The press kit contains information about the BMW Group produktion network with currently 30 plants in 14 countries.
Contents:
- The BMW Group’s strategy: Production follows the market.
- Efficient production: Flexibility is the top priority.
- Business is people: Our employees drive our success.
- One for all – All for one: The BMW Group’s production network.
- Automotive production: The BMW Group’s vehicle plants.
- Engines, components, contract production and motorcycles:
The other sites in the BMW Group production network. - Quality from the outset: How a car is made.
- Sustainability is a given: Clean Production.
- Truly one of a kind: What makes the BMW Group Production unique.
- Industry 4.0: The BMW Group’s vision of the production of the future.
- Further information.
- BMW plant Regensburg, production BMW 1 Series, Marriage (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Door Assembly (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Roller Test Bench (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Finish (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Seat Assembly (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Wheel Assembly (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Assembly Frontend / Backend (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Body Shop (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Paint Shop (06/2011)
- BMW plant Regensburg, production BMW 1 Series, Cathodic Cleaning, Paint Shop(06/2011)
- BMW Plant Steyr – Engine Assembly (01/2012)
- BMW Plant Steyr – Engine Assembly (01/2012)
- BMW Plant Steyr – Engine Assembly (01/2012)
- BMW Plant Steyr – Engine Assembly (01/2012)
- BMW Plant Steyr – Diesel Engine Development Center (01/2012)
- BMW Plant Tiexi - Assembly of BMW X1 (05/2012)
- BMW Plant Tiexi - Assembly of BMW X1 (05/2012)
- BMW Plant Tiexi - Assembly of BMW X1 (05/2012)
- BMW Plant Tiexi - Assembly of BMW X1 (05/2012)
- Application of BMW Logo Plant Tiexi (05/2012)
- BMW Plant Steyr – Gate1 (06/2012)
- BMW Plant Eisenach (09/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW R 1200 GS, production at the BMW Motorrad plant Berlin (11/2012)
- BMW plant Dingolfing, production, assembly (02/2013)
- BMW plant Dingolfing, production, assembly finish (02/2013)
- BMW plant Dingolfing, production, assembly finish (02/2013)
- BMW plant Dingolfing, production, assembly finish (02/2013)
- BMW plant Dingolfing, production, assembly finish (02/2013)
- BMW plant Dingolfing, production, assembly (02/2013)
- BMW team member at the BMW Plant in Spartanburg, SC, fuels a hydrogen-powered fuel cell fork lift. (03/2013)
- A BMW team member at the BMW Plant in Spartanburg, SC, drives a hydrogen-powered fuel cell material handling train. (03/2013)
- A BMW team member at the BMW Plant in Spartanburg, SC, drives a hydrogen-powered fuel cell fork lift. (03/2013)
- An aerial view of the BMW Manufacturing facility in Spartanburg, SC. (03/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber fabrics for the BMW i3 (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber recycling material for the use in the BMW i3, e.g. the roof of the BMW i3 (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber recycling material for the use in the BMW i3, e.g. the roof of the BMW i3 (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber spools on a gap at the plant in Wackersdorf (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber tows for the production of carbon fiber fabrics at the plant in Wackersdorf (09/2013)
- BMW i Production CFRP Wackersdorf: Gap for carbon fiber spools at the plant in Wackersdorf (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber fabrics maschine (09/2013)
- BMW i Production CFRP Wackersdorf: Quality testing of CFRP (09/2013)
- BMW i Production CFRP Wackersdorf: Quality testing of carbon fiber textiles (09/2013)
- BMW i Production CFRP Wackersdorf: One roving contains 50,000 individual filaments (09/2013)
- BMW i Production CFRP Wackersdorf: Sewing threads for the production of carbon fiber textiles at the plant in Wackersdorf (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fiber tows for the production of 0° carbon fiber material for the BMW i3 (09/2013)
- BMW i Production CFRP Wackersdorf: Carbon fibers before the production into 0° material (09/2013)
- BMW i3 Production Plant Dingolfing: End of line test highvoltage battery (09/2013)
- BMW i3 Production BMW Plant Dingolfing: high-voltage battery (09/2013)
- BMW i Production Moses Lake: View into the oxidation portion of the carbon fiber production. White Precursor and different colors of oxidized fiber (09/2013)
- BMW i Production Moses Lake: Each polyacrylnitirl tow consists of 100.000 filaments and is good for production of two Carbon fiber tows 50.000 filaments each. (09/2013)
- BMW i Production Moses Lake: White polyacrylnitril precursor for the Carbon Fiber production (09/2013)
- BMW i Production Moses Lake: White polyacrylnitril precursor for the Carbon Fiber production (09/2013)
- BMW i Production Moses Lake: White polyacrylnitril precursor for the Carbon Fiber production (09/2013)
- BMW i Production Moses Lake: Oxidized fibers (09/2013)
- BMW i Production Moses Lake: Carbon Fiber Tows right before sizing (09/2013)
- BMW i Production Moses Lake: Carbon Fiber Tows right before sizing (09/2013)
- BMW i Production Moses Lake: Desiccation of the sized carbon fiber with steam heated rollers (09/2013)
- BMW i Production: Last rollers of one the two carbon fiber lines in Moses Lake. (09/2013)
- BMW i Production: Carbon Fiber Tows in the Moses Lake Plant (09/2013)
- BMW i Production CFRP Wackersdorf: Gap for carbon fiber spools for the production of 0° Material at the plant in Wackersdorf (09/2013)
- BMW i Production CFRP Wackersdorf: Production of 600g/ m² 0°material for the use in BMW I models (09/2013)
- BMW i3 Production BMW Plant Dingolfing: High Voltage Battery BMW i3 (09/2013)
- BMW i3 Production BMW Plant Dingolfing: High Voltage Battery BMW i3 (09/2013)
- BMW i3 Production BMW Plant Dingolfing: High Voltage Battery BMW i3 (09/2013)
- BMW i3 Production BMW Plant Dingolfing: High Voltage Battery BMW i3 (09/2013)
- BMW i3 Production BMW Plant Dingolfing: Welding of Aluminium-Chassis(09/2013)
- BMW i3 Production BMW Plant Dingolfing: Welding of Aluminium-Chassis(09/2013)
- BMW i3 Production BMW Plant Dingolfing: Welding of Aluminium-Chassis(09/2013)
- BMW i3 Production BMW Plant Dingolfing: Welding of Aluminium-Chassis(09/2013)
- BMW i3 Production BMW Plant Dingolfing: Electric Gearbox BMW i3 (09/2013)
- BMW i3 Production BMW Plant Dingolfing: Electric Gearbox BMW i3 (09/2013)
- BMW i3 Production BMW Plant Dingolfing: High Voltage Battery BMW i3 (09/2013) (09/2013)
- BMW i3 Production BMW Plant Dingolfing: High Voltage Battery BMW i3 (09/2013)
- Body side sub assembly with portal robot.
- Body side transfer robot.
- Car waiting for body sides to be spot welded.
- Fixing body sides to the car body.
- Inline measurement of car body.
- Inline measurement of car body.
- Sub assembly held in a fixture for spot welding.
- Associate inserting the trunk e-coat (electro coating) jig into the car body ready for the paintshop.
- Camera measurement system checking dimensional accuracy of a mid-build car body shell.
- Simultaneous spot welding of a sub assembly in a geometry fixture.
- Plant Oxford associate measuring points on the new car.
- A solid aluminium car body is used for measurement reference points.
- Aluminium body being measured for reference points.
- An engineer applies laser reference spots in the geometric optical measurement cell.
- The laser in action in the geometric optical measurement cell.
- The water test facility in action.
- Icicles appear as a MINI is subjected to sub zero temperatures in the climate test booth.
- Icicles appear as a MINI is subjected to sub zero temperatures in the climate test booth.
- A MINI is tested in the new acoustic testing chamber.
- A MINI is tested in the new acoustic testing chamber.
- GOM Measurement cell for the outer panels in Sub Assembly, MINI Plant Swindon.
- Coils of steel ready to be pressed at MINI Plant Swindon.
- Steel being loaded into blanker in the press shop, MINI Plant Swindon.
- Steel being dropped to straighten it in the blanker, in the press shop, MINI Plant Swindon.
- Line 15, in the press shop, MINI Plant Swindon.
- Inside line 15, bonnets being pressed, in the press shop, MINI Plant Swindon.
- The final outer bonnet skins leaving the end of line 15, in the press shop, MINI Plant Swindon.
- Quality checks to ensure standards are met in the press shop, MINI Plant Swindon.
- The bonnet cell in sub assembly, MINI Plant Swindon, where the bonnets are constructed.
- The bonnet inners are joined to the outer surface of the bonnet in the tactile laser welding cell, in sub assembly, MINI Plant Swindon.
- The MINI's new paint being baked in the oven at Plant Oxford's paintshop.
- In the fully automated top coat spray booth.
- Robots about to apply sealant on the seam seal line.
- Final inspection on the seam seal line.
- Polish and check to remove surface dust.
- Robots start to open the car doors before the colour coat is applied.
- Lining up to be given a final polish.
- The car in the rotary slings at Plant Oxford.
- Cockpit fitment - the dashboard module is positioned.
- The cockpit and wiring are in place and the car is about to be transported to the next stage of the assembly process.
- In the rotary slings the car has had its fuel tank and lines fitted.
- The new glazing cell in assembly.
- Contract manufacturing of the new MINI model at the VDL Nedcar plant in Born, Netherlands (02/2014)
- A Volcanic Orange MINI makes its way along the production line.
- Contract manufacturing of the new MINI model at the VDL Nedcar plant in Born, Netherlands (02/2014)
- At engine marriage as the engine is lifted up under the car for fitment.
- Wheel fitment.
- The final part of the production process in assembly.
- Contract manufacturing of the new MINI model at the VDL Nedcar plant in Born, Netherlands - body shop (02/2014)
- Contract manufacturing of the new MINI model at the VDL Nedcar plant in Born, Netherlands - body shop (02/2014)
- Contract manufacturing of the new MINI model at the VDL Nedcar plant in Born, Netherlands (02/2014)
- Driving off the finishing line.
- BMW plant Munich production, assembly: assembly of frontend BMW M4 Coupé (02/2014)
- BMW plant Munich production, assembly: BMW M4 Coupé on finishline (02/2014)
- BMW plant Munich production, paint shop: preparation glueing CFRP roof BMW M4 Coupé (02/2014)
- BMW plant Munich production, paint shop: preparation glueing CFRP roof BMW M4 Coupé (02/2014)
- BMW plant Munich production, paint shop: preparation glueing CFRP roof BMW M4 Coupé (02/2014)
- BMW plant Munich production, paint shop: automated glueing installation CFRP roof BMW M4 Coupé(02/2014)
- BMW plant Munich production, paint shop: postprocessing glueing CFRP roof BMW M4 Coupé (02/2014)
- BMW plant Munich production, paint shop: automated glueing installation CFRP roof BMW M4 Coupé(02/2014)
- BMW plant Munich production, paint shop: postprocessing glueing CFRP roof BMW M4 Coupé (02/2014)
- BMW Plant Spartanburg Aerial Photo 2014. (03/2014)
- BMW plant Berlin manufactures 500,000th BMW GS motorcycle with boxer engine. (03/2014)
- Plant Spartanburg X4 Assembly Line (03/2014)
- Plant Spartanburg X4 Assembly Line (03/2014)
- Plant Spartanburg Engine Marriage (03/2014)
- Plant Spartanburg Integrated Paint Process (03/2014)
- Plant Spartanburg Body Shop (03/2014)
- Plant Spartanburg Body Shop (03/2014)
- BMW C evolution Finish BMW Plant Berlin (04/2014)
- BMW C evolution Assembly BMW Plant Berlin. (04/2014)
- BMW C evolution Assembly high-voltage battery BMW Plant Berlin (04/2014)
- BMW C evolution_Test rig BMW Plant Berlin (04/2014)
- Production BMW i: bumper production BMW i8 in the Landshut plant (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- BMW plant Leipzig – assembly of the BMW i (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- Production of Carbon Fibers at SGL Automotive Carbon Fibers, the Joint Venture of BMW Group and SGL Group at Moses Lake, Washington State, USA (04/2014)
- HOME OF ROLLS-ROYCE MOTOR CARS, LEATHERSHOP
- HOME OF ROLLS-ROYCE MOTOR CARS, LEATHERSHOP
- HOME OF ROLLS-ROYCE MOTOR CARS, GOODWOOD
- BMW Group and SGL Group to triple production capacities at Moses Lake carbon fiber plant
- BMW Plant Landshut: new innovation and production centre for CFRP - an employee inserts a side frame into the RTM-press. (06/2014)
- BMW Plant Landshut: new innovation and production centre for CFRP – an employee controls the quality of a preform for a BMW i8 side frame. (06/2014)
- BMW Plant Landshut: new innovation and production centre for CFRP – employees carry a BMW i8 side frame. (06/2014)
- BMW Plant Landshut: new innovation and production centre for CFRP – an employee checks the quality of a BMW i8 side frame. (06/2014)
- BMW Plant Munich, Engine Plant, Assembly modular engine set (06/2014)
- BMW Plant Landshut: new innovation and production centre for CFRP – employees tailor performs for a BMW i8 side frame. (06/2014)
- BMW Plant Munich, Engine Plant, Assembly modular engine set (06/2014)
- BMW Plant Munich, Engine Plant, Assembly cylinder head casket (06/2014)
- BMW Plant Munich, Engine Plant, Assembly modular engine set (06/2014)
- BMW Plant Munich, Engine Plant, Assembly modular engine set (06/2014)
- BMW Group’s Landshut plant: bumper production - non-contact gesture detection (Industry 4.0) (06/2014)
- BMW Group’s Landshut plant: bumper production - non-contact gesture detection (Industry 4.0) (06/2014)
- BMW Group’s Munich plant: Customized assembly support from the 3D printer (Industry 4.0) (06/2014)
- BMW Group’s Munich plant: Customized assembly support from the 3D printer (Industry 4.0) (06/2014)
- 5-door hatch in the rotary sling in Plant Oxford's assembly hall.
- An associate preparing door wiring for the MINI 5-door in Plant Oxford's assembly hall.
- A Volcanic Orange 5-door goes through the first stage at the assembly process at Plant Oxford.
- Associates working on the MINI 5-door at the first production line in Plant Oxford's assembly hall.
- The rotary sling at MINI Plant Oxford.
- An associate working on the new 5-door MINI in Plant Oxford's assembly hall.
- Working on the tailgate in Plant Oxford's assembly hall.
- Robots welding the side frame for the new 5-door MINI in Plant Oxford's bodyshop.
- Robots welding the side frame for the new 5-door MINI in Plant Oxford's bodyshop.
- Robots working on the side frame of the new MINI 5-door in Plant Oxford's bodyshop.
- The bodyshell of the new 5-door MINI as it goes through Plant Oxford's bodyshop.
- The bodyshell of the new 5-door MINI as it goes through Plant Oxford's bodyshop.
- The bodyshell of the new 5-door MINI as it goes through Plant Oxford's bodyshop.
- Associates checking the bodyshell of the 5-door MINI on the seam seal line in Plant Oxford's paintshop.
- Associates checking the bodyshell of the 5-door MINI on the seam seal line in Plant Oxford's paintshop.
- The new 5-door is about to enter the robot spray booth in Plant Oxford's paintshop.
- In the robot spray booth in Plant Oxford's paintshop.
- In the robot spray booth in Plant Oxford's paintshop.
- In the robot spray booth in Plant Oxford's paintshop.
- An Electric Blue MINI 5-door comes off the assembly line.
- Produced at Plant Swindon, the rear doors are packed individually to ensure the highest quality is maintained.
- BMW Plant Leipzig, Production of BMW 2 Series Active Tourer, Assembly finish (07/2014)
- BMW Plant Leipzig, Production of BMW 2 Series Active Tourer, Assembly finish (07/2014)
- Production of the new generation of engines for the BMW i8 hybrid plug in sports car exclusively being built at BMW Plant Hams Hall.
- Production of the new generation of engines for the BMW i8 hybrid plug in sports car exclusively being built at BMW Plant Hams Hall.
- Production of the new generation of engines for the BMW i8 hybrid plug in sports car exclusively being built at BMW Plant Hams Hall.
- Production of the new generation of engines for the BMW i8 hybrid plug in sports car exclusively being built at BMW Plant Hams Hall.
- The BMW i8 engine production team at BMW Plant Hams Hall.
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – paint shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – paint shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- New three cylinder engine for BMW i8 built at BMW Plant Hams Hall
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Opening of the new CFRP production unit at BMW Group's Innovation Park Wackersdorf on 31 July 2014. Laying.
- Contract manufacturing of the new MINI at the VDL Nedcar plant in Born, Netherlands – body shop (07/2014)
- Opening of the new CFRP production unit at BMW Group's Innovation Park Wackersdorf on 31 July 2014. Assembling.
- Opening of the new CFRP production unit at BMW Group's Innovation Park Wackersdorf on 31 July 2014. Cutting.
- BMW Group Plant Araquari, production, assembly (10/2014)
- BMW Group Plant Araquari, production, assembly (10/2014)
- BMW Group Plant Araquari, production, assembly (10/2014)
- BMW Group Plant Araquari, production, assembly (10/2014)
- BMW Group Plant Araquari (10/2014)
- BMW Group Plant Araquari, production, assembly (10/2014)
- BMW Group Plant Araquari, production, assembly (10/2014)