2018
          - 2020</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>3.884</p></td></tr>
    <tr style="height: 30.6px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 1 Series five door </strong>F40</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2019
          - 2024</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>442.859</p></td></tr>
    <tr style="height: 30.6px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 2 Series Gran Coupé </strong>F44</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2019
          - 2024</p></td><td style="width: 17.008%;"><p>220.795</p></td></tr>
    <tr style="height: 31.6px;">
      <td nowrap="nowrap" style="width: 51.9823%;" valign="bottom"><p>
          <strong>BMW 2 Series Active Tourer</strong> U06</p></td><td nowrap="nowrap" style="width: 31.1415%;" valign="bottom"><p>2021
          - *</p></td><td nowrap="nowrap" style="width: 17.008%;" valign="bottom"><p>103.390</p></td></tr>
    <tr style="height: 25.0px;">
      <td style="width: 51.9823%;"><p>
          <strong>MINI Countryman</strong> U25</p></td><td style="width: 31.1415%;"><p>2023 - *</p></td><td style="width: 17.008%;"><p>95.150</p></td></tr>
    <tr style="height: 27.0px;">
      <td style="width: 51.9823%;"><p>
          <strong>BMW 1 Series five door </strong>F70</p></td><td style="width: 31.1415%;"><p>2024 - *</p></td><td style="width: 17.008%;"><p>41.817</p></td></tr>
    <tr style="height: 25.0px;">
      <td style="width: 51.9823%;"><p>
          <strong>BMW 2 Series Gran Coupé </strong>F74</p></td><td style="width: 31.1415%;"><p>2024 - *</p></td><td style="width: 17.008%;"><p>4.109</p></td></tr>
    <tr style="height: 60.4px;">
      <td colspan="3" nowrap="nowrap" style="width: 100.132%;"><p> </p>
        <p>* Stand 12/2024</p></td></tr></table><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Production Plants,Leipzig]]></category>
            <pubDate>Fri, 28 Feb 2025 08:00:00 +0100</pubDate>
            <pp:lastModified>Fri, 28 Feb 2025 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/67aa50b9-e4f6-4d69-bf80-bafc34b963de/500_P90589788_highRes_start-of-series-prod.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/67aa50b9-e4f6-4d69-bf80-bafc34b963de/500_P90589788_highRes_start-of-series-prod.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/67aa50b9-e4f6-4d69-bf80-bafc34b963de/P90589788_highRes_start-of-series-prod.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90589788_highRes_start-of-series-prod.jpg]]></pp:imageTitle></item><item>
                        <title>Start of production for the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/global/start-of-production-for-the-new-bmw-2-series-gran-coupe-at-bmw-group-plant-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/global/start-of-production-for-the-new-bmw-2-series-gran-coupe-at-bmw-group-plant-leipzig/</guid><pp:caseid>768746</pp:caseid><pp:summary><![CDATA[+++ Second generation of the compact four-door Coupé +++ Enhanced elegance and dynamics +++ New production facility in body shop +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The BMW 2 Series Gran Coupé is made
  exclusively at BMW Group Plant Leipzig, where production of the second
  generation is now being launched. It joins the BMW 1 Series, BMW 2
  Series Active Tourer and MINI Countryman in the portfolio of models
  made at the plant, which puts out up to 1,300 vehicles a day. The four
  models with three different drive options by two different brands are
  all made on a single production line – a testament to the extreme
  flexibility of production at Leipzig. The BMW 2 Series Gran Coupé is
  due for market launch in March 2025.</p>
<p>Five years ago, the four-door Coupé for the compact segment was an
  all-new product presented by BMW as a more luxurious alternative to
  the classic sedan. Production of the first BMW 2 Series Gran Coupé
  started in Leipzig on 1 November 2019, with market launch in March
  2020. The main markets have been the UK, China and the US.</p>
<p>
  <strong>Sporty, elegant design </strong></p>
<p>The new BMW 2 Series Gran Coupé is captivating, with its expressive
  styling, completely new range of engines, extensively revised
  suspension technologies and an innovative system for partially
  automated driving and parking that comes as standard. It has also
  gained 25 millimetres in height and 20 millimetres in length.</p>
<p>The exterior design is defined by a low front section angled deep to
  the road, a dynamically elongated silhouette and a powerful-looking
  rear, lending the new BMW 2 Series Gran Coupé even more sporty
  elegance. The tailgate is assembled with the help of a completely new
  production machine that was installed at the Plant Leipzig bodyshop
  specially for the purpose and features laser-beam welding technology.
  Like the new BMW 1 Series, which has been rolling off the production
  line since July, the BMW 2 Series Gran Coupé features the striking,
  broad BMW kidney grille with its innovative combination of vertical
  and diagonal bars. From March 2025 this will be available with an
  optional illuminated surround as well.</p>
<p>
  <strong>New engines and colours </strong></p>
<p>The redesigned interior of the four-door BMW 2 Series Coupé is
  entirely leather-free and comes complete with Curved Display, just
  like all the other BMW models made in Leipzig. Reengineered seats
  offer enhanced comfort, especially on longer journeys.</p>
<p>The top-of-the-range version is the BMW M235 xDrive Gran Coupé,
  powered by a 221kW/300 hp four-cylinder engine (combined fuel
  consumption according to WLTP: 8.2-7.5 l/100 km; combined CO<sub>2
  </sub>emissions according to WLTP: 185-170 g/km; fuel consumption
  according to Pkw-EnVKV: 8.2 l/100 km; CO<sub>2</sub> emissions
  according to Pkw-EnVKV: 185 g/km; CO<sub>2 </sub>class according to
  Pkw-EnVKV: G). At market launch in March 2025, the engine portfolio
  will include another petrol engine plus two diesel options.</p>
<p>The compact BMW 2 Series four-door is currently available in two
  unicolour, seven metallic and four BMW Individual finishes as well as
  a wide range of BMW Individual special paints. An optional contrast
  roof is also available, in high-gloss black.</p>
<p>
  <strong>Plant extension and nightshifts support increased production volume</strong></p>
<p>With the production launch of the second-generation BMW 2 Series Gran
  Coupé, the model family at BMW Group Plant Leipzig is now complete.
  “The new BMW 2 Series Gran Coupé, BMW 1 Series, BMW Active Tourer,
  MINI Countryman and our first fully electric model, the MINI
  Countryman Electric, make for good capacity utilisation at Plant
  Leipzig. Our products are very popular with customers,” says Plant
  Director Petra Peterhansel.</p>
<p>BMW Group Plant Leipzig has been undergoing comprehensive extension
  since 2018 and can now manufacture up to 350,000 cars a year – 100,000
  more than previously. Since November 2023 its production volumes have
  increased thanks to the MINI Countryman, making it the only BMW Group
  plant to manufacture cars by two brands on the same production line.
  Plant Leipzig can produce up to 500 MINI and approx. 800 BMW vehicles
  a day, with increased volumes helping to secure employment and
  generating as many as 900 new jobs in vehicle production alone</p>
<p>in 2024. Since opening for business in 2005, Plant Leipzig introduced
  nightshifts in assembly for the first time in September of this year
  and now manufactures BMW and MINI vehicles round the clock in three shifts.</p>
<p> </p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>
  <strong>CO<sub>2</sub>-Emissions & Consumption</strong></p>
<p>
  <strong>BMW M235 xDrive Gran Coupé:</strong> combined fuel consumption
  according to WLTP: 8.2 – 7.5 l/100 km (62 miles); combined
  CO2 emissions according to WLTP: 185 – 170 g/km; combined fuel
  consumption according to Pkw-EnVKV: 8.2 l/100 km (62 miles); combined
  CO2 emissions according to Pkw-EnVKV: 185 g/km; CO2 class according to
  Pkw-EnVKV: G.  </p>
<p>
  <strong>BMW 220 Gran Coupé:</strong> combined fuel consumption
  according to WLTP: 5.8 – 5.2 l/100 km (62 miles); combined
  CO2 emissions according to WLTP: 131 – 119 g/km; combined fuel
  consumption according to Pkw-EnVKV: 5.8 l/100 km (62 miles); combined
  CO2 emissions according to Pkw-EnVKV: 131 g/km; CO2 class according to
  Pkw-EnVKV: D.</p>
<p>
  <strong>BMW 220d Gran Coupé:</strong> combined fuel consumption
  according to WLTP: 4.6 – 4.2 l/100 km (62 miles); combined
  CO2 emissions according to WLTP: 121 – 110 g/km; combined fuel
  consumption according to Pkw-EnVKV: 4.6 l/100 km (62 miles); combined
  CO2 emissions according to Pkw-EnVKV: 121 g/km; CO2 class according to
  Pkw-EnVKV: D. </p>
<p>
  <strong>BMW 218d Gran Coupé</strong>: combined fuel consumption
  according to WLTP: 5.0 – 4.6 l/100 km (62 miles); combined
  CO2 emissions according to WLTP: 132 – 120 g/km; combined fuel
  consumption according to Pkw-EnVKV: 5.0 l/100 km (62 miles); combined
  CO2 emissions according to Pkw-EnVKV: 132 g/km; CO2 class according to
  Pkw-EnVKV: D.</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[2 Series,Gran Coupé,Production Plants,Leipzig,Production,Product,BMW]]></category>
            <pubDate>Fri, 01 Nov 2024 08:06:00 +0100</pubDate>
            <pp:lastModified>Fri, 01 Nov 2024 07:06:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/f8eda761-a4cc-4395-a79b-2c2145837a59/500_P90577437_highRes_production-of-the-ne.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/f8eda761-a4cc-4395-a79b-2c2145837a59/500_P90577437_highRes_production-of-the-ne.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/f8eda761-a4cc-4395-a79b-2c2145837a59/P90577437_highRes_production-of-the-ne.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90577437_highRes_production-of-the-ne.jpg]]></pp:imageTitle></item><item>
                        <title>The new Talent Campus at BMW Group Plant Leipzig: Apprenticeships and training under one roof</title>
                        <link>https://newsroom.bmwgroup.com/global/the-new-talent-campus-at-bmw-group-plant-leipzig-apprenticeships-and-training-under-one-roof/</link>
                        <guid>https://newsroom.bmwgroup.com/global/the-new-talent-campus-at-bmw-group-plant-leipzig-apprenticeships-and-training-under-one-roof/</guid><pp:caseid>768834</pp:caseid><pp:summary><![CDATA[+++ 16 million euros invested in future of Leipzig site +++ New building opens, with 6,000 m2 space +++ Cutting-edge training spaces and workshops for employee development at Leipzig +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig</strong>. Every year 65 young people start their
  vocational training at BMW Group Plant Leipzig. In the future, more
  than 6,200 employees a year will develop their skills too, in
  specifically tailored courses and seminars. For the first time,
  Leipzig’s new Talent Campus brings together vocational training and
  skills development – under one roof. The new building officially
  opened on 25 October.</p>
<p>The Talent Campus offers 6,000 m<sup>2</sup> of space in total across
  two floors. For those doing their vocational training, it is equipped
  with automotive, CNC, mechatronics and mechanical workshops as well as
  spaces for pneumatics, mechatronics and IT/AR/VR. For employees
  undergoing skills development, it offers e-mobility workshops for SPS
  control technologies, robotics and automation as well as practical
  training multifunctional spaces and seminar rooms. The entire building
  is designed to be accessible and, along with all the equipment, it
  came in at an investment of 16 million euros.  </p>
<p>
  <strong>Nicole Haft-Zboril, Head of BMW Group Real Estate
  Management</strong>: “This new Talent Campus is an investment in a
  flexible, needs-focused training infrastructure at our Leipzig site.
  The construction project has been successfully completed – thanks in
  large part to our collaboration with our partner, the City of Leipzig
  – and the building has been handed over in time for the start of the
  academic year.”</p>
<p>The Talent Campus offers training and development for a wide range of
  participants, from apprentices to managers. Courses and programmes
  centre on working with high-voltage electricity for new battery
  systems and on digitalisation, with a particular focus on artificial
  intelligence, to develop the skills that will be vital in the car
  industry of the future. <strong>Moritz Kippenberger, Vice President HR
    Services, Recruiting, Qualification</strong>: “To rise to the
  challenges that lie ahead, we need new skills and abilities. At the
  BMW Group, we are preparing and supporting all our employees by giving
  them the training and education they need to make the BMW Group
  electric, digital and circular. It’s a change process that we are
  undertaking with them.”</p>
<p>BMW Group Plant Leipzig is steadily growing in terms of employees,
  buildings and production volume. When it opened in 2005, it employed
  around 2,600 people. Today there are over 6,000. <strong>Plant
    Director Petra Peterhänsel</strong>: “Investments in training and
  development are key to the transformation of our industry. We are
  securing the future of our site by fostering young talent and offering
  attractive skills development options to keep our longer-standing
  employees with us on our journey to electric and digital mobility.”</p>
<p>Training and education has always been important and integral to the
  BMW Group’s culture. Over the last three years, the training rate at
  Plant Leipzig has risen by 44 percent. The site currently offers five
  apprenticeships: production mechanic, IT system electronics
  technician, automotive mechatronics technician, mechatronics
  technician and industrial mechanic. This year BMW Group Plant Leipzig
  is also home to the state of Saxony’s Best Apprentice.</p>
<p>
  <strong>Jens Köhler, Works Council Chairman at Plant Leipzig</strong>:
  “Training has been an integral part of our history ever since the
  plant was established. I am proud that by opening this Talent Campus,
  we are establishing training and education at our plant with a
  physical entity on our premises. We have enabled a cutting-edge
  learning environment that offers practical, hands-on training and is a
  fundamental component of our site.”</p>
<p>To ensure it has the skills it needs for the years ahead, the BMW
  Group has long been systematically identifying training needs, to be
  properly prepared for the future of individual mobility.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Production Plants,Leipzig,Human Resources]]></category>
            <pubDate>Mon, 28 Oct 2024 08:30:00 +0100</pubDate>
            <pp:lastModified>Mon, 28 Oct 2024 07:30:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/7a276212-3e4a-4d32-a819-e49121713b08/500_P90576588_highRes_der-neue-talent-camp.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/7a276212-3e4a-4d32-a819-e49121713b08/500_P90576588_highRes_der-neue-talent-camp.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/7a276212-3e4a-4d32-a819-e49121713b08/P90576588_highRes_der-neue-talent-camp.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90576588_highRes_der-neue-talent-camp.jpg]]></pp:imageTitle></item><item>
                        <title>Lower-emissions transport: Electric trucks for electric components</title>
                        <link>https://newsroom.bmwgroup.com/global/lower-emissions-transport-electric-trucks-for-electric-components/</link>
                        <guid>https://newsroom.bmwgroup.com/global/lower-emissions-transport-electric-trucks-for-electric-components/</guid><pp:caseid>768883</pp:caseid><pp:summary><![CDATA[+++ Two fully electric trucks on the road for BMW Group Plant Leipzig +++ Parts supplies for high-voltage battery production +++ Annual savings of approx. 9 tonnes of CO2 +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The electrification of transport logistics
  for e-component production is gathering pace. Recently, two fully
  electrically powered trucks took over the transportation of components
  from the warehouse to the high-voltage battery production halls at BMW
  Group Plant Leipzig. Together, they will save around nine tonnes of
  CO<sub>2</sub> a year compared with conventional diesel-powered
  transport vehicles.</p>
<p>The two electric trucks complete the eight-kilometre round trip from
  the logistics centre to Leipzig’s high-voltage battery production
  halls and back up to twelve times a day. That’s almost 100 kilometres
  per truck per day – covered quietly and with zero local emissions. For
  short distances like this, electric trucks are the perfect solution.</p>
<p>The two vehicles transport parts for e-drive production, primarily of
  battery cells and battery modules. They take the parts from the
  logistics warehouse in BMW Allee to the production halls on the plant
  premises, operating round the clock in three shifts. The semi-trailer
  sports a battery symbol on the side and words proclaiming that the
  fully electric truck is on the road for Leipzig – for local
  production, emissions-free transportation and high-voltage batteries
  made in the city.</p>
<p>
  <strong>Electric trucks support high-voltage battery production</strong></p>
<p>BMW Group Plant Leipzig has been manufacturing e-components for the
  production network since 2021. Since early 2024 it has also been
  running the entire high-voltage battery production process for the
  current, fifth generation. This consists of three stages, which are
  carried out on the plant’s five cell coating, three module production
  and two high-voltage battery assembly lines – and include the
  powerpacks for the MINI Countryman Electric, manufactured in-house
  since March of this year. Battery production currently operates with a
  team of about 1,000 employees.</p>
<p>As well as high-voltage batteries for the MINI Countryman Electric,
  Plant Leipzig produces battery packs and modules for the BMW
  production network, for the fully electric BMW iX1, BMW iX2, BMW i4,
  BMW i5 and BMW iX.</p>
<p>High-voltage batteries are produced in the halls that used to be home
  to BMW i3 and BMW i8 assembly. The halls have now been converted and
  new buildings added, creating some 150,000m² of space for this area of
  production on the premises of Plant Leipzig. Annual output stands at
  up to 300,000 high-voltage batteries a year, with the BMW Group’s
  investments in e-component production at Plant Leipzig totalling more
  than 900 million euros so far.</p>
<p>Plant Director Petra Peterhänsel sees the introduction of the two
  electric trucks as a further milestone on the road to the future: “We
  are delighted to be undertaking this journey with our longstanding
  logistics partner, the Rudolph Logisitik Gruppe. The transition to
  electromobility and sustainable production affects not only our BMW
  and MINI cars but our production methods and supply chains as well.”</p>
<p>
  <strong>Lower emissions, less noise </strong></p>
<p>Powered by lithium iron phosphate (LFP) battery systems, the two
  fully electric trucks working for BMW Group Plant Leipzig are made by
  Designwerk. According to the manufacturer, the four electric drives in
  a Designwerk electric truck deliver 610 hp and are three times more
  efficient than their diesel counterparts when out on the road. They
  produce zero emissions when in operation and do not impact the
  environment with soot particles, nitrogen oxides (NOx), carbon dioxide
  (CO<sub>2</sub>) or engine noise. Studies show that when passing or
  accelerating at low speeds, an electric truck emits around five
  decibels (dB) less noise than a comparable diesel-powered vehicle.</p>
<p>Trucks are charged during drivers’ breaks. Their 340 kWh batteries
  take around 1.5 hours to recharge to 80 percent. They can be
  replenished about 3,000 times, according to Designwerk.</p>
<p>
  <strong>Open to different technologies to reduce CO<sub>2</sub> from logistics</strong></p>
<p>The use of electric trucks in logistics is among the measures in the
  BMW Group-wide Green Transport Logistics Project. This aims to reduce
  emissions from transportation in the global production and sales
  network, and takes an open approach to technologies, prioritising
  CO<sub>2</sub>-efficient energy and transportation options. Besides
  battery-electric trucks, increasing use is being made of biofuels such
  as HVO100, made from residues and waste and used at the Munich site,
  for instance. Production deliveries in Germany have also been trialled
  using bio-LNG in vehicles on the roads. Moreover, in an attempt to
  learn more about using hydrogen as a fuel for trucks, the BMW Group is
  involved in research projects such as H2Haul and HyCET.</p>
<p>By 2030 the BMW Group aims to reduce CO<sub>2</sub> emissions across
  the vehicle lifecycle by 40 percent, compared with 2019.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Drive Technologies,Leipzig,Research &amp; Development,Innovation,Logistics]]></category>
            <pubDate>Fri, 18 Oct 2024 08:00:00 +0200</pubDate>
            <pp:lastModified>Fri, 18 Oct 2024 06:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/bc7febf7-6d89-44f0-8558-5ddb9c60777c/500_P90574004_highRes_two-electric-trucks-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/bc7febf7-6d89-44f0-8558-5ddb9c60777c/500_P90574004_highRes_two-electric-trucks-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/bc7febf7-6d89-44f0-8558-5ddb9c60777c/P90574004_highRes_two-electric-trucks-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90574004_highRes_two-electric-trucks-.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Plant Leipzig’s Exterior Components section wins Automotive Lean Production Award</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzigs-exterior-components-section-wins-automotive-lean-production-award/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzigs-exterior-components-section-wins-automotive-lean-production-award/</guid><pp:caseid>768854</pp:caseid><pp:summary><![CDATA[BMW Group Plant Leipzig’s Exterior Components section, TEK, has scooped the prestigious Automotive Lean Production Award in the category for Lean Digital Transformation. It now ranks among Europe’s top production units for implementing lean production coupled with digital innovations – and sets new standards in the manufacturing sector.]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig. </strong>Organisationally, Exterior Components
  (‘Technologie Exterieur Komponenten’, TEK) forms part of the
  Purchasing and Supplier Network division at Leipzig. Its 450 employees
  produce over a million injection-moulded plastic exterior parts a
  year, including bumpers, sills and spoilers. These are supplied not
  just to Plant Leipzig but also to BMW Group Plants Dingolfing and Regensburg.</p>
<p>Explaining their decision, the jury praised the TEK for its
  consistent pursuit of the TEK 2028 vision. This is the driving force
  behind the redesign of the production system and will see the primary
  focus shift from car sets to large-scale just-in-sequence (JIS)
  production for the BMW Group. The jury cited the combination of lean
  principles and progressive digital approaches as being a key factor
  for success.</p>
<p>Christoph Theiselmann, head of the TEK, was delighted with the award:
  “I’m extremely proud of this important stage win and would like to
  thank all our employees for their outstanding team performance. This
  award is confirmation, from the highest level, of the significant
  progress the TEK has made on our journey of transformation. Going
  forward, a number of major steps still lie ahead, and enhancing and
  optimising innovations and efficiency will remain our key focus.”</p>
<p>The jury were particularly impressed by the variety of digital
  applications being implemented in the TEK, in areas such as data
  analytics, the planning and optimisation of assembly workplaces,
  quality assurance, anticipatory maintenance and virtual factory
  planning and commissioning – an excellent combination of top-down and
  bottom-up initiatives.</p>
<p>The eighteenth Lean Production Awards are presented by Agamus Consult
  and the industry magazine Automobil Produktion. The official award
  ceremony will take place on 26 and 27 November 2024 in Palmela, Portugal.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Production Plants,Leipzig]]></category>
            <pubDate>Mon, 19 Aug 2024 11:44:30 +0200</pubDate>
            <pp:lastModified>Mon, 19 Aug 2024 09:44:30 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/3ae10bd1-ffd3-401c-91af-b952a0960fd0/500_P90564828_highRes_plastic-parts-produc.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/3ae10bd1-ffd3-401c-91af-b952a0960fd0/500_P90564828_highRes_plastic-parts-produc.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/3ae10bd1-ffd3-401c-91af-b952a0960fd0/P90564828_highRes_plastic-parts-produc.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90564828_highRes_plastic-parts-produc.jpg]]></pp:imageTitle></item><item>
                        <title>BMW 1 Series production launch at BMW Group Plant Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-1-series-production-launch-at-bmw-group-plant-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-1-series-production-launch-at-bmw-group-plant-leipzig/</guid><pp:caseid>768740</pp:caseid><pp:summary><![CDATA[+++ Fourth-generation 1 Series enters production +++ More than 1.3 million BMW 1 Series made in Leipzig +++ Now available with optional contrast roof +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The first fourth-generation BMW 1 Series to
  roll off the production line at BMW Group Plant Leipzig is a BMW 120
  in Alpine White for a customer in Germany (combined fuel consumption:
  6.0 - 5.3 l/100 km (62 miles); CO2 emissions combined: 135 - 121 g/km
  according to WLTP; CO2 classes: D). The premium compact is
  manufactured exclusively at Plant Leipzig, in Saxony, where up to 500
  of the cars can be made per day. Combined with the BMW 2 Series Gran
  Coupe, BMW 2 Series Active Tourer and MINI Countryman, this puts daily
  output from Plant Leipzig at up to 1,300 vehicles. The new BMW 1
  Series is due for market launch in October 2024.</p>
<p>The new BMW 1 Series marks the start of a new chapter in the BMW
  brand’s almost 20-year success story in the compact segment.
  Production of the model first began with the three-door at Plant
  Leipzig in 2007. Since then the plant has manufactured more than 1.3
  million in a range of variants. As at the end of June 2024, nearly
  443,000 third-generation BMW 1 Series have been delivered to
  customers. “The new BMW 1 Series will remain a key factor in
  maintaining high capacity utilisation here at plant Leipzig,” said a
  confident Petra Peterhänsel, Plant Director.</p>
<p>
  <strong>Plant upgraded to increase capacity</strong></p>
<p>Since 2018 BMW Group Plant Leipzig has undergone systematic upgrades.
  It can now produce up to 350,000 units a year – 100,000 more than
  previously. It currently manufactures four models with three different
  types of drive by two different brands – all on the same production
  line. Since November 2023 output has been boosted by the MINI
  Countryman. Production of that will rise during the course of this
  year to 500 units a day, in addition to the 800 or so BMW vehicles.</p>
<p>The increase in production volumes is securing existing jobs as well
  as creating new ones. An additional 900 people are set to join vehicle
  production alone, by the end of 2024 Plant Leipzig will employ around
  7,000 people.<strong> </strong></p>
<p>
  <strong>Dynamic design, new drive portfolio </strong></p>
<p>With a dynamic design presence, completely revised drive portfolio
  and extensively improved chassis technology, the BMW 1 Series
  continues to sharpen its profile as the sportiest vehicle in the
  competition. The front end is strikingly flat and sits significantly
  lower to the road than the predecessor’s, signalling that more than
  ever, this car is geared towards sporty driving pleasure. The wide,
  forward-leaning radiator grille features an innovative arrangement of
  vertical and diagonal bars. LED headlights come as standard and give
  the car a striking “four-eyed face”.</p>
<p>The pronounced rear apron with its vertical reflectors, two-part rear
  lights and black, diffusor-style insert add to the vehicle’s powerful
  appearance. Inside, the new BMW 1 Series is now completely
  leather-free as standard. The redesigned cockpit features the BMW
  Curved Display. The optional M Sport Package makes for an even more
  dynamic look, as does the special M Sport Design equipment option,
  available from market launch in Europe.</p>
<p>
  <strong>Contrast roof – a first in the BMW 1 Series</strong></p>
<p>The body of the new BMW 1 Series is available in a choice of two
  solid-colour and seven metallic finishes. BMW Individual paintwork
  will also be on offer, along with a wide range of BMW Individual
  Special Paints. The new BMW 1 Series is also the first BMW to feature
  the optional contrast paintwork, with a roof in high-gloss black. As
  with the MINI Countryman, the roof will be painted at Plant Leipzig
  using a new, overspray-free painting process that is easier on
  resources. Known as overspray-free painting, the method is currently
  being piloted and works without producing the mist of excess paint
  that usually occurs.</p>
<p>The new BMW 1 Series is due for market launch on 5 October. The
  strongest markets for the 1 Series so far have been Germany and
  Europe, and the UK and Italy especially.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>
  <strong>BMW 120</strong></p>
<p>Combined fuel consumption according to WLTP: 6.0 – 5.3 l/100 km</p>
<p>Combined CO<sub>2</sub> emissions according to WLTP: 135 – 121 g/km</p>
<p>CO<sub>2</sub> class: D</p>
<p> </p>
<p>All performance, consumption and emissions values are provisional.</p>
<p>All the model variants, equipment levels, technical specifications,
  consumption and emission values described here correspond to what is
  available on the automomtive market in Germany. Information on
  dimensions refers to a vehicle in basic equipment in Germany,
  depending on the selected wheel and tyre size as well as selected
  optional equipment. These may change according to how the car is configured.</p>
<p>Official figures for fuel consumption, CO<sub>2</sub> emissions,
  electricity consumption and electric range were ascertained in
  accordance with the prescribed measurement procedures and correspond
  with the VO (EU) 715/2007 applicable. WLTP figures are presented as a
  range to cover all the various equipment options.</p>
<p>For more on the WLTP and NEDC procedures, go to https://www.bmw.com/en/innovation/wltp.html</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Production Plants,Leipzig,1 Series,5 Door,Product,BMW]]></category>
            <pubDate>Mon, 01 Jul 2024 08:00:00 +0200</pubDate>
            <pp:lastModified>Mon, 01 Jul 2024 06:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/36716354-1ff8-4c8b-8065-fb78ff9faabe/500_P90557796_highRes_production-of-a-new-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/36716354-1ff8-4c8b-8065-fb78ff9faabe/500_P90557796_highRes_production-of-a-new-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/36716354-1ff8-4c8b-8065-fb78ff9faabe/P90557796_highRes_production-of-a-new-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90557796_highRes_production-of-a-new-.jpg]]></pp:imageTitle></item><item>
                        <title>Production launch of the MINI Countryman Electric at BMW Group Plant Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/global/production-launch-of-the-mini-countryman-electric-at-bmw-group-plant-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/global/production-launch-of-the-mini-countryman-electric-at-bmw-group-plant-leipzig/</guid><pp:caseid>768578</pp:caseid><pp:summary><![CDATA[+++ Higher volumes and a growing team +++ New night shift in assembly +++ High-voltage batteries produced in-house +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Electrification continues at BMW Group Plant
  Leipzig: Four months after launching production of the
  combustion-engined MINI Countryman, the all-electric version is now
  rolling off the lines at Leipzig as well. After phasing out production
  of the BMW i3, the birthplace of electric mobility at the BMW Group
  has welcomed another fully electric car to its range. It now
  manufactures four models with three drive types by two brands, all on
  a single production line: the BMW 1 Series, the BMW 2 Series Active
  Tourer (including the plug-in hybrid version), the BMW 2 Series Gran
  Coupe and the MINI Countryman in both its fully electric and
  combustion-powered versions.</p>
<p>The MINI Countryman Electric represents a major step in the MINI
  brand’s transition to full electrification by 2030 and combines an
  electrified go-kart feel with zero local emissions mobility. It comes
  in two fully electric variants: the Countryman E (150 kW, 204 hp |
  electricity consumption 17.4 – 15.7 kWh/100 km | CO2 emissions 0 g/km)
  and the more powerful all-wheel Countryman SE ALL4 (230 kW, 313 hp |
  electricity consumption 18.5 – 16.8 kWh/100 km | CO2 emissions 0
  g/km).  </p>
<p>
  <strong>Consistent plant upgrades and flexible production system</strong></p>
<p>To enable production of up to 350,000 units a year – 100,000 more
  than previously – Plant Leipzig has been continuously upgraded since
  2018, with extensive additions and upgrades to the bodyshop,
  paintshop, assembly and logistics. “Our cars and components are very
  much in demand. In recent years the BMW Group has invested around 1.6
  billion euros in the Leipzig site to produce additional vehicles and
  electric components, and now we’re increasing vehicle volumes too –
  which is great news for our plant,” said Petra Peterhänsel, Plant Director.</p>
<p>The main driver behind the volume increase is the MINI Countryman.
  During the course of 2024, output will rise to almost 500 units a day
  – on top of the 800 or so BMW vehicles the plant is producing. What’s
  more, thanks to its flexible production system, Plant Leipzig is in a
  position to respond quickly to customer demand, for example by
  increasing the share of fully electric vehicles.</p>
<p>Flexible assembly structures also meant the MINI Countryman Electric
  could be integrated seamlessly into production. The situation is
  similar with the different drive units, which are all produced on one
  and the same line in aggregate assembly and prepared for what’s known
  as “marriage” with the body. The e-drives, transmissions and control
  electronics (collectively known as the highly integrated electric
  drive topology, or HEAT) for the two all-electric models are connected
  directly in the plant. A new production line was required only for the
  control electronics.</p>
<p>
  <strong>More staff and nightshifts for increased production volume</strong></p>
<p>Higher production volume means secure employment and up to 900
  additional employees in vehicle production alone. By the end of 2024,
  Plant Leipzig will employ around 7,000 BMW staff. Working hours will
  need to be adjusted in all technologies, with nightshifts in assembly
  starting for the first time in September of this year and cars being
  produced round the clock in three shifts.</p>
<p>“Plant Leipzig first went on stream in 2005 with about 2,600
  employees in production. 19 years later there are over 7,000. Over the
  years, the plant has grown steadily and considerably. The start of
  nightshifts in assembly represents another important milestone in the
  success story of our plant and is a clear show of confidence by our
  company in our site here in Leipzig,” emphasised Works Council
  Chairman Jens Köhler.</p>
<p>
  <strong>Made at Plant Leipzig: high-voltage batteries for the MINI
    Countryman Electric</strong></p>
<p>With the production launch of the MINI Countryman Electric, all three
  stages of the Gen 5 high-voltage battery production process are now
  represented at BMW Group Plant Leipzig: cell coating, module
  production and battery assembly. Operations in all three are currently
  ramping up, with five cell-coating, three module-production and two
  high-voltage battery-production lines now in place.</p>
<p>“We are in the middle of the transformation to e-mobility,” said
  Markus Fallböhmer, Head of Battery Production at the BMW Group.
  “Starting this year, Plant Leipzig will carry out every stage of our
  in-house high-voltage battery production process. It’s our next great
  step forwards.”</p>
<p>Plant Leipzig’s e-component production capacity has been increasing
  since 2021. It will now manufacture not just the high-voltage
  batteries for the MINI Countryman Electric but also e-components for
  the BMW iX1, BMW iX2, BMW i4, BMW i5 and BMW iX made at other sites.
  The e-component production unit at Leipzig currently employs some
  1,000 people.</p>
<p>To enable production of high-voltage batteries, spaces previously
  used for the BMW i3 and BMW i8 have been converted and new buildings
  added. One of them is a new hall with a footprint of about 61,000
  m<sup>2</sup>. This houses two lines capable of producing up to
  300,000 high-voltage batteries a year. The BMW Group has invested over
  900 million euros in e-component production at Plant Leipzig to date.</p>
<p>
  <strong>Resource-saving painting processes</strong></p>
<p>At launch, the fully electric MINI Countryman comes in three
  additional body colours: British Racing Green, Chili Red and Blazing
  Blue – and with MINI’s trademark contrast roof, if desired. This is
  painted using a new overspray-free method that saves resources and is
  currently being readied for series operation. The term “overspray”
  refers to the mist of excess paint particles that forms when bodies
  are painted the conventional way. With the new technique, this mist no
  longer occurs. This makes it easier to paint in multiple colours as
  the laborious process of masking is no longer required. Overspray-free
  painting also helps save CO<sub>2</sub> emissions, as exhaust from the
  cabin requires less cleansing. In addition, it requires considerably
  less conditioned air, i.e. air that is brought to the exact
  temperature and humidity required for painting. As a result, less
  energy is needed to temper air and treat exhaust.</p>
<p>The burner technology used to dry the paint on contrast roofs was
  also converted for the start of MINI Countryman production and now
  consists of a bivalent system. The fuel-flexible burners can run on
  hydrogen (H2) as well as gas (methane, CH4) and even switch between
  the two while in operation. Five such bivalent hydrogen-capable
  burners are used to produce the contrast roofs for the MINI Countryman.</p>
<p>Further burners in the paintshop will also gradually switch to
  bivalent operations, with the next six hydrogen-capable burners just
  installed. This makes Leipzig a pioneer in the automotive industry and
  takes it ever closer to lower CO<sub>2</sub> emissions. “Our vision at
  Plant Leipzig is to decarbonise production as far as possible
  by replacing fossil fuels with green hydrogen,” said Petra
  Peterhänsel, explaining the long-term focus of the facility. This will
  require sufficient green hydrogen from a grid. A regional hydrogen
  grid is currently in planning, with Plant Leipzig set to benefit.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>
  <strong>MINI</strong>
  <strong> Countryman E</strong></p>
<p>Electricity consumption combined: 17,4 – 15,7 kWh/100 km according to
  WLTP<br />CO<sub>2</sub> emissions combined according to WLTP: 0
  g/km<br />CO<sub>2</sub> Class: A<br />Electric range according to
  WLTP: 462 – 423 km</p>
<p>
  <strong>MINI Countryman SE ALL4 </strong></p>
<p>Electricity consumption combined: 18,5 – 16,8 kWh/100 km according to
  WLTP<br />CO2 emissions combined according to WLTP: 0 g/km<br />CO2
  Class: A<br />Electric range according to WLTP: 432 – 399 km</p>
<p> </p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,e-Mobility,Drive Technologies,Production Plants,Leipzig,Battery Cells,Countryman,Product,MINI]]></category>
            <pubDate>Fri, 01 Mar 2024 08:00:00 +0100</pubDate>
            <pp:lastModified>Fri, 01 Mar 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/96b4296a-2619-4c58-b2cb-82098142328b/500_P90540682_highRes_mini-countryman-e-an.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/96b4296a-2619-4c58-b2cb-82098142328b/500_P90540682_highRes_mini-countryman-e-an.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/96b4296a-2619-4c58-b2cb-82098142328b/P90540682_highRes_mini-countryman-e-an.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90540682_highRes_mini-countryman-e-an.jpg]]></pp:imageTitle></item><item>
                        <title>Leipzig loves MINI: BMW Group Plant Leipzig celebrates production launch of MINI Countryman</title>
                        <link>https://newsroom.bmwgroup.com/global/leipzig-loves-mini-bmw-group-plant-leipzig-celebrates-production-launch-of-mini-countryman/</link>
                        <guid>https://newsroom.bmwgroup.com/global/leipzig-loves-mini-bmw-group-plant-leipzig-celebrates-production-launch-of-mini-countryman/</guid><pp:caseid>768340</pp:caseid><pp:summary><![CDATA[+++ First MINI “made in Germany” +++ One production line, two brands, three drives +++ Board Member for Production Milan Nedeljković: Skill and flexibility are crucial +++ Minister President of Saxony Michael Kretschmer: A boost for the entire regional economy +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The production launch of the MINI Countryman
  marks a number of debuts and milestones: as the first MINI model to be
  made in Germany, the new MINI Countryman will roll off one and the
  same manufacturing line as the BMW 1 Series and 2 Series. Thanks to
  its flexible assembly structures, Plant Leipzig is in a position to
  produce two brands with three different drives – combustion,
  plug-in-hybrid and fully electric – all on the same production line.</p>
<p>Big Love is the motto of not just the MINI brand but also of the
  plant: Leipzig loves MINI and MINI loves Leipzig. Celebrating the
  production launch of the MINI Countryman today at a special event in
  the assembly hall were the BMW AG Board Member for Production, Milan
  Nedeljković; the Minister President of the state of Saxony, Michael
  Kretschmer; the head of the MINI brand, Stefanie Wurst; Mayor and
  Alderman for Business, Work and Digital Affairs, Clemens Schülke;
  various guests from politics and the media, and plant employees. To
  make sure everyone in the plant could experience the live broadcast of
  the celebration, the production lines stood still for almost 45 minutes.</p>
<p>Production of the largest MINI model to date marks an important step
  into the future of BMW Group Plant Leipzig. Since 2018 the company has
  invested some €700 million in the Saxony site to increase capacity and
  enable production of the MINI Countryman. In addition, this third
  generation of the vehicle will also be available with a fully electric
  drive. “Leipzig remains electrified,” said Plant Director Petra Peterhänsel.</p>
<p>“When it comes to the transformation,” Nedeljković emphasised, “skill
  and flexibility are crucial.” He added that the BMW Group had been
  quick to introduce and advance change: “Plant Leipzig plays a
  fundamental role in this regard. It was here that we launched
  production of the BMW i3 exactly ten years ago. We have since built on
  that, rolling the latest generation of electric cars out across our network.”</p>
<p>Nedeljković explained that all BMW Group plants are set up to produce
  different models with different drives – from combustion-powered to
  plug-in hybrid and fully electric – all on a single production line.
  But what’s special about Plant Leipzig, he added, is that its flexible
  production system is now being used for multiple brands for the very
  first time.</p>
<p>Michael Kretschmer, Minister President of Saxony, emphasised the
  importance of the BMW Group plant in Leipzig for the region and the
  federal state: “The BMW site in Leipzig is a success story of modern
  industrial production. Continued investments in the site and the
  launch of the MINI Countryman reaffirm the company’s commitment to
  ‘Autoland’ Saxony – and provide a boost for the entire regional
  economy, benefiting service providers and suppliers across the area.”</p>
<p>Clemens Schülke, Mayor and Alderman for Business, Work and Digital
  Affairs of the city of Leipzig was visibly pleased about the ‘new
  Leipziger’: “In my view, BMW Leipzig is an absolute success story.
  That’s why I am really looking forward to the next chapter: the first
  German MINI will be a genuine ‘Leipziger’. This model demonstrates the
  power and flexibility of our strong automotive cluster.”</p>
<p>Stefanie Wurst, head of MINI, detailed the characteristics of the new
  MINI Countryman: “The first MINI made in Germany stands for superior
  environmental credentials, not just as a product but equally in terms
  of its production. Its versatility and powerful, efficient drives make
  it the perfect companion for the city – but also for adventures beyond.”</p>
<p>Plant Director Petra Peterhänsel emphasised the importance of the
  MINI Countryman for the future of Plant Leipzig: “Today is a
  historical day for our site. As the plant develops and production of
  the MINI Countryman gets underway, our headcount will increase by over
  1,000 by the end of 2024.”</p>
<p>“Today, we can see once again just how important our plant here in
  Leipzig is for the production network as a whole,” pointed out Works
  Council Chairman Jens Köhler as he thanked the BMW Group for their trust.</p>
<p>Hosting the event was the radio and television presenter Roman
  Knoblauch. But in addition to the MINI Countryman in Smokey Green with
  a contrast roof in Energy Silver, there was a secret star of the show:
  Spike, MINI’s digital friend. As the Intelligent Personal Assistant,
  Spike will support drivers of the new MINI model family and make the
  cars even more fun to use.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>MINI Countryman SE ALL4 (combined electricity consumption: 18.5 –
  17.0 kWh/100 km according to WLTP; combined CO<sub>2</sub> emissions:
  0 g/km).</p>
<p>MINI Countryman with combustion engine (combined fuel consumption
  according to WLTP: 8.3 – 4.8 l/100 km, combined CO<sub>2</sub>
  emissions: 188 – 125 g/km)</p>
<p>*All technical data is provisional.</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Events,Locations,Production Plants,Leipzig,Production]]></category>
            <pubDate>Fri, 10 Nov 2023 12:30:00 +0100</pubDate>
            <pp:lastModified>Fri, 10 Nov 2023 11:30:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/c062fc0f-6359-40c5-9a41-49c64bc9ed10/500_P90532105_highRes_celebrating-the-prod.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/c062fc0f-6359-40c5-9a41-49c64bc9ed10/500_P90532105_highRes_celebrating-the-prod.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/c062fc0f-6359-40c5-9a41-49c64bc9ed10/P90532105_highRes_celebrating-the-prod.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90532105_highRes_celebrating-the-prod.jpg]]></pp:imageTitle></item><item>
                        <title>One line – two brands – three drives: BMW Group Plant Leipzig launches production of the MINI Countryman</title>
                        <link>https://newsroom.bmwgroup.com/global/one-line---two-brands---three-drives-bmw-group-plant-leipzig-launches-production-of-the-mini-countryman/</link>
                        <guid>https://newsroom.bmwgroup.com/global/one-line---two-brands---three-drives-bmw-group-plant-leipzig-launches-production-of-the-mini-countryman/</guid><pp:caseid>768118</pp:caseid><pp:summary><![CDATA[+++ First BMW Group plant worldwide to produce two brands on the same assembly line +++ Seamless integration through maximum flexibility +++ Investment in plant development +++ Growing the workforce +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The start of MINI Countryman production
  marks a number of firsts and milestones for BMW Group Plant Leipzig:
  for the first time, a MINI model is being made in Germany – on the
  same production line as the BMW 1 Series and 2 Series. It’s all made
  possible by the plant’s flexible structures and development. Over the
  last five years the BMW Group has invested €700 million to ready
  Leipzig for increased vehicle volumes and adapt it for MINI-specific
  requirements. By the end of 2024 the workforce in production will
  increase by over 900. In addition, the new MINI Countryman is a
  catalyst for innovations in sustainable production.</p>
<p>“By launching production of the MINI Countryman here in Leipzig, we
  are introducing multibrand operations to our flexible production
  system,” explained Milan Nedeljković, Board Member for Production.
  “Plant Leipzig also offers a number of highlights in terms of resource
  conservation in production, providing further evidence of the
  successful rollout of our long-term masterplan: the BMW iFACTORY.”</p>
<p>
  <strong>Seamless integration through flexible structures </strong></p>
<p>When it comes to production of the new MINI Countryman, the BMW Group
  is building on the skills and extreme flexibility of Plant Leipzig to
  forge new pathways in manufacturing. Seamlessly integrated into the
  production process, the MINI Countryman now rolls off the same
  assembly line as the BMW 1 Series, BMW 2 Series Gran Coupé and BMW 2
  Series Active Tourer.</p>
<p>Thanks to its flexible assembly structures, Plant Leipzig is in a
  position to produce two brands with three different drives –
  combustion, plug-in-hybrid and fully electric – all on the same
  production line. The third-generation MINI Countryman will be
  available with a petrol, diesel or fully electric powertrain, with the
  high-voltage batteries for the MINI Countryman Electric also being
  made in Leipzig. It will reach dealerships on 17 February 2024.</p>
<p>
  <strong>Investments and recruitment to increase production volume</strong></p>
<p>The BMW Group has invested some €500 million in Leipzig to increase
  production volume for new models. Since 2018 the bodyshop, paintshop,
  assembly and logistics have undergone extensive additions and
  upgrades, taking production capacity up from 250,000 units previously,
  to as much as 350,000 units a year at present.</p>
<p>To adapt the production system to MINI-specific requirements, the BMW
  Group invested around €200 million. Initially approx. 100 MINI
  Countryman cars a day will roll off the production lines, rising to
  500 during the course of next year – in addition to the almost 1,000
  BMW cars already coming out of the factory every day. This will not
  only secure existing jobs but also create up to 900 new ones in
  vehicle production alone.</p>
<p>
  <strong>Electromobility and MINI production drive development</strong></p>
<p>Another important milestone in the development and extension of Plant
  Leipzig is its transition to electromobility. “Leipzig remains
  electric,” says a cheerful Petra Peterhänsel, Plant Director. “With
  the BMW i3 and i8, we were at the vanguard of e-mobility at the BMW
  Group, and from 2024, we will be producing our next fully electric
  car: the MINI Countryman Electric. We will manufacture the
  high-voltage batteries for it in-house as well.”</p>
<p>Starting next year BMW Group Plant Leipzig will run the entire
  production process for the current fifth generation of high-voltage
  batteries. This consists of three stages: cell coating, module
  production and battery assembly. The five cell coating lines, three
  module production lines and the first high-voltage battery assembly
  lines are all in the process of going into operation, with a second
  high-voltage battery assembly line scheduled for launch in 2024.</p>
<p>Capacity for e-component production has also been increasing, since
  2021, making Plant Leipzig an important a supplier across the BMW
  production network. The parts are used in fully electric vehicles such
  as the BMW iX1, BMW i4, BMW i5 and BMW iX. E-component production in
  Leipzig currently employs over 800 people, and there are plans to
  develop it further, with investments totalling more than €800 million.</p>
<p>
  <strong>Sustainable materials and production </strong></p>
<p>The MINI Countryman Electric is a major step in the MINI brand’s
  transition to full electrification by 2030 and combines an electrified
  go-kart feel with a reduced environmental footprint. In developing the
  new model, the MINI brand’s responsible attitude was very much in the
  focus with regard to materials and production: chrome no longer
  features anywhere in the interior or exterior, and the light-metal
  alloy wheels are cast from up to 70 percent secondary aluminium. The
  permanently electrically excited synchronous motors are highly
  efficient and made entirely without rare earth minerals.</p>
<p>The interior is made purely from innovative, high-quality materials
  that are easy on the environment. The dashboard, door facias, floor
  covering and foot mats, for example, are made of recycled textiles. A
  high-quality alternative to conventional materials such as plastics,
  recycled textiles reduce CO<sub>2</sub> emissions along the value
  chain and require less water to manufacture.</p>
<p>
  <strong>Innovative painting method for contrast roof </strong></p>
<p>One of the striking design features of the MINI exterior is the
  contrast roof, which can be ordered in a different colour from the
  rest of the body. In the MINI Countryman it will be painted using a
  new, resource-friendly method known as overspray-free painting.
  Currently being readied for series operation, overspray-free painting
  does away with the excess paint – or overspray – generated by
  conventional painting methods and makes surfaces with more than one
  colour easier to produce, as they no longer require the laborious
  process of masking. Overspray-free painting also helps save
  CO<sub>2</sub> emissions, as exhaust air from the cabin requires less
  cleansing. Plus it requires considerably less conditioned air, i.e.
  air that is brought to a set temperature and humidity. As a result,
  less energy is needed to temper air and treat exhaust.</p>
<p>Another sustainable innovation operating at Plant Leipzig is the
  burner technology used to dry the paint on contrast roofs. Last year
  Leipzig became the first car plant in the world to pilot the new
  technology, which can run on not only natural gas but also hydrogen.
  The flexible burners can burn hydrogen (H2), natural gas (methane –
  CH4) or a mixture of the two and can even switch between them without
  having to halt operations. After successful tests, Plant Leipzig has
  now installed five hydrogen-capable bivalent burners for series
  operations, which are now being used for the contrast roof of the MINI
  Countryman. Plans are in place to convert further burners in the
  paintshop to bivalent operations.</p>
<p>
  <strong>Plant Leipzig – Built for sustainability</strong></p>
<p>At Plant Leipzig, the focus has always been very much on efficient
  processes and a long-term strategy for energy generation and
  consumption, ever since planning began. “Sustainability is in the DNA
  of BMW Group Plant Leipzig. There’s one example that everyone can see:
  our four wind turbines, which generate electricity for the plant,”
  Petra Peterhänsel explained. They were erected in 2013 and deliver 10
  MW (generating approx.  25 GWh/year). The second milestone came in
  2017, when the battery storage farm went on stream. Equipped with up
  to 700 second-life high-voltage batteries from BMW i3 vehicles, it
  offers interim electricity storage for energy from the wind turbines
  and elsewhere, helping to optimise local energy management and
  stabilise the grid.</p>
<p>“Our vision at Plant Leipzig is to decarbonise production as far as
  possible by replacing fossil fuels with green hydrogen,” said Petra
  Peterhänsel, explaining the long-term focus of the facility. This will
  require sufficient green hydrogen from a grid. A regional hydrogen
  grid is currently in planning, with Plant Leipzig set to benefit.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>MINI Countryman SE ALL4 (combined electricity consumption: 18.5 –
  17.0 kWh/100 km according to WLTP; combined CO<sub>2</sub> emissions:
  0 g/km).</p>
<p>MINI Countryman with combustion engine (combined fuel consumption
  according to WLTP: 8.3 – 4.8 l/100 km, combined CO<sub>2</sub>
  emissions: 188 – 125 g/km)</p>
<p>*All technical data is provisional.</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Sustainability,Production Plants,Leipzig,Countryman,Product,MINI]]></category>
            <pubDate>Fri, 10 Nov 2023 10:30:00 +0100</pubDate>
            <pp:lastModified>Fri, 10 Nov 2023 09:30:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/1484a879-c79b-4167-b7e3-f376ba916b82/500_P90531636_highRes_mini-countryman-prod.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/1484a879-c79b-4167-b7e3-f376ba916b82/500_P90531636_highRes_mini-countryman-prod.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/1484a879-c79b-4167-b7e3-f376ba916b82/P90531636_highRes_mini-countryman-prod.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90531636_highRes_mini-countryman-prod.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group to build logistics centre for high-voltage batteries in north of Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-to-build-logistics-centre-for-high-voltage-batteries-in-north-of-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-to-build-logistics-centre-for-high-voltage-batteries-in-north-of-leipzig/</guid><pp:caseid>768347</pp:caseid><pp:summary><![CDATA[+++ Ground-breaking ceremony +++ Construction work on eight hectares +++ First fossil fuel-free BMW facility on this scale +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The BMW Group continues to invest in
  e-component production at Plant Leipzig and in the future of the site.
  A leasehold contract has now been signed for an area of land outside
  the plant premises, on the northern industrial estate – which is also
  home to the existing facility. The new plot for use by BMW consists of
  12 hectares in total, eight of which will be built on in the first
  stage of construction. This will produce a logistics hall for the
  current fifth-generation high-voltage batteries and an office
  building, both of which are due to reach completion in mid-2024.</p>
<p>To mark the start of construction of the Supply Centre North, Petra
  Peterhänsel, Plant Director, Jens Köhler, Works Council Chairman,
  Frank Hager, Head of Production for High-Voltage Batteries, Clemens
  Schülke, Mayor and Alderman for Business, Labour and Digital in the
  City of Leipzig and Anja Hähle-Posselt, Director of the Office for
  Economic Development of the City of Leipzig, were joined by Karsten
  Dickerboom, representing the construction company Max Bögl Stiftung
  & Co KG, to perform the symbolic turning of the first sod.</p>
<p>
  <strong>Building the future</strong></p>
<p>“These days car production is just as much a part of Leipzig’s
  economic DNA as the trade fair. We’re delighted that an already strong
  cluster is now growing further. What’s more, the focus will be on an
  eco-friendly footprint throughout. With this extension, BMW is sending
  out a clear signal around Leipzig as a base and electromobility. We
  are happy to partner the company and support the positive development
  of these areas,” said Mayor Clemens Schülke.</p>
<p>Plant Director Petra Peterhänsel also sees the transition to
  electromobility as an important building block in the plant’s
  development: “Leipzig continues to power ahead. Making the BMW i3, we
  were the BMW Group’s pioneer in electromobility. Now, with the
  development of e-component production and the upcoming launch of the
  MINI Countryman, the future is already taking shape.”</p>
<p>
  <strong>Investment in the transition to electromobility</strong></p>
<p>In the first stage of construction, a warehouse, a two-storey office
  building and a loading tunnel with a combined gross area of 38,000
  m<sup>2</sup> will be erected. There are also plans for a second
  construction stage, which will take the total investment to as much as
  100 million euros. When all the construction work is complete, the new
  buildings at the Supply Centre North will provide workplaces for
  approx. 500 employees.</p>
<p>By 2026 the BMW Group aims for at least one in three new cars sold to
  be fully electric, so the need for high-voltage batteries will
  increase. Plant Leipzig is already a cornerstone in supplying
  e-components for the production network and provides one in three
  battery modules for the BMW Group’s fully electric vehicles. These
  include the BMW iX1, the BMW i5 and the BMW iX. With the new hall as a
  logistics centre for high-voltage batteries, Plant Leipzig is
  embracing this role even further, with a building that meets all the
  structural requirements for handling high-voltage components.</p>
<p>
  <strong>Beyond compliance: Stringent environmental standards </strong></p>
<p>Planning the logistics hall, the team applied stringent environmental
  standards that go above and beyond legal requirements. The buildings
  will be powered not by fossil fuels, for example. Photovoltaic systems
  on the roof of the hall will generate approx. 3,000 kW in peak
  operations. In addition the hall will be heated by a heat pump. The
  office building will have a green roof, and trees at strategic points
  along the façade will keep indoor temperatures cool when the weather
  outside is hot.</p>
<p>The outside space will be landscaped with over 5,700 new shrubs and
  trees. This will continue the City of Leipzig and the BMW Group’s
  efforts to add to the green ring around the plant on the Northern
  Industrial Estate. Outdoor areas will be illuminated by
  insect-friendly lights, and parking spaces will be equipped with
  electric charging points for cars and trucks so that electric heavy
  goods vehicles can operate between the plant and warehouse.</p>
<p>
  <strong>E-component production as the powerhouse for the future of Leipzig</strong></p>
<p>One of the drivers behind the extensive additions that are currently
  being made to Plant Leipzig – both on the premises and off – is
  e-component production. Measures will safeguard existing jobs and
  increase the number of new ones. At the moment more than 800 employees
  work in e-component production in Leipzig, rising to over 1,000 by
  2024. Further jobs will be created with service providers.</p>
<p>From next year BMW Plant Leipzig will run all three stages of the
  high-voltage battery production process: cell coating, module
  production and high-voltage battery assembly. E-component production
  capacity has been steadily increasing since 2021, and at present
  battery cells are coated and assembled into modules there. One in
  three battery modules for fully electric vehicles by the BMW Group
  already comes from Leipzig today, and a battery assembly system is
  currently under construction, expected to go on stream early next
  year. The BMW Group is investing up to 1 billion euros in extending
  e-component production at Leipzig.</p>
<p>With BMW i3 production now phased out, 2024 will see Plant Leipzig
  launch its next fully electric model: the new MINI Countryman. The
  crossover will come with a choice of combustion engines or a fully
  electric drive, the high-voltage batteries for the latter being made
  directly in Plant Leipzig’s workshops.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Sustainability,e-Mobility,Drive Technologies,Leipzig,Research &amp; Development,Innovation,Logistics,Battery Cells]]></category>
            <pubDate>Fri, 25 Aug 2023 10:30:00 +0200</pubDate>
            <pp:lastModified>Fri, 25 Aug 2023 08:30:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/f7a33bba-cdc9-42ca-9b38-f95dd40ed3e6/500_P90520095_highRes_marking-the-start-of.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/f7a33bba-cdc9-42ca-9b38-f95dd40ed3e6/500_P90520095_highRes_marking-the-start-of.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/f7a33bba-cdc9-42ca-9b38-f95dd40ed3e6/P90520095_highRes_marking-the-start-of.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90520095_highRes_marking-the-start-of.jpg]]></pp:imageTitle></item><item>
                        <title>Expansion of E-component production in Leipzig: First cell coating line for battery modules goes on stream</title>
                        <link>https://newsroom.bmwgroup.com/global/expansion-of-e-component-production-in-leipzig-first-cell-coating-line-for-battery-modules-goes-on-stream/</link>
                        <guid>https://newsroom.bmwgroup.com/global/expansion-of-e-component-production-in-leipzig-first-cell-coating-line-for-battery-modules-goes-on-stream/</guid><pp:caseid>767919</pp:caseid><pp:summary><![CDATA[+++ First of five cell coating lines is launched +++ Leipzig to run complete high-voltage battery production process by 2024 +++ In-house production of e-components for the fully electric MINI Countryman +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> BMW Group Plant Leipzig’s first cell coating
  line has gone into series operation as e-component production at the
  site continues to gain momentum. By 2024 the two existing module
  assembly lines will be complemented by a third, as well as four more
  cell coating lines and two more high-voltage battery assembly lines.
  The four coating lines will enter series operation during the course
  of this year at roughly two-month intervals.</p>
<p>“From 2024 our plant here in Leipzig will be able to run the entire
  process chain for high-voltage battery production,” said Markus
  Fallböhmer, head of Battery Production at the BMW Group. “So we will
  be making an important contribution to the transformation to
  electromobility.” To meet its goal of fully electric vehicles
  accounting for at least half of all sales by 2030, the BMW Group is
  investing more than €800 million to establish and develop e-component
  production at BMW Plant Leipzig.</p>
<p>
  <strong>More than 2,000 coated cells an hour</strong></p>
<p>Covering 2,300 m<sup>2</sup>, the new cell coating system at the BMW
  plant in Leipzig is located in the former production hall of the BMW
  i3, where production was phased out in the summer of last year.
  Straight afterwards the space was converted for e-component
  manufacturing in less than six months, and associates underwent the
  relevant training.</p>
<p>The new coating line can handle more than 10 million cells a year, or
  over 2,300 an hour. The coated cells are then used on the battery
  module production line in Leipzig, to make modules for the fully
  electric BMW i4* and BMW iX1*. A further line at the facility is
  producing battery modules for the BMW iX*.</p>
<p>
  <strong>From cell coating to high-voltage battery</strong></p>
<p>High-voltage battery production happens in three stages: cell
  coating, module production and assembly of the battery itself. The
  processes are highly automated.</p>
<p>The BMW Group sources its cells from partners who manufacture them
  exactly to specification. The type that is used depends on the vehicle
  concerned and is chosen to ensure the best possible characteristics.</p>
<p>Coating lithium-ion cells consists first of pre-treating and
  patterning their surfaces with a laser. This involves the laser beam
  “chiseling” a texture into the outside of the uncoated cell to
  increase both its surface area and the surface tension of the
  aluminium casing. Next, the cells are plasma-cleansed to remove any
  dirt particles and oxides. Together, these two processes improve the
  adhesiveness of the surface, ready for the coating to be applied. It
  is administered by a specially developed machine that coats the cells
  in two layers, which are then hardened by UV and offer the best
  possible insulation for the cells. Finally, a fully automated
  three-stage quality control process is carried out in which the
  thickness and surface quality of the coating are inspected. A
  high-voltage test is conducted to ensure the coating is completely
  free from defects.</p>
<p>The cell coating used at the BMW Group is blue, which was
  deliberately chosen for its important role in the positioning of
  electric BMW i vehicles and as the signal colour of the range. Within
  the BMW Group production network, Plant Leipzig is a pioneer in
  electromobility, having produced the company’s first fully electric
  model, the BMW i3, from 2013 to 2022.</p>
<p>Once coated, the battery cells are assembled into larger units known
  as modules. When completed, these are fitted into a aluminium housing
  along with the control and cooling units and the connectors that will
  connect them to the vehicle. The size and shape of the housing and the
  number of modules inside depends on the vehicle variant. That way,
  each car receives the most suitable high-voltage battery.</p>
<p>
  <strong>A secure future for BMW Group Plant Leipzig</strong></p>
<p>The continued expansion of Plant Leipzig is very much driven by
  e-component production, which will take up some 150,000 m<sup>2</sup>
  of manufacturing space in the future. “This is a long-term investment
  in the future of the Leipzig plant,” emphasised Plant Director Petra
  Peterhänsel, adding that the expansion of the plant would not only
  safeguard current jobs but also create new ones. “At present, more
  than 800 employees work in e-component production at our Leipzig site.
  By 2024 there will be more than 1,000.”</p>
<p>The next great milestone for Plant Leipzig will be production of the
  MINI Countryman successor, which will roll off the production lines
  from the end of this year. The crossover will be available with a
  choice of combustion engines or a fully electric drive – powered by
  high-voltage batteries made in Leipzig.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>
  <strong>*Electricity consumption and range: </strong></p>
<p>BMW iX: Electricity consumption in kWh/100 km: 24.7-19.4 (WLTP);
  electric range (WLTP) in km: 408-630</p>
<p>BMW i4: Electricity consumption in kWh/100 km: 22.5-15.8 (WLTP);
  electric range (WLTP) in km: 406-589</p>
<p>BMW iX1: Electricity consumption in kWh/100 km: 18.1-16.8 (WLTP);
  electric range (WLTP) in km: 417-440</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Technology,Sustainability,Drive Technologies,Production Plants,Leipzig,Research &amp; Development,Battery Cells]]></category>
            <pubDate>Wed, 01 Feb 2023 08:00:00 +0100</pubDate>
            <pp:lastModified>Wed, 01 Feb 2023 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/97619c32-9c82-4225-bec9-fed5626cd8ef/500_P90493607_highRes_battery-cell-coating.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/97619c32-9c82-4225-bec9-fed5626cd8ef/500_P90493607_highRes_battery-cell-coating.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/97619c32-9c82-4225-bec9-fed5626cd8ef/P90493607_highRes_battery-cell-coating.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90493607_highRes_battery-cell-coating.jpg]]></pp:imageTitle></item><item>
                        <title>“We are working consistently to advance the transformation”: BMW Group to establish eight new e-component production lines in Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/global/we-are-working-consistently-to-advance-the-transformation-bmw-group-to-establish-eight-new-e-component-production-lines-in-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/global/we-are-working-consistently-to-advance-the-transformation-bmw-group-to-establish-eight-new-e-component-production-lines-in-leipzig/</guid><pp:caseid>767815</pp:caseid><pp:summary><![CDATA[+++ Complete process chain for high-voltage battery production in Leipzig +++ Five cell coating lines, an additional module line and two high-voltage battery lines by 2024 +++ Production of e-components for forthcoming fully electric MINI Countryman made in Leipzig +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p> </p>
<p>+++ Complete process chain for high-voltage battery production in
  Leipzig +++ Five cell coating lines, an additional module line and two
  high-voltage battery lines by 2024 +++ Production of e-components for
  forthcoming fully electric MINI Countryman made in Leipzig +++</p>
<p>
  <strong> </strong></p>
<p>
  <strong>Leipzig.</strong> The BMW Group is to increase e-component
  production capacity at its manufacturing base in Leipzig with another
  eight production lines by 2024. The announcement was made on 20
  October at the Green Day in BMW Group Plant Leipzig. Over the next
  year, the plant’s two existing battery module lines will be
  complemented by a further line plus five cell coating lines. These
  will be followed by two new high-voltage battery assembly lines due to
  go on stream in 2024. The batteries they make will power models such
  as the fully electric version of the MINI Countryman, which will also
  be built in Leipzig.</p>
<p> </p>
<p>“The BMW Group has always been a pioneer in the transformation to
  electric mobility,” said Milan Nedeljković, BMW AG Board Member for
  Production, “and we intend to remain the leader in the future. Plant
  Leipzig will be of special importance in this regard, as it’s the
  birthplace of the BMW i3.” From 2013 to the summer of 2022, Leipzig
  manufactured more than 250,000 fully electric BMW i3 vehicles and over
  20,000 plug-in hybrid BMW i8 sports cars. The freed-up spaces and the
  skills of its employees will now be used to produce e-components. More
  than 700 production staff are already working in battery component
  production at Plant Leipzig, rising to more than 1,000 by 2024.</p>
<p> </p>
<p>“We are working consistently to advance the transformation to
  electromobility,” said Markus Fallböhmer, Head of Engine and E-Drive
  Production at BMW AG, “and we continue to develop our e-drive
  production network to make it happen. From 2024, the entire process
  chain for high-voltage battery production will run not just at
  Dingolfing but at Leipzig as well.”</p>
<p> </p>
<p>
  <strong>Over 800 million euros invested in e-components at Leipzig</strong></p>
<p>Between 2020 and the end of 2024, the BMW Group will have invested
  more than 800 million euros in establishing e-component production in
  Leipzig. In the future, this area of production will take up around
  150,000 m<sup>2</sup> on the site.</p>
<p> </p>
<p>
  <strong>Investments in e-drive production in Dingolfing and Regensburg </strong></p>
<p>By the end of 2022, the BMW Group will have invested more than 1
  billion euros in the Dingolfing Competence Centre for E-Drive
  Production – which also produces electric motors. In Regensburg,
  investments in e-drive component production have totalled more than
  250 million euros between 2020 and late 2022.</p>
<p> </p>
<p>
  <strong>Five new cell coating lines from 2023</strong></p>
<p>In the first quarter of 2023, the first of five new battery cell
  coating systems will go on stream at the Leipzig site, followed by
  another four systems which will launch in stages until the end of the
  same year.</p>
<p> </p>
<p>The battery cells they will process will be manufactured by external
  suppliers working to BMW Group specifications. First of all, the
  lithium-ion cells will be plasma-cleansed before being coated by the
  specially developed systems to ensure optimum insulation.</p>
<p> </p>
<p>
  <strong>Third battery module line to launch in summer 2023</strong></p>
<p>After being coated, the cells are assembled to form larger units
  known as battery modules. In Leipzig this is currently being done on
  two existing module lines. A third is set to go on stream in the
  summer of 2023.</p>
<p> </p>
<p>
  <strong>Two high-voltage battery assembly lines from 2024</strong></p>
<p>Once complete, the battery modules, connectors, control units and
  cooling aggregates are fitted into an aluminium casing. The number of
  modules and the size and shape of the casing depend on which vehicle
  variant they will be used in, so that each vehicle is fitted with the
  most suitable high-voltage battery.</p>
<p> </p>
<p>In the future, Plant Leipzig will also assemble high-voltage
  batteries when two designated assembly lines go on stream in 2024.</p>
<p> </p>
<p>
  <strong>Global production network for e-drives focused in Germany</strong></p>
<p>The BMW Group is drawing on its global production network to meet the
  increasing need for e-drive component production capacity.
  High-voltage batteries and battery components for electric vehicles by
  the BMW and MINI brands will not only be made in Leipzig but also in
  Spartanburg, USA, and Shenyang, China. At Plant Rayong, Thailand,
  high-voltage battery production has been localised with the support of
  a BMW Group partner.</p>
<p> </p>
<p>Meanwhile, Munich is home to the E-Drive Pilot Plant and the Battery
  Cell Competence Centre, which performs detailed analyses of the value
  creation processes in battery cell production and advances the
  relevant technologies. In the not-too-distant future the BMW Group
  will also be launching its Competence Centre for Battery Cell
  Production in Parsdorf, just outside Munich. Here, a pilot production
  system for the near-series manufacture of lithium-ion battery cells
  will ensure they can be mass-produced to quality, time and cost specifications.</p>
<p> </p>
<p>The BMW Group manufactures its electric motors in the Competence
  Centre for E-Drive Production in Dingolfing and at BMW Group Plant
  Landshut. Casings for the highly integrated fifth-generation electric
  drive are produced in BMW Group Plant Steyr.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Christian Marxt<br>Tel: +49-89-382-79158<br>E-mail: <a href="mailto:christian.marxt@bmw.de">christian.marxt@bmw.de</a></div></div></div>]]></description><category><![CDATA[Locations,Drive Technologies,Production Plants,Leipzig,Research &amp; Development,Production]]></category>
            <pubDate>Thu, 20 Oct 2022 13:01:00 +0200</pubDate>
            <pp:lastModified>Thu, 20 Oct 2022 11:01:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/abcfd336-78d1-4fb4-96ba-7c6649d4e60e/500_P90483956_highRes_bmw-group-plant-leip.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/abcfd336-78d1-4fb4-96ba-7c6649d4e60e/500_P90483956_highRes_bmw-group-plant-leip.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/abcfd336-78d1-4fb4-96ba-7c6649d4e60e/P90483956_highRes_bmw-group-plant-leip.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90483956_highRes_bmw-group-plant-leip.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Plant Leipzig pilots flexible hydrogen-capable burners in paintshop</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzig-pilots-flexible-hydrogen-capable-burners-in-paintshop/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzig-pilots-flexible-hydrogen-capable-burners-in-paintshop/</guid><pp:caseid>767848</pp:caseid><pp:summary><![CDATA[+++ Nedeljković, Board Member for Production: “Technological breakthrough underscores our innovativeness” +++ Hydrogen power also in plant and transport logistics +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p> </p>
<p>+++ Nedeljković, Board Member for Production: “Technological
  breakthrough underscores our innovativeness” +++ Hydrogen power also
  in plant and transport logistics +++</p>
<p>
  <strong> </strong></p>
<p>
  <strong>Leipzig.</strong> BMW Group Plant Leipzig is the first car
  plant in the world to pilot a newly developed burner technology that
  allows to run on green hydrogen as well as natural gas. The new
  technology meets the feasibility requirements to reduce CO<sub>2</sub>
  emissions from the intensive use of natural gas, a fossil fuel. BMW AG
  Board Member Milan Nedeljković: “This is a technological breakthrough.
  It underscores our innovativeness and our determination to make
  production ever more sustainable.”</p>
<p> </p>
<p>Today BMW Group Plant Leipzig launched the first fuel-flexible
  hydrogen-capable burner for paint dryers. The special feature of the
  system is that it can run on hydrogen (H<sub>2</sub>), methane
  (CH<sub>4</sub>) or a mixture of the two. It can also switch between
  fuels while in operation. Initially, it will run in trial operations.
  The innovative fuel-flexible burner system was developed in
  collaboration with the Bremen-based company Saacke, and with the
  Fraunhofer Institute IFF in Magdeburg supporting the integration of
  the safety concept.</p>
<p> </p>
<p>
  <strong>Sustainability as a key element in the BMW iFACTORY</strong></p>
<p>Reducing CO<sub>2</sub> emissions is one of the central aims of the
  BMW iFACTORY with its LEAN. GREEN. DIGITAL approach. While
  sustainability, optimum use of resources and circularity are the focus
  of GREEN, the LEAN strand of the strategy works for efficient, precise
  and highly flexible production. DIGITAL makes effective use of
  digitalisation in data science, artificial intelligence and virtualisation.</p>
<p> </p>
<p>To become even more sustainable, the BMW Group is devising
  site-specific solutions to reduce CO<sub>2</sub> emissions – including
  geothermal, photovoltaics, and hydrogen. The various solutions will be
  deployed in whatever way best suits the site in question.</p>
<p> </p>
<p>To run hydrogen throughout, a pipeline will be needed to ensure
  sufficient quantities of green hydrogen are available at all times.
  The Leipzig plant has the opportunity to use a hydrogen network
  created in the region for this purpose.</p>
<p>
  <strong> </strong></p>
<p>
  <strong>Hydrogen power in plant and transport logistics</strong></p>
<p>Hydrogen has long been a staple fuel in plant logistics. The first
  indoor hydrogen filling station in Germany was installed on the plant
  premises in 2013, to fuel forklifts and tug trains in intralogistics.
  Today, almost ten years later, Plant Leipzig has the largest fleet in
  Germany with over 130 fuel-cell powered forklifts. There are also five
  intralogistics hydrogen stations on the premises. The latest offers
  fully automated refuelling.</p>
<p> </p>
<p>The BMW Group is also working with its partners to trial
  hydrogen-powered solutions to support the decarbonisation of transport
  logistics beyond the factory gates as well and is currently involved
  in the H2HAUL and HyCET research projects. Hydrogen is a promising
  fuel for transport logistics because it allows fast refuelling, high
  payloads and flexible usability. It also offers extensive range. And
  green hydrogen – produced with energy from renewable sources – will
  pave the way for lower-carbon, long-distance logistics in the future.</p>
<p> </p>
<p>The <strong>H2HAUL</strong> project in Belgium, Germany, France and
  Switzerland is working to develop and pilot 16 hydrogen fuel
  cell-powered trucks and install new, high-capacity filling stations
  for reliable fuel supplies. Launched in 2019, H2HAUL will run for five
  years, with Germany contributing by trialling two fuel-cell trucks for
  transportation between Plant Leipzig and Nuremberg.</p>
<p> </p>
<p>On the <strong>HyCET</strong> project, the BMW Group is leading a
  consortium to advance the development and testing of trucks with
  hydrogen combustion engines in transport logistics. With project
  funding of 11.3 million euros approved by the Federal Ministry for
  Digital and Transport in September of this year, HyCET aims to
  demonstrate the potential of hydrogen combustion-engine trucks in
  transport logistics and establish two hydrogen filling stations for
  public use.</p>
<p>
  <strong> </strong></p>
<p>
  <strong>Plant Leipzig – Geared for sustainability from the outset</strong></p>
<p>“Sustainability is in Plant Leipzig’s DNA, as it were,” said Plant
  Director Petra Peterhänsel. “Efficient and sustainable processes were
  already very important to us when we were planning the facility, and
  one highly visible result of that is the four wind turbines that
  supply electricity to the plant.” Erected in 2013, they deliver 10 MW
  of power (generating approx. 26 GWh/year). In 2017 a further milestone
  followed when the Battery Farm comprising up to 700 second-life
  high-voltage batteries from BMW i3 vehicles was opened. The batteries
  are used to store energy, such as that generated by the wind turbines.
  By storing the energy on the premises, local energy management can be
  optimised and the electrical grid kept stable.</p>
<p> </p>
<p> </p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Martina Hatzel<br>Tel: +49-89-382-11966<br>E-mail: <a href="mailto:martina.hatzel@bmwgroup.com">martina.hatzel@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Sustainability,Production Plants,Leipzig,Research &amp; Development,Production,Logistics]]></category>
            <pubDate>Thu, 20 Oct 2022 13:00:00 +0200</pubDate>
            <pp:lastModified>Thu, 20 Oct 2022 11:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/7d16646a-64f9-43ff-a529-1414bc5ca20c/500_P90483954_highRes_bmw-group-green-day-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/7d16646a-64f9-43ff-a529-1414bc5ca20c/500_P90483954_highRes_bmw-group-green-day-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/7d16646a-64f9-43ff-a529-1414bc5ca20c/P90483954_highRes_bmw-group-green-day-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90483954_highRes_bmw-group-green-day-.jpg]]></pp:imageTitle></item><item>
                        <title>E-drive production expands in Leipzig: Second battery module line goes on stream</title>
                        <link>https://newsroom.bmwgroup.com/global/e-drive-production-expands-in-leipzig-second-battery-module-line-goes-on-stream/</link>
                        <guid>https://newsroom.bmwgroup.com/global/e-drive-production-expands-in-leipzig-second-battery-module-line-goes-on-stream/</guid><pp:caseid>767887</pp:caseid><pp:summary><![CDATA[+++ E-component production expands +++ Manufacture of battery modules for BMW i4 +++ €70 million invested +++ 250 new jobs created +++ Plant Director Petra Peterhänsel: “Plant Leipzig remains electrified” +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Today sees the launch of BMW Group Plant
  Leipzig’s second battery module production line. Further expanding
  e-component production in the German state of Saxony, the new system
  manufactures modules for the fully electric BMW i4*, made in Munich.
  Plant Leipzig’s first such production line went on stream in May 2021
  and supplies the battery modules for the BMW iX*.</p>
<p>“Today’s launch of Leipzig’s second battery module production line
  makes an important contribution to delivering the battery components
  needed to make a growing number of electrified vehicles,” said Markus
  Fallböhmer, Head of Engine and E-Drive Production at the BMW Group.
  The gradual expansion of e-component production is taking the BMW
  Group ever closer to its goal for 2030, when fully electric models are
  expected to account for at least half of the BMW Group’s sales.</p>
<p>
  <strong>Ensuring the future viability of Plant Leipzig</strong></p>
<p>The new battery module production line alone comes at an investment
  of around €70 million. As the expansion of e-component production
  continues, new jobs are being created as well, with some 250 people
  working on the new line by the end of 2022, in addition to the current
  700-plus already in e-component production in Leipzig.</p>
<p>Plant Leipzig’s second battery module production system occupies an
  area of approx. 4,250 m² and uses BMW i production areas that are now
  vacant after the BMW i3 was phased out on 30 June. Each battery module
  passes through 196 production stations in total before it is complete
  and ready for further processing.</p>
<p> “Plant Leipzig remains electrified,” said a delighted Petra
  Peterhänsel, Plant Director. “Now that BMW i3 production has wound
  down, we can use the skills and experience of our employees elsewhere
  and offer them secure jobs for the long term,” she commented, adding
  that this would continue to ensure the future viability of the plant.</p>
<p>To prepare for the steady increase in electrified vehicles,, e-drive
  production in Leipzig will become even more extensive and flexible as
  early as next year, with upcoming stages of the expansion programme
  creating further new jobs. Another major milestone will be production
  of the successor to the MINI Countryman, due to roll off the
  production lines from 2023. The crossover model will be available with
  combustion engines as well as an all-electric drive.</p>
<p>
  <strong>From battery cell to high-voltage battery</strong></p>
<p>Production of high-voltage batteries can be broken down into two
  stages: module production and high-voltage battery assembly.</p>
<p>Module production is a highly automated process in which the
  lithium-ion cells first undergo plasma cleaning, before being coated
  by a specially developed system to ensure optimal insulation. They are
  then combined to form larger units known as modules. The BMW Group
  sources its battery cells from partners who produce them to the
  company’s exact specifications.</p>
<p>The completed battery modules are then installed in an aluminium
  housing, together with the connectors and the control and cooling
  units. The size and shape of the housing and the number of battery
  modules used differ depending on the vehicle variant. So, each
  high-voltage battery can be optimally adjusted to suit the car it will power.</p>
<p>
  <strong>Global production network for e-drives focused in Germany</strong></p>
<p>To meet rising demand for e-drive component production capacity, the
  BMW Group draws on a worldwide production network. The high-voltage
  batteries and battery components for the full range of electrified BMW
  and MINI vehicles are made at the company’s own battery facilities, in
  Dingolfing, Leipzig and Regensburg in Germany, as well as Spartanburg
  (USA) and Shenyang (China). There is also localised production of
  high-voltage batteries in Thailand, for the plant in Rayong. In
  Munich, the BMW Group operates an e-drive pilot plant and a Battery
  Cell Competence Centre, where battery cell value creation processes
  are analysed in full and technologies for production processes are
  refined. Just outside Munich, the BMW Group is soon to open a Cell
  Manufacturing Competence Centre.</p>
<p>Located in Parsdorf, just to the east of the city, the new facility
  will be a pilot plant for battery cell production. It will model
  series production of lithium-ion battery cells and validate the
  feasibility of their large-scale manufacture, especially with regard
  to quality, time and costs.</p>
<p>In Dingolfing and at BMW Group Plant Landshut, the BMW Group
  manufactures electric motors in the Competence Centre for E-Drive
  Production. The casing for the highly integrated fifth-generation
  e-drive is made at BMW Group Plant Steyr.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>
  <strong>*</strong>
  <strong>Consumption and range: </strong></p>
<p>BMW i4: Power consumption in kWh/100 km: 22,5-16,1 (WLTP, combined);
  Electric range (WLTP) in km: 416-590</p>
<p>BMW iX: Power consumption in kWh/100 km: 24,5-19,5 (WLTP, combined);
  Electric range (WLTP) in km: 394-607</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Sustainability,Drive Technologies,Production Plants,Leipzig,Research &amp; Development,Innovation,Production,Battery Cells]]></category>
            <pubDate>Mon, 01 Aug 2022 08:00:00 +0200</pubDate>
            <pp:lastModified>Mon, 01 Aug 2022 06:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/24043f28-51b7-4d27-8f7f-f3ecab125c54/500_P90473545_highRes_production-of-batter.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/24043f28-51b7-4d27-8f7f-f3ecab125c54/500_P90473545_highRes_production-of-batter.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/24043f28-51b7-4d27-8f7f-f3ecab125c54/P90473545_highRes_production-of-batter.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90473545_highRes_production-of-batter.jpg]]></pp:imageTitle></item><item>
                        <title>The electric pioneer on the home stretch: Production of the BMW i3 comes to a close with an anniversary and the exclusive HomeRun Edition.</title>
                        <link>https://newsroom.bmwgroup.com/global/the-electric-pioneer-on-the-home-stretch-production-of-the-bmw-i3-comes-to-a-close-with-an-anniversary-and-the-exclusive-homerun-edition/</link>
                        <guid>https://newsroom.bmwgroup.com/global/the-electric-pioneer-on-the-home-stretch-production-of-the-bmw-i3-comes-to-a-close-with-an-anniversary-and-the-exclusive-homerun-edition/</guid><pp:caseid>768013</pp:caseid><pp:summary><![CDATA[+++ 250,000 units of the brand's first fully electric large-series production model have been manufactured to date +++ BMW i3 as a pioneer for locally emission-free driving pleasure and holistic sustainability +++ Seamless transition: BMW Group Plant Leipzig uses expertise of its workforce for expanding the production of e-drive components +++ From 2023, the first location in the world where both BMW and MINI models will be built +++ Future MINI Countryman with fully electric drive continues the tradition of sustainable mobility made in Leipzig +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> An era is coming to an end at the BMW Group
  plant in Leipzig. The serial production of the BMW i3 is now to come
  to an end, some eight and a half years after it was launched. A source
  of inspiration, a driver of innovation, a pioneer of locally
  emission-free driving pleasure: The list of attributes that have
  accompanied the BMW Group's first large-series production automobile
  with fully electric drive since its debut in 2013 is long. The BMW i3
  (combined power consumption: 16.3 - 15.3 kWh/100 km according to WLTP,
  13.1 - 14.0 kWh/100 km according to NEDC, CO<sub>2</sub> emissions: 0
  g/ km) started out as an exotic specimen on the still barely tapped
  market for electric vehicles, developed into a classic with
  unmistakable charisma already in the course of its production period
  and goes down in the company's history as a pioneer of sustainable mobility.</p>
<p>For the BMW Group Plant Leipzig, the farewell to the BMW i3 is linked
  to the start of a new chapter in electric mobility. In a seamless
  transition, further e-drive components will be manufactured there with
  immediate effect in addition to producing high-voltage battery
  modules, which is already being done since May 2021. And already next
  year, the next generation of the MINI Countryman will be manufactured
  at the same location - with a fully electric drive, among other
  things. In this way, the electric mobility expertise of the workforce,
  which has been built up over the past years, will be used and advanced
  further. At the same time, the BMW Group Plant Leipzig becomes the
  first location in the company's global production network where BMW
  and MINI models are manufactured together.</p>
<p>
  <strong>The final anniversary: 250</strong>
  <strong>,</strong>
  <strong>000 units of electric driving pleasure made in Leipzig.</strong></p>
<p>The BMW i3 ends its production run with an impressive homerun. Just a
  few days ago, the 250,000 unit of the compact e-vehicle was produced
  in Leipzig. This makes the BMW i3 the world's most successful electric
  vehicle in the premium compact segment. And contrary to what might be
  expected for a model that is being phased out, its popularity did not
  wane as it matured.</p>
<p>The BMW i3 has been sold in more than 74 countries around the world.
  In many markets, it achieved a significantly higher market share in
  the electric vehicle segment than the BMW brand in the area of
  conventionally powered cars. It also succeeded in inspiring additional
  target groups in the premium mobility offers from BMW. In the early
  years, more than 80 per cent of all BMW i3 buyers were new customers
  for the BMW Group.</p>
<p>The enduring appeal of the BMW i3, which is manufactured exclusively
  at the Leipzig site for the entire global market, is also due to its
  especially individualistic character. Its independent vehicle
  architecture consists of a drive module as an aluminium chassis, which
  carries the e-drive, the suspension and the high-voltage battery as
  well as a passenger cell made of carbon fibre-reinforced plastic
  (CFRP) called the life module. This design, developed from the outset
  for pure e-mobility, made possible a particularly generous amount of
  space in the interior and a cockpit and centre console design which is
  both high-quality and very advanced. The same applies to the exterior
  design, which is still groundbreaking in its ninth year of production,
  and which is dedicated less to fashion or status than to technological avant-gardism.</p>
<p>
  <strong>Visionary technology standard-bearer with great symbolic power.</strong></p>
<p>These characteristics have not only made the BMW i3 into a
  trailblazer for the transformation to CO<sub>2</sub>-free mobility,
  but are also proof of how innovative the BMW Group is in a wide range
  of areas. "The BMW i3 has great symbolic power," says Oliver
  Zipse, Chairman of the Board of Management of BMW AG. He describes the
  development of the BMW i3 as a prime example of the "BMW
  way". This is characterised in particular by the courage to
  "pioneer topics, to do something different and not just follow
  the mainstream". This mindset continues to endure, according to
  Zipse, because "even the BMW iX, which is quite surprising in its
  capabilities, has its origins in this corporate culture".</p>
<p>The employees involved in manufacturing the BMW i3 at the BMW Group
  Plant Leipzig know all too well what this culture means in practice.
  After all, the BMW i3 was a visionary technology standard-bearer from
  day one, and not just because of its electric drive. With its
  Life-Drive architecture, it also set new standards in the field of
  intelligent lightweight construction. In Leipzig, innovative processes
  unique in the automotive industry have been established for moulding
  large-format car body parts from the particularly lightweight
  high-tech material CFRP. Today, the BMW Group has unique expertise in
  the industrial use of carbon fibre in body construction and aluminium
  in designing chassis components.</p>
<p>"The BMW i3 is a true pioneer and the epitome of pioneering
  spirit," says Milan Nedeljković, Member of the Board of
  Management for Production at BMW AG. "Thanks to the BMW i3, the
  Leipzig plant became the birthplace of e-mobility at BMW." With
  the expansion of the production of e-drive components, the Leipzig
  plant will remain "electric" in the future, says
  Nedeljković. "It will become the hub for electric mobility and
  supply our production network worldwide with components."</p>
<p>
  <strong>Innovation driver for e-mobility and multiple award winner.</strong></p>
<p>Thanks to its model-specific technology developments, the BMW i3 has
  also become an innovation driver for the BMW and MINI brands in
  numerous other areas. The 135 kW/184 hp electric motor of the BMW i3s
  (power consumption combined: 16.6 - 16.3 kWh/100 km according to WLTP,
  14.6 - 14.0 kWh/100 km according to NEDC, CO<sub>2</sub> emissions: 0
  g/km) has been delivering urban driving fun and locally emission-free
  go-kart feeling in MINI style since 2020. The purely electric MINI
  Cooper SE (power consumption combined: 17.6 - 15.2 kWh/100 km
  according to WLTP, 16.9 - 14.9 kWh/100 km according to NEDC,
  CO<sub>2</sub> emissions: 0 g/km) has since become the most popular
  model variant of the British brand.</p>
<p>Originally developed for the BMW i3, the fifth generation of BMW
  eDrive technology is now being produced. It is used in numerous purely
  electric and plug-in hybrid models from BMW and MINI. The ramp-up of
  electric mobility will continue in the coming years. By 2030, every
  second BMW Group vehicle sold worldwide is to be fully electric.</p>
<p>The BMW i3 has received numerous awards during its production period.
  In Germany, it was awarded the "Green Steering Wheel” already in
  2013, followed three years later by the "Golden Steering
  Wheel", also awarded by "Auto Bild" and "Bild am
  Sonntag". The design, vehicle concept, interior, sustainability,
  value retention and connectivity technology of the BMW i3 received
  further national and international awards and public survey successes.
  These include class victories in the competitions of the magazines
  "Auto Zeitung" and "auto, motor und sport", awards
  as "UK Car of the Year", "Green Car of the Year",
  "Classic of the Future" and "Swiss Car of the
  Year" as well as the "World Car Design Award", the
  "iF gold product design award" and the French "Trophée
  de l'argus".</p>
<p>
  <strong>Rethinking mobility: The holistic approach of the BMW i brand.</strong></p>
<p>In addition to the all-electric drive, the BMW i3's outstanding
  eco-balance also stems from the choice of materials, which is fully
  geared towards sustainability and resource-conserving production. It
  was the first BMW Group model to receive an ISO certificate issued by
  independent auditors at the time of its market launch, confirming its
  optimised environmental performance throughout its entire life cycle.</p>
<p>Partly recycled raw materials are used for its outer skin made of
  thermoplastics. The plastic used in the interior is made op of 25
  percent recycled material. The textiles used for the seat surfaces are
  made entirely from recycled fibres. The door panels of the BMW i3 are
  made of kenaf fibres. Eucalyptus wood from certified cultivation in
  Europe serves as the raw material for parts of the instrument panel.</p>
<p>The holistic concept for sustainability also includes the extensive
  use of renewable energy in the production of the BMW i3. Four wind
  turbines on the site of the BMW Group plant in Leipzig supply the
  electricity needed for its production. At an early stage, they made
  the Saxon location a pioneer for CO<sub>2</sub>-neutral vehicle
  production, which has been standard in all BMW Group plants around the
  world since last year.</p>
<p>In addition, the BMW i brand has provided impetus for sustainable
  driving pleasure and a comprehensive transformation to CO2-neutral
  mobility in many ways and far beyond the development of electrically
  powered vehicles. These activities include the urban car-sharing
  service DriveNow (called SHARE NOW today) which for many users is the
  ideal opportunity to come into contact with electric mobility for the
  first time, as well as the services now known as BMW Charging and MINI
  Charging for convenient charging at home and for easily accessing
  public charging stations, and the BMW Group's participation in the
  European fast-charging network Ionity.</p>
<p>
  <strong>The perfect introduction to the world of e-mobility - and a
    reliable endurance runner.</strong></p>
<p>For many customers, the BMW i3 became a constant companion early on
  in urban settings, for the daily commute and often far beyond. The
  frequent drivers among the "early adopters" above all praise
  the low energy and maintenance costs, but also how reliable the
  vehicle is and the cycle stability of its high-voltage battery. They
  report on brake pads that have not had to be replaced even after more
  than 250,000 kilometres, because a large part of the deceleration
  power is provided by recuperation when driving the BMW i3, and of the
  impressive long-term quality of the high-voltage battery, which leads
  to only a negligible reduction in range even after similarly long
  running times. The BMW Group took this positive experience as an
  opportunity to increase the maximum mileage associated with the
  eight-year warranty period for the battery from 100,000 to 160,000
  kilometres at the beginning of 2020.</p>
<p>The BMW i3's high-voltage battery has undergone continuous
  development since its market launch, doubling its storage capacity
  while retaining the same installation space. With a cell capacity of
  120 ampere hours (Ah) and a gross energy content of 42.2 kilowatt
  hours (kWh), it now enables ranges of up to 307 kilometres (BMW i3)
  according to WLTP.</p>
<p>The high-voltage batteries developed and produced by the BMW Group
  are used in other areas as well. Examples of this are the
  Streetscooter vans used by the German postal service and the city
  buses of the Turkish manufacturer Karsan, as well as motorboats with
  electric drives of the Torqeedo brand, for which they also serve as a
  source of energy. In addition, BMW i high-voltage batteries are used
  as stationary energy storage systems for electricity generated from
  renewable sources such as wind or solar power. The BMW Group plant in
  Leipzig also has such an energy storage farm. It consists of 700
  interconnected BMW i3 high-voltage batteries in which the electricity
  generated by the four wind turbines on the plant site can be stored.</p>
<p>
  <strong>Locally emission-free, elegant and exclusive: The HomeRun
    Edition of the BMW i3s.</strong></p>
<p>On its home stretch, the BMW i3 once again showcases the elegant and
  extravagant side of its character that has already been the subject of
  several limited special models. The BMW i3s HomeRun Edition, was
  treated to a Frozen paint finish from BMW Individual for the first
  time. This premiere is associated with a maximum of exclusivity: Only
  ten units of the BMW i3s HomeRun Edition have been produced.</p>
<p>An an exclusive for the BMW i3s HomeRun Edition, two new BMW
  Individual paint finishes have been added to the range: Frozen Dark
  Grey and Frozen Dark Red II. In addition the HomeRun Edition includes
  20-inch light-alloy wheels in a double-spoke design, an electrically
  operated glass roof, solar control glazing and Adaptive LED
  headlights. The special models also come with the particularly
  high-quality Suite interior design, which includes Vernasca Dark
  Truffle leather upholstery, a leather instrument panel, a leather
  steering wheel with galvanised trim, a Carum Grey roof lining, Ambient
  lighting and the welcome light. Other options include heated seats,
  comfort access, alarm system, Real Time Traffic Information, Concierge
  Service, Park Distance Control and rear view camera. Also included are
  the Comfort package and Driving Assistant Plus, the Professional
  navigation system, telephony with wireless charging, the Harman Kardon
  hi-fi speaker system and online entertainment with music flat rate.</p>
<p>The production of the ten special models was a final highlight not
  only for the employees involved in its production at the BMW Group
  Plant Leipzig. Customers of the special models were able to witness
  the completion of the vehicles in the assembly hall for themselves.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>The BMW i3 (combined power consumption: 16.3 - 15.3 kWh/100 km
  according to WLTP, 13.1 - 14.0 kWh/100 km according to NEDC,
  CO<sub>2</sub> emissions: 0 g/ km)</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Sustainability,Drive Technologies,Production Plants,Leipzig,Research &amp; Development,Production,i3,Product,BMW]]></category>
            <pubDate>Thu, 30 Jun 2022 15:00:00 +0200</pubDate>
            <pp:lastModified>Thu, 30 Jun 2022 13:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/d2eda6e4-0e16-417d-88f7-e595c481654e/500_P90471117_highRes_the-250-000th-bmw-i3.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/d2eda6e4-0e16-417d-88f7-e595c481654e/500_P90471117_highRes_the-250-000th-bmw-i3.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/d2eda6e4-0e16-417d-88f7-e595c481654e/P90471117_highRes_the-250-000th-bmw-i3.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90471117_highRes_the-250-000th-bmw-i3.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Plant Leipzig launches series production of second-generation BMW 2 Series Active Tourer</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzig-launches-series-production-of-second-generation-bmw-2-series-active-tourer/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-plant-leipzig-launches-series-production-of-second-generation-bmw-2-series-active-tourer/</guid><pp:caseid>767334</pp:caseid><pp:summary><![CDATA[+++ Seamless integration into the production process +++ BMW Group draws on front-wheel-drive expertise of Plant Leipzig +++ Dynamic styling, re-designed interior, state-of-the-art connectivity +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> BMW Group Plant Leipzig is launching series
  production of the second generation of the BMW 2 Series Active Tourer.
  Having first reached dealerships almost seven years ago, in the autumn
  of 2014, the BMW 2 Series Active Tourer was quick to establish itself
  in the market. More than 400,000 customers have since opted to buy the
  premium compact, which combines functional spaciousness with a dynamic
  drive concept. More than 368,000 of the vehicles concerned were
  manufactured in Leipzig. The successor of the sporty all-rounder will
  be made in Leipzig only.</p>
<p>“After the successful debut of the first-generation BMW 2 Series
  Active Tourer, BMW Group Plant Leipzig is proud to produce its
  completely redesigned successor,” emphasised Plant Director Hans-Peter
  Kemser. “This vehicle is another opportunity for us to prove our
  wealth of experience and expertise in the manufacture of front-wheel
  drives in the BMW production network. The BMW 2 Series Active Tourer
  will also keep our plant running at capacity over the longer term.”</p>
<p>The key characteristics of the latest model generation are its
  extremely dynamic styling, clear design language and redesigned
  interior. In addition, the new BMW 2 Series Active Tourer takes mild
  hybrid technology into the compact class for the very first time,
  along with the latest connectivity features and extended equipment packages.</p>
<p>
  <strong>BMW 2 Series Active Tourer sets new standards</strong></p>
<p>Making its debut back in 2014, the BMW 2 Series Active Tourer caused
  a revolution in the BMW product portfolio. Not only did it establish
  the Sports Activity Tourer segment, it was also the first front-wheel
  drive BMW. With its functional space concept, three-cylinder engines –
  a first for BMW at the time – and cutting-edge front-wheel drive, the
  newcomer offered all the dynamism of a BMW and heralded a new era for
  the brand.</p>
<p>The second-generation BMW 2 Series Active Tourer sets standards once
  again. A pioneer, it paves the way for the forthcoming BMW and MINI
  models joining the compact segment over the coming years. Aspects such
  as the enhancements to the drivetrain and cockpit, and the new onboard
  network – now found in petrol and diesel-powered BMW 2 Series Active
  Tourer – all set new standards.</p>
<p>
  <strong>Seamless integration into production processes</strong></p>
<p>Renowned for its extreme flexibility, Plant Leipzig had previously
  been entrusted with the manufacture of the BMW Group’s first
  electrified models – the BMW i3 and BMW i8. It is now the plant of
  choice once again, for the launch of this new vehicle concept. Despite
  the new requirements, only minor adjustments had to be made to the
  paintshop and assembly systems, and the only new production area was
  introduced into the bodyshop.</p>
<p>The second generation of the BMW 2 Series Active Tourer has now been
  integrated into production just as seamlessly and will roll off
  Leipzig’s production lines along with the BMW 1 Series and BMW 2
  Series Gran Coupe.</p>
<p>
  <strong>Dynamic design and updated interior</strong></p>
<p>In terms of exterior design, the new BMW 2 Series Active Tourer now
  exudes even more sportiness and self-assurance, thanks to its
  dynamically elongated proportions and the clear, reduced treatment of
  its surfaces.</p>
<p>Inside, it offers a completely new sense of space. The interior has
  been fully redesigned, taking its cues from the fully electric
  technology flagship, the BMW iX. Particularly striking are the BMW
  Curved Display, the ‘floating’ armrest with its integrated control
  panel, and the slim instrument panel. Thanks to these features, the
  BMW 2 Series Active Tourer is the first non-electric BMW to have the
  cockpit layout of an electric one.</p>
<p>Another first in the latest BMW 2 Series Active Tourer is the new BMW
  iDrive, which makes its debut appearance in the premium compact
  segment. The latest generation of the iDrive control system is based
  on BMW Operating System 8.</p>
<p>The second-generation BMW 2 Series Active Tourer designed to
  accommodate combustion engines as well as electrified drive systems,
  and just a few months after market launch in summer 2022, two plug-in
  hybrids will be added to the range.</p>
<p>The BMW 2 Series Active Tourer is due for market launch in Germany on
  26 February 2022.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Locations,Production Plants,Leipzig,Active Tourer,U06]]></category>
            <pubDate>Tue, 02 Nov 2021 11:00:00 +0100</pubDate>
            <pp:lastModified>Tue, 02 Nov 2021 10:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/bf23c9de-d5a4-4cac-96c6-748ee803ef19/500_P90443006_highRes_second-generation-bm.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/bf23c9de-d5a4-4cac-96c6-748ee803ef19/500_P90443006_highRes_second-generation-bm.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/bf23c9de-d5a4-4cac-96c6-748ee803ef19/P90443006_highRes_second-generation-bm.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90443006_highRes_second-generation-bm.jpg]]></pp:imageTitle></item><item>
                        <title>20 years ago: BMW Group chooses Leipzig as site for new plant</title>
                        <link>https://newsroom.bmwgroup.com/global/20-years-ago-bmw-group-chooses-leipzig-as-site-for-new-plant/</link>
                        <guid>https://newsroom.bmwgroup.com/global/20-years-ago-bmw-group-chooses-leipzig-as-site-for-new-plant/</guid><pp:caseid>767297</pp:caseid><pp:summary><![CDATA[+++ Leipzig is chosen from among 250 applicants +++ Announcement at a press conference in Munich +++ Plant Leipzig is the production network’s pioneer in electromobility +++ Total investment of over €3 billion +++ More than 3 million vehicles made +++ Further investments in the future of the plant +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Of the 250-plus applications that came in,
  only five made it onto the shortlist – but ultimately it was Leipzig
  that won. Twenty years ago, on 18 July 2001, the BMW Group announced
  at a press conference in Munich that it would build a new plant in
  Leipzig. “Here you can see the location that best meets our needs
  overall,” said Prof. Joachim Milberg, Chairman of the BMW AG Board of
  Management at the time.</p>
<p>Leipzig as a base and the over 200-hectare site near the city’s
  exhibition centre won on the basis of the following criteria:</p>
<p>1. Ideal conditions and location for a future plant</p>
<p>2. Availability of qualified personnel</p>
<p>3. Use of existing supplies and logistics structures</p>
<p>4. Very good infrastructure for traffic, supplies and waste</p>
<p>5. Links to the BMW production network</p>
<p>6. Fast implementation process</p>
<p>7. Economic efficiency and flexibility</p>
<p>At the time, the BMW Group expected… 5,500halfat in the new plant
  Daily output from 2005 was projected to be 650 units, at an investment
  of around €1 billion. When production was finally launched, the plant
  employed about 2,500 people. Today, twenty years later, daily output
  stands at more than 1,100 units, made by a plant workforce of over
  8,000 employees. Investments have so far totalled more than €3 billion
  and are still ongoing. Since March 2005 Leipzig has produced more than
  three million vehicles in total. Speaking about the positive
  development of Leipzig, Works Council Chairman Jens Köhler expressed
  his delight: “Ever since the decision was made, the management and
  Works Council have cooperated to increase the workforce considerably
  and make us an integral part of the region.”</p>
<p>The choice of Leipzig received an enthusiastic welcome, and support
  in the region was huge. There was also a vast number of job
  applicants: the day after the announcement, the dedicated call centre
  received more than 4,000 calls, and boxes and boxes of mail came in in
  a matter of days. In September 2001, a first cohort of 35 trainees
  began work at BMW Group Plant Leipzig. Since then Plant Leipzig has
  welcomed 900 apprentices, almost all of whom continue to work there.</p>
<p>The BMW Group laid the foundation in Leipzig for one of the most
  sustainable, state-of-the-art vehicle plants in the world. Its
  particularly well thought-out, flexible structures are an outstanding
  feature and include the ‘finger’ layout of the assembly hall – a world
  first that enables ideal logistics solutions and offers plenty of
  scope for flexibility. Specially developed for Plant Leipzig, the
  ‘finger’ layout allows trucks to deliver purchased parts and
  pre-assemblies straight to the lineside. In addition, new production
  stages can be integrated into the process and lines can be extended
  without requiring new buildings.</p>
<p>Since 2005 Plant Leipzig has consistently demonstrated its
  adaptability, integrating new products, processes and technologies and
  often playing a pioneering role within the BMW Group production
  network. As the birthplace of electromobility at the BMW Group, for
  example, Leipzig has manufactured over 200,000 fully electric BMW i3
  cars and was the first car plant in the world to use CFRP (carbon
  fibre-reinforced plastic) in series production. The BMW Group
  continues to benefit from the plant’s collective skills in the field
  of electromobility, and Leipzig has been part of the international
  production network for high-voltage batteries since May of this year.</p>
<p>In 2023 Leipzig will demonstrate its flexibility once again, when it
  becomes the first German facility to produce both BMW and MINI
  vehicles, all on the same production line. Contracted to manufacture
  the all-new successor to the current MINI Countryman, the plant will
  make both the combustion-powered and the fully electric versions.
  “Over the last few years, we have worked constantly to lead our plant
  into a successful future. The contract to manufacture the MINI
  Countryman successor is taking us towards a further milestone,” said
  Hans-Peter Kemser, Plant Director at BMW Group Plant Leipzig. And
  that’s not the only goal Leipzig has set itself: “As a green plant, we
  want not only to be carbon-neutral but also to manufacture with zero
  CO2 emissions,” said Hans-Peter Kemser, announcing plans for the near
  future of the plant.</p>
<p>Burkhard Jung, Lord Mayor of Leipzig, also sees the BMW Group’s
  choice of Leipzig as a major milestone for the city and region:
  “Leipzig is an industrial base again. This development – which has
  been so important for us in economic terms – would have been almost
  unimaginable without the decision that was made in Munich 20 years
  ago. Over the last two decades, the north of Leipzig has evolved to
  become an industry heartland for the entire region. It’s a
  technological and industrial development that is benefitting people
  from Leipzig and far beyond. BMW in Leipzig not only produces cars but
  also works on the vehicles and production methods of the future. That
  fills me with confidence: Leipzig will remain particularly important,
  both for the transformation of transport and in the development of new technologies.”</p>
<p>Key events, past and future, at BMW Group Plant Leipzig:</p>
<ul>
  <li>
    <strong> </strong>
    <strong>2002</strong> Zaha Hadid’s proposal for the design of the
    central building is chosen. The ground-breaking ceremony his held.</li>
  <li>
    <strong>2003</strong> The foundation stone is laid for the central
    building. The topping-out is celebrated.</li>
  <li>
    <strong>2005 </strong>Plant Leipzig goes on stream, launching series
    production of the BMW 3 Series. The central building wins the German
    Architecture Award.</li>
  <li>
    <strong>2009 </strong>Plant Leipzig produces its
    500,000<sup>th</sup> vehicle. The new press shop opens, with the
    first high-speed servo press in the world.</li>
  <li>
    <strong>2011 </strong>Plant Leipzig manufactures its millionth BMW.</li></ul>
<ul>
  <li>
    <strong>2013 </strong>Four wind turbines go into operation.
    Production of the BMW i3 begins, and Leipzig becomes the first car
    plant in the world to integrate CFRP into series production.</li>
  <li>
    <strong>2014 </strong>Production of the BMW i8 begins. The plant is
    extended to accommodate the manufacture of the BMW 2 Series Active
    Tourer (the first front-wheel drive BMW), and the press plant is upgraded.</li>
  <li>
    <strong>2016 </strong>Plant Leipzig manufactures its 2 millionth BMW.</li>
  <li>
    <strong>2017 </strong>The Battery Farm goes into operation.</li>
  <li>
    <strong>2019 </strong>The paintshop is upgraded.</li>
  <li>
    <strong>2021</strong> Plant Leipzig produces its 3 millionth BMW.
    Production of battery modules is launched.</li>
  <li>
    <strong>2023 </strong>Production of the MINI Countryman successor to begin.</li></ul><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Kai Lichte<br>Tel: +49-341-445-38000<br>E-mail: <a href="mailto:kai.lichte@bmwgroup.com">kai.lichte@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Events,Locations,Production Plants,Leipzig]]></category>
            <pubDate>Thu, 15 Jul 2021 17:10:00 +0200</pubDate>
            <pp:lastModified>Thu, 15 Jul 2021 15:10:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/b488329b-6f99-4606-810b-6ce08c5a1905/500_P90430420_highRes_the-bmw-group-announ.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/b488329b-6f99-4606-810b-6ce08c5a1905/500_P90430420_highRes_the-bmw-group-announ.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/b488329b-6f99-4606-810b-6ce08c5a1905/P90430420_highRes_the-bmw-group-announ.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90430420_highRes_the-bmw-group-announ.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group expands e-drive production network: Start of battery component production in Leipzig and Regensburg</title>
                        <link>https://newsroom.bmwgroup.com/global/bmw-group-expands-e-drive-production-network-start-of-battery-component-production-in-leipzig-and-regensburg/</link>
                        <guid>https://newsroom.bmwgroup.com/global/bmw-group-expands-e-drive-production-network-start-of-battery-component-production-in-leipzig-and-regensburg/</guid><pp:caseid>767470</pp:caseid><pp:summary><![CDATA[BMW Group now producing high-voltage batteries and battery components at three locations in Germany alone: Dingolfing, Leipzig and Regensburg +++ Less than a year from decision to start of production in Leipzig and Regensburg +++ Production of battery components for BMW Group’s fifth generation of fully-electric vehicles]]></pp:summary><description><![CDATA[<div class="imported-article"><ul>
  <li>BMW Group now producing high-voltage batteries and <br />battery
    components at three locations in Germany alone: <br />Dingolfing,
    Leipzig and Regensburg</li>
  <li>Less than a year from decision to start of production in
    <br />Leipzig and Regensburg</li>
  <li>Production of battery components for BMW Group’s fifth generation
    of fully-electric vehicles</li></ul>
<p>
  <strong> <br clear="all" /></strong></p>
<p>
  <strong>Munich/Leipzig/Regensburg. </strong>The BMW Group is launching
  production of battery components at its plants in Leipzig and
  Regensburg and expanding its e-drive production network. It has been
  less than a year since the decision was made to expand production
  capacity for e-drives in Germany. BMW Group Plant Leipzig will launch
  series production of battery modules on Monday, 3 May 2021, while BMW
  Group Plant Regensburg began coating battery cells for high-voltage
  batteries in April 2021. High-voltage batteries will also be produced
  in Regensburg from 2022. “We expect at least 50 percent of the
  vehicles we deliver to our customers worldwide to be fully electric by
  2030,” said Michael Nikolaides, Senior Vice President Production
  Engines and E-Drives. “And we are systematically expanding our
  production network for electric drive trains in response to this.”</p>
<p>The company is investing more than 250 million euros in its
  Regensburg and Leipzig locations alone to supply the BMW Group’s
  growing number of electrified vehicles with high-voltage batteries.
  High-voltage battery components will be used in production of the BMW
  iX* and BMW i4, both of which will be released onto the market
  shortly. The production systems are highly flexible and will also
  supply battery components for other BMW Group electrified vehicles in
  the future.</p>
<p>“We are increasing capacity at existing locations and developing
  capabilities at others. In this way, we can make the most of our
  associates’ expertise and experience and offer them long-term, secure
  jobs,” Nikolaides added. The BMW Group is investing a total of around
  790 million euros in expanding production capacity for drivetrain
  components for electrified vehicles at its Dingolfing, Leipzig,
  Regensburg and Steyr locations between 2020 and 2022.</p>
<p>
  <strong>
    <br />Production of battery modules at BMW Group Plant Leipzig</strong></p>
<p>Leipzig is the BMW Group’s pioneer plant for electromobility and has
  been building the BMW Group’s first fully-electric vehicle, the BMW
  i3*, since 2013. Now, the location will also produce electric
  drivetrain components.</p>
<p>“We are continuing on this track with the launch of battery module
  production and further enhancing the plant’s future viability for
  electromobility,” confirmed Hans-Peter Kemser, Plant Director of BMW
  Group Plant Leipzig. “Plant Leipzig will play an important role in
  supplying the growing number of BMW Group electrified vehicles with
  battery components.” The successor to the MINI Countryman, scheduled
  to come off the production line in Leipzig from 2023, will be released
  onto the market with an electric drive train. “The expertise and
  experience gained by staff at our location over the years can be put
  to good use. Construction of the battery module lines will make a
  major contribution to long-term job security,” emphasised Kemser.</p>
<p>From May 2021, the 10,000 sq. m. production area previously reserved
  for the BMW i8 will be used for manufacturing battery modules.
  Production will get underway with 80 employees working in battery
  module production; by the end of the year, there will be a staff of
  around 150. The company will invest more than 100 million euros in the
  initial phase of battery module production at the Leipzig location
  between 2020 and 2022.</p>
<p>However, the production line for battery modules that just ramped up
  is only the beginning: The company has already decided to further
  increase capacity for battery module production at its Leipzig
  location. A second production line will come on stream in 2022. This
  will ensure the company has sufficient volumes to meet growing demand
  for drivetrains.</p>
<p>
  <strong>
    <br clear="all" />Production of battery components and high-voltage
    batteries at BMW Group Plant Regensburg</strong></p>
<p>BMW Group Plant Regensburg already produces two electrified models –
  plug-in hybrid variants of the BMW X1* and BMW X2* – and will start
  building the fully-electric BMW X1 in 2022. The site's e-mobility
  expertise and experience will now also be used in production of
  battery components and high-voltage batteries.</p>
<p>The first of four coating lines for fifth-generation battery cells
  went on stream in April 2021, occupying a production and logistics
  area of more than 40,000 sq. m. “Regensburg has made a successful
  start to production of electric drivetrain components – this is an
  important milestone in our transformation,” according to Frank
  Bachmann, Plant Director of BMW Group Plant Regensburg. The three
  other systems will ramp up in stages between now and the end of 2021
  to supply the growing volumes needed for the BMW Group’s fully
  electric vehicles. Up until now, battery cells have been coated at BMW
  Group Plant Dingolfing and the BMW Brilliance Automotive Plant
  Powertrain in Shenyang, China.</p>
<p>Coating increases the battery cell’s mechanical robustness and
  thermal conductivity. This helps improve insulation and cooling of the
  fifth-generation e-drive’s even more powerful battery cells. From
  2022, the plant in Regensburg will produce high-voltage batteries from
  battery modules. A total of 100 employees already work in battery
  component production at the Regensburg site; by the end of 2022, there
  will be more than 300. The company will invest more than 150 million
  euros in ramping up production of battery components and high-voltage
  batteries between 2020 and 2022.<br />
  <br />
  <strong>Holistic approach to sustainability</strong></p>
<p>The BMW Group has a clear mission to ensure the “greenest electric
  vehicle comes from the BMW Group”, starting in production. The BMW
  Group already sources only green power for its manufacturing locations worldwide.</p>
<p>The BMW Group’s energy goals are geared towards the long term. The
  company reduced its emissions per vehicle produced by more than 70
  percent between 2019 and 2006.The aim is to lower these CO2 emissions
  by another 80 percent by 2030. This means the BMW Group will have
  reduced its CO2 emissions from production to less than ten percent of
  what they were in 2006.</p>
<p>A further corporate objective is to reduce CO2 emissions in the
  supplier network by 20 percent by 2030. At the same time, the BMW
  Group has reached an agreement with its suppliers that they will only
  use renewable green power for producing fifth-generation battery
    cells.<br clear="all" />
  <strong>
    <br clear="all" />From battery cell to high-voltage battery</strong></p>
<p>Production of high-voltage batteries can be broken down into two
  stages: Battery modules are produced in a highly automated process.
  The lithium-ion cells first undergo a plasma cleaning, before a
  specially developed system coats the cells to ensure optimal
  insulation. Next, the battery cells are assembled into a larger unit,
  the so-called battery module. The BMW Group obtains its battery cells
  from partners who produce them to the company’s exact specifications.
  The BMW Group uses different battery cells, depending on which
  provides the best properties for each vehicle concept.</p>
<p>The battery modules are then installed in an aluminium housing,
  together with the connections to the vehicle, and the control and
  cooling units. The size and shape of the aluminium housing and the
  number of battery modules used differ according to the vehicle
  variant. This ensures the high-voltage battery is optimally adjusted
  to the vehicle.<br />
  <br />
  <strong>Global e-drive production network focused in Germany</strong></p>
<p>The high-voltage batteries and battery components needed for all BMW
  and MINI electrified vehicles come from the company’s own battery
  factories in Dingolfing, Leipzig and Regensburg in Germany, as well as
  from Spartanburg (USA) and Shenyang (China). The BMW Group has also
  localised production of high-voltage batteries in Thailand, at its
  Rayong plant, and is working with the Dräxlmaier Group for this.
  Munich is home to the e-drive pilot plant and the Battery Cell
  Competence Centre, where the BMW Group is conducting a full analysis
  of battery cell value creation processes and refining technology for
  its production processes.</p>
<p>The company produces electric motors at the Competence Centre for
  E-Drive Production in Dingolfing and at BMW Group Plant Landshut. BMW
  Group Plant Steyr builds the housing for the highly integrated
  fifth-generation e-drive.</p>
<p>With the BMW Group’s electro-offensive now in full swing, increased
  production capacity is needed for electric drivetrain components.
  Thanks to intelligent vehicle architectures and a highly flexible
  production network, the BMW Group will have about a dozen
  fully-electric models on the roads from 2023. The BMW i3*, MINI Cooper
  SE* and BMW iX3* already on the market will be joined later this year
  by the BMW iX* and BMW i4. Between now and 2025, the BMW Group will
  increase its sales of fully-electric models by an average of well over
  50 percent per year – more than ten times the number of units sold in
  2020. By the end of 2025, the company will have delivered a total of
  around two million fully-electric vehicles to customers. Based on
  current market forecasts, the BMW Group expects at least 50 percent of
  its global sales to come from fully-electric vehicles in 2030. In
  total, over the next ten years or so, the company will release about
  ten million fully-electric vehicles onto the roads.</p>
<p>This means the BMW Group is strategically on track to reach the
  European Union’s ambitious CO2 reduction targets for 2025 and 2030 as well.</p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>
  <strong>BMW</strong>
  <strong>i3:</strong> Fuel consumption combined: 0.0 l/100 km; power
  consumption combined: 16.3-15.3 kWh/100 km WLTP; CO<sub>2</sub>
  emissions combined: 0 g/km.</p>
<p>
  <strong>BMW</strong>
  <strong>i3s:</strong> Fuel consumption combined: 0.0 l/100 km; power
  consumption combined: 16.6-16.3 kWh/100 km WLTP; CO<sub>2</sub>
  emissions combined: 0 g/km.</p>
<p>
  <strong>MINI Cooper SE:</strong> Fuel consumption combined: 0.0 l/100
  km; power consumption combined: 17.6-15.2 kWh/100 km WLTP,
  CO<sub>2</sub> emissions combined: 0 g/km</p>
<p>
  <strong>BMW iX3: </strong>Fuel consumption combined: 0.0 l/100 km;
  power consumption combined: 17.8-17.5 kWh/100 km WLTP, CO<sub>2</sub>
  emissions combined: 0 g/km.</p>
<p>
  <strong>BMW iX xDrive50: </strong>Power consumption combined: < 21
  kWh/100 km in the WLTP test cycle; CO<sub>2</sub> emissions combined:
  0 g/km (data is provisional and based on forecasts)</p>
<p>
  <strong>BMW iX xDrive40: </strong>Power consumption combined: < 20
  kWh/100 km in the WLTP test cycle; CO<sub>2</sub> emissions combined:
  0 g/km (data is provisional and based on forecasts)</p>
<p>
  <strong>BMW X1 xDrive25e:</strong> Fuel consumption combined: 1.9-1.7
  l/100 km WLTP, power consumption combined: 15.4-15.0 kWh/100 km WLTP;
  CO<sub>2</sub> emissions combined: 43 g/km. </p>
<p>
  <strong>BMW X2 xDrive25e:</strong> Fuel consumption combined: 1.9
  l/100 km WLTP; power consumption combined: 13.7 kWh/100 km WLTP,
  CO<sub>2</sub> emissions combined: 43 g/km. </p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Lisa Weiss<br>Tel: +49-89-382-93127<br>E-mail: <a href="mailto:lisa.lw.weiss@bmwgroup.com">lisa.lw.weiss@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Sustainability,Drive Technologies,Production Plants,Leipzig,Innovation,Production,Battery Cells]]></category>
            <pubDate>Fri, 30 Apr 2021 10:00:00 +0200</pubDate>
            <pp:lastModified>Fri, 30 Apr 2021 08:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3228/29fc114f-6b7a-414c-91ba-f8def3029301/500_P90419738_highRes_production-of-batter.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3228/29fc114f-6b7a-414c-91ba-f8def3029301/500_P90419738_highRes_production-of-batter.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3228/29fc114f-6b7a-414c-91ba-f8def3029301/P90419738_highRes_production-of-batter.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90419738_highRes_production-of-batter.jpg]]></pp:imageTitle></item></channel>
                    </rss>