<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Slovenija]]></title>
                    <link>https://newsroom.bmwgroup.com/emea/sl/</link>
                    <description></description>
                    <language>sl</language>
                    <lastBuildDate>Sun, 11 Oct 2026 14:57:56 +0200</lastBuildDate>
                    <pubDate>Mon, 02 Feb 2026 16:04:00 +0100</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom Slovenija]]></title>
                        <url>https://content.presspage.com/clients/150_3240.png</url>
                        <link>https://newsroom.bmwgroup.com/emea/sl/</link>
                        <width>144</width>
                    </image><item>
                        <title>Rekordno uspešna tovarna v Regensburgu proizvaja najbolje prodajani model BMW v Sloveniji – BMW X1</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/rekordno-uspesna-tovarna-v-regensburgu-proizvaja-najbolje-prodajani-model-bmw-v-sloveniji---bmw-x1/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/rekordno-uspesna-tovarna-v-regensburgu-proizvaja-najbolje-prodajani-model-bmw-v-sloveniji---bmw-x1/</guid><pp:caseid>810517</pp:caseid><pp:summary><![CDATA[+++ Od regionalnega razvojnega gonilnika do tovarne vozil z največjim obsegom proizvodnje BMW Group v Evropi – rekordna proizvodnja leta 2025: tovarna dosega 40-letni rekord s 356.901 vozili. +++ BMW X1, model z največjo količino proizvedenih vozil v tovarni, je tudi najbolje prodajani model BMW v Sloveniji. +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
<strong>Regensburg/Ljubljana.</strong> Tovarna v Regensburgu je leta
  2025 dosegla nov proizvodni rekord 356.901 vozil, s čimer je postala
  tovarna z največjo količino proizvedenih avtomobilov BMW Group v
  Evropi. Od odprtja tovarne leta 1986 je s proizvodne linije zapeljalo
  8,7 milijona vozil. »S to rekordno proizvodnjo nismo dosegli le novega
  rekorda v 40-letni zgodovini tovarne, temveč smo – tako kot v
  prejšnjem letu – nemškim tovarnam skupine BMW leta 2025 pomagali
  ponovno izdelati več kot milijon vozil,« pravi direktor tovarne Armin
  Ebner, »Tovarna je že 40 let osrednje razvojno središče vzhodne
  bavarske regije.«</p>
<p>BMW Group tovarna v Regensburgu svojo konkurenčnost gradi na stalnih
  izboljšavah učinkovitosti, digitalizaciji in inovacijah. Z uvedbo
  naprednih proizvodnih procesov in umetne inteligence so od leta 2019
  stroške zmanjšali za več kot četrtino, hkrati pa omogočili tudi
  avtonomno premikanje vozil znotraj tovarne.</p>
<p>Več kot 150.000 vozil, izdelanih v Regensburgu leta 2025, je bilo
  elektrificiranih – torej bodisi popolnoma električnih bodisi
  priključnih hibridov. BMW X1 je bil model z največjo količino
  proizvedenih vozil, saj je bilo proizvedenih več kot 266.000 vozil,
  medtem ko je BMW X2 predstavljal več kot 90.000 vozil. Na domačem
  nemškem trgu je ostalo več kot 55.000 vozil. Več kot polovica
  avtomobilov, proizvedenih v Regensburgu leta 2025, je šla strankam v
  druge evropske države. Več kot 100.000 vozil je bilo poslanih v tujino.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/b02577a3-202c-4762-a029-b7cebc5d40e6/P90628648_highRes_vehicle-production-a.jpg"/></span></span></p>
<p>BMW X1 je eden ključnih modelov znamke BMW tudi na slovenskem trgu.
  Leta 2025 je postal najbolje prodajan model, saj je predstavljal kar
  23,8 % vseh prodanih vozil BMW v Sloveniji. Posebej izstopa tudi med
  poslovnimi strankami, kjer je BMW X1 zasedel prvo mesto med najbolje
  prodajanimi modeli. Uspeh pa se odraža tudi na področju električne
  mobilnosti – popolnoma električni BMW iX1 je bil najbolje prodajan
  električni model znamke BMW v Sloveniji in je v letu 2025 predstavljal
  kar 43 % celotne prodaje električnih vozil BMW Slovenija.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/d22ba33d-4648-4c57-be00-16dcb0b7a58a/P90628642_highRes_vehicle-production-a.jpg"/></span></span></p>
<p>Ebner je optimističen glede jubilejnega leta tovarne: »Z našima
  privlačnima modeloma BMW X1 in BMW X2 proizvajamo točno to, kar si
  naše stranke želijo, hkrati pa še naprej delujemo v treh izmenah 24 ur
  na dan.« Vsakih 57 sekund novo vozilo zapelje s tekočega traku. To
  trenutno znaša več kot 1400 vozil na delovni dan, ki jih nato
  dostavijo strankam po vsem svetu. Na eni sami proizvodni liniji se
  fleksibilno izdelujejo različni tipi pogonskih sklopov – od modelov z
  motorji z notranjim izgorevanjem do priključnih hibridov in popolnoma
  električnih vozil.</p>
<p>Ob 40-letnici obstoja ostaja tovarna Regensburg tudi pomemben
  gospodarski steber regije in velik zaposlovalec, saj danes zaposluje
  okoli 9.000 ljudi iz kar 71 držav, med katerimi so tudi Slovenci. Z
  nenehno rastjo proizvodnje, tehnološkim razvojem in usmerjenostjo v
  prihodnost mobilnosti predstavlja enega ključnih proizvodnih obratov
  BMW Group v Nemčiji in v širši Evropi.</p>
<p> </p>
<p>+++</p>
<p>Več informacij o 40-letnici tovarne je na voljo v sporočilu za
  javnost: <a href="https://newsroom.bmwgroup.com/global/en">Tovarna
    BMW Group v Regensburgu praznuje 40. obletnico z rekordno proizvodnjo</a> </p>
<p> </p>
<p>
<sup>BMW iX1 v Sloveniji je fotografirala Ksenija Starič.</sup></p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br/>Tel: +38615867374<br/>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production Plants,BMW,Locations,Regensburg]]></category>
            <pubDate>Mon, 02 Feb 2026 16:04:00 +0100</pubDate>
            <pp:lastModified>Mon, 02 Feb 2026 15:04:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/96a3d929-2d88-42a6-954e-3daa3d9a3c9d/500_P90629347_highRes_bmw-ix1-02-2026.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/96a3d929-2d88-42a6-954e-3daa3d9a3c9d/500_P90629347_highRes_bmw-ix1-02-2026.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/96a3d929-2d88-42a6-954e-3daa3d9a3c9d/P90629347_highRes_bmw-ix1-02-2026.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90629347_highRes_bmw-ix1-02-2026.jpg]]></pp:imageTitle></item><item>
                        <title>Tovarna BMW Group v Regensburgu praznuje 40. obletnico z rekordno proizvodnjo</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/tovarna-bmw-group-v-regensburgu-praznuje-40-obletnico-z-rekordno-proizvodnjo/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/tovarna-bmw-group-v-regensburgu-praznuje-40-obletnico-z-rekordno-proizvodnjo/</guid><pp:caseid>810561</pp:caseid><pp:summary><![CDATA[+++ Od regionalnega razvojnega gonilnika do tovarne vozil z največjim obsegom proizvodnje v Evropi skupine BMW – rekordna proizvodnja leta 2025: tovarna dosega 40-letni rekord s 356.901 vozili +++ +++ 8,7 milijona vozil od začetka proizvodnje leta 1986 +++ +++ Direktor tovarne Armin Ebner: »Nenehna prizadevanja za povečanje konkurenčnosti so ključ do našega uspeha« +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
<sup>Več informacij na voljo spodaj in v priponki v angleščini.</sup></p>
<p>
<strong>Regensburg. </strong>Plant Regensburg achieved a new
  production record of 356,901 vehicles in 2025, making it the BMW
  Group’s highest-volume car plant in Europe. Since the plant opened in
  1986, 8.7 million vehicles have rolled off its production line. “With
  this record production, we not only reached a new all-time high in the
  plant’s 40-year history but also – as in the previous year – helped
  the BMW Group’s German plants build more than one million vehicles
  again in 2025,” says Plant Director Armin Ebner. “For 40 years, the
  plant has been a central development powerhouse for the eastern
  Bavarian region.”</p>
<p>
<strong>Continuous efforts to increase competitiveness as key success factor </strong></p>
<p>“Continuous and consistent efforts to increase our competitiveness
  remain the key to our success. Every single day in Regensburg, we
  demonstrate that competitive production is possible in Germany,” adds
  Ebner. By implementing efficiency measures within its production
  system, BMW Group Plant Regensburg has lowered costs by more than a
  quarter since 2019.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/cacb7a78-4047-4001-9f45-f45fcce4123f/P90628651_highRes_vehicle-production-a.jpg"/></span></span></p>
<p>“Digitalisation is an important lever for this,” says Ebner. Examples
  include the use of artificial intelligence in automated surface
  processing in the paint shop and for quality controls during vehicle
  assembly, or a cloud-based traffic control system for supplying parts.
  Since early 2025, new vehicles have also been able to navigate
  autonomously, without a driver, from the assembly line to the loading area.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/88b02bda-dcb7-49a0-b3f6-a5fe03b9e65e/P90602513_highRes_armin-ebner-leiter-d.jpg"/></span></span></p>
<p>
<strong>More than 150,000 electrified models in 2025</strong></p>
<p>More than 150,000 of the vehicles manufactured in Regensburg in 2025
  were electrified – that is, either fully-electric vehicles or plug-in
  hybrids. The BMW X1 was the highest-volume model, with over 266,000
  vehicles produced, while the BMW X2 accounted for more than 90,000 vehicles.</p>
<p>Over 55,000 vehicles remained in the company’s domestic market of
  Germany. More than half of the cars produced in Regensburg in 2025
  went to customers in other European countries. More than 100,000
  vehicles were shipped overseas.</p>
<p>Ebner is optimistic about the plant’s anniversary year: “With our
  attractive BMW X1 and BMW X2 models, we are producing exactly what our
  customers want, while continuing to operate three shifts around the
  clock.” Every 57 seconds, a new vehicle rolls off the assembly line.
  This currently adds up to more than 1,400 vehicles per workday, which
  are then delivered to customers around the world. Different types of
  drive train are flexibly manufactured on a single production line –
  from models with internal combustion engines to plug-in hybrids and
  fully-electric vehicles.</p>
<p>
<strong>BMW Group Plant Regensburg – powering jobs across the region</strong></p>
<p>As part of the settlement agreement with the City of Regensburg in
  the 1980s, BMW pledged to produce 400 vehicles per day and create
  3,500 jobs. With the ramp-up and expansion of the plant in subsequent
  years, both employee numbers and production capacity increased: In
  1991, the plant exceeded the 100,000-vehicle threshold for the first
  time, with around 128,000 cars manufactured. By 1999, it was building
  about 750 vehicles daily and more than 200,000 annually. In 2005,
  annual production surpassed 300,000 vehicles for the first time – with
  a daily output of around 1,000 units. Having assembled its
  one-millionth vehicle back in 1995, Plant Regensburg is set to produce
  its nine-millionth vehicle this year.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/cb1ba95a-43a1-4f72-94c6-9d9f31b92dc9/P90628657_highRes_vehicle-production-a.jpg"/></span></span></p>
<p>Employee numbers have also continued to climb: In 1988, the plant
  employed around 3,300 people. By 1991, that number had risen to about
  7,300. Today, the BMW Group’s core staff at its Regensburg and
  Wackersdorf locations in eastern Bavaria comprises around 9,000
  employees, including approximately 380 apprentices.</p>
<p>This makes the plant a significant economic factor and employer
  across the region. Ebner: “Our employees’ commitment, their innovation
  mindset and their forward-looking decisions have shaped BMW Group
  Plant Regensburg into what it is today: a driving force and economic
  engine for the entire region.”<strong>
<br clear="all"/></strong></p>
<p>
<strong>40 years of BMW Group Plant Regensburg – overview of milestones:<br/>
<br/></strong></p>
<p>
<strong>1983      </strong>Decision, contract signing for
  establishment of Regensburg site</p>
<p>
<strong>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/32204713-fd44-4525-a6f8-4386483d9bdd/P90628681_highRes_signing-of-the-contr.jpg"/></span></span></strong></p>
<p>
<strong>1984      </strong>Groundbreaking with Minister-President
  Franz-Josef Strauß; <br/>              construction of production
  halls begins<br/>
<strong>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/5cb4d8b7-8d74-429c-86f8-0e14e237f3df/P90628682_highRes_laying-of-the-founda.jpg"/></span></span></strong></p>
<p>
<strong>1985</strong>     Topping-out ceremony</p>
<p>
<strong>1986     </strong>Start of production for BMW 3 Series (E30);
  around 1,300 employees</p>
<p>
<strong>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/e4a5d929-267c-4733-8fb8-887f17e72d35/P90628684_highRes_40-years-of-bmw-grou.jpg"/></span></span></strong></p>
<p>
<strong>1987      </strong>Paint shop commissioned;<br/>first
  networked computers in assembly usher in the computer age</p>
<p>
<strong>1988</strong>     Around 3,300 employees</p>
<p>
<strong>1990      </strong>Body shop commissioned</p>
<p>
<strong>1991      </strong>Annual production: around 128,000 vehicles,
  surpassing the 100,000 mark;<br/>around 7,300 employees</p>
<p>
<strong>1995      </strong>Production milestone: 1,000,000 vehicles
  manufactured in Regensburg</p>
<p>
<strong>1997      </strong>Press shop completed</p>
<p>
<strong>1999      </strong>Annual production exceeds 200,000 vehicles
  for the first time; <br/>              more than 8,700 employees</p>
<p>
<strong>2001      </strong>Groundbreaking for plant expansion: paint
  shop and body shop</p>
<p>
<strong>2005      </strong>Annual production exceeds 300,000 vehicles
  for the first time</p>
<p>
<strong>2007      </strong>Groundbreaking for press shop expansion</p>
<p>
<strong>2010      </strong>Assembly/finish refurbishment</p>
<p>
<strong>2013      </strong>New press system commissioned</p>
<p>
<strong>2014      </strong>Completion of automated small parts warehouse</p>
<p>
<strong>2015      </strong>EFQM Excellence Award; BMW X1 series launch</p>
<p>
<strong>2017      </strong>West expansion of assembly commissioned</p>
<p>
<strong>2018 </strong>    Start of BMW X2 series production</p>
<p>
<strong>2025      </strong>Additional body shop commissioned in Neutraubling</p>
<p>
<strong>2026      </strong>Around 9,000 employees, including approx.
  380 apprentices</p>
<p> </p>
<p>
<strong>40 years of BMW Group Plant Regensburg – vehicle models produced:</strong></p>
<p>
<strong>  <span>
<span style=""><img src="https://content.presspage.com/uploads/3240/103f1e43-24de-4f5c-8470-1f17f9dade9c/P90628683_highRes_40-years-of-bmw-grou.jpg"/></span></span></strong>
<strong>
<br/></strong></p>
<table border="1" cellpadding="0" cellspacing="0" style="width: 100.0%;">

<tr>
<td style="width: 134.45pt;" valign="top"><p>
<strong>Model</strong></p></td><td style="width: 36.3pt;" valign="top"><p>
<strong>Type</strong></p></td><td style="width: 126.5pt;" valign="top"><p>
<strong>Production period:</strong></p></td><td style="width: 100.6pt;" valign="top"><p>
<strong>Number of units</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 1 Series 5-Door</p></td><td style="width: 36.3pt;"><p>E87</p></td><td style="width: 126.5pt;"><p>2003 – 2011</p></td><td style="width: 100.6pt;"><p>908,144</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 1 Series 5-Door</p></td><td style="width: 36.3pt;"><p>F20</p></td><td style="width: 126.5pt;"><p>2010 – 2019</p></td><td style="width: 100.6pt;"><p>818,530</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 1 Series 3-Door</p></td><td style="width: 36.3pt;"><p>F21</p></td><td style="width: 126.5pt;"><p>2010 – 2019</p></td><td style="width: 100.6pt;"><p>128,070</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 1 Series 5-Door</p></td><td style="width: 36.3pt;"><p>F40</p></td><td style="width: 126.5pt;"><p>2018 – 2023</p></td><td style="width: 100.6pt;"><p>83,160</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total BMW 1 Series  </strong></p></td><td style="width: 100.6pt;"><p>
<strong>1,937,904</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E30</p></td><td style="width: 126.5pt;"><p>1986 – 1993</p></td><td style="width: 100.6pt;"><p>310,590</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E36</p></td><td style="width: 126.5pt;"><p>1990 – 1999</p></td><td style="width: 100.6pt;"><p>1,187,502</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E46</p></td><td style="width: 126.5pt;"><p>1997 – 2006</p></td><td style="width: 100.6pt;"><p>1,488,660</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>E90</p></td><td style="width: 126.5pt;"><p>2004 – 2012</p></td><td style="width: 100.6pt;"><p>243,240</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series Coupé</p></td><td style="width: 36.3pt;"><p>E92</p></td><td style="width: 126.5pt;"><p>2005 – 2013</p></td><td style="width: 100.6pt;"><p>380,698</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series
        Convertible</p></td><td style="width: 36.3pt;"><p>E93</p></td><td style="width: 126.5pt;"><p>2005 – 2013</p></td><td style="width: 100.6pt;"><p>254,051</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 3 Series Sedan</p></td><td style="width: 36.3pt;"><p>F30</p></td><td style="width: 126.5pt;"><p>2011 – 2018</p></td><td style="width: 100.6pt;"><p>278,853</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW M3</p></td><td style="width: 36.3pt;"><p>F80</p></td><td style="width: 126.5pt;"><p>2012 – 2018</p></td><td style="width: 100.6pt;"><p>34,677</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total BMW 3 Series </strong></p></td><td style="width: 100.6pt;"><p>
<strong>4,178,271</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW Z4</p></td><td style="width: 36.3pt;"><p>E89</p></td><td style="width: 126.5pt;"><p>2008 – 2016</p></td><td style="width: 100.6pt;"><p>116,163</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total BMW Z4 </strong></p></td><td style="width: 100.6pt;"><p>
<strong>116,163</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 2 Series</p></td><td style="width: 36.3pt;"><p>F46</p></td><td style="width: 126.5pt;"><p>2014 – 2023</p></td><td style="width: 100.6pt;"><p>209,883</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total BMW 2 Series </strong> </p></td><td style="width: 100.6pt;"><p>
<strong>209,883</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 4 Series
        Convertible</p></td><td style="width: 36.3pt;"><p>F33</p></td><td style="width: 126.5pt;"><p>2013 – 2020</p></td><td style="width: 100.6pt;"><p>158,587</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW 4 Series
        Convertible</p></td><td style="width: 36.3pt;"><p>F83</p></td><td style="width: 126.5pt;"><p>2013 – 2020</p></td><td style="width: 100.6pt;"><p>19,869</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total BMW 4 Series  </strong></p></td><td style="width: 100.6pt;"><p>
<strong>178,456</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW X2</p></td><td style="width: 36.3pt;"><p>F39</p></td><td style="width: 126.5pt;"><p>2016 – 2023</p></td><td style="width: 100.6pt;"><p>307,555</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW X2</p></td><td style="width: 36.3pt;"><p>U10</p></td><td style="width: 126.5pt;"><p>since 2021</p></td><td style="width: 100.6pt;"><p>184,612</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total BMW X2  </strong></p></td><td style="width: 100.6pt;"><p>
<strong>492,167</strong></p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW X1</p></td><td style="width: 36.3pt;" valign="top"><p>F48</p></td><td style="width: 126.5pt;" valign="top"><p>2014 – 2022</p></td><td style="width: 100.6pt;" valign="top"><p>851,471</p></td></tr>
<tr>
<td style="width: 134.45pt;"><p>BMW X1</p></td><td style="width: 36.3pt;" valign="top"><p>U11</p></td><td style="width: 126.5pt;" valign="top"><p>since 2022</p></td><td style="width: 100.6pt;" valign="top"><p>770,131</p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;" valign="top"><p>
<strong>Total BMW X1  </strong></p></td><td style="width: 100.6pt;" valign="top"><p>
<strong>1,621,602</strong></p></td></tr>
<tr>
<td colspan="3" style="width: 297.25pt;"><p>
<strong>Total number of vehicles* </strong></p></td><td style="width: 100.6pt;"><p>
<strong>8,734,446</strong></p></td></tr></table>
<p>*Updated: Dec. 2025</p>
<p> </p>
<p>
<strong> </strong>
<strong> </strong></p>
<p>
<strong>BMW Group Corporate Communications<br/></strong>Saskia
  Graser, head of Communications Regensburg and Wackersdorf +49 151 6060
  2014, Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a></p>
<p>Media website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a></p>
<p>Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a></p>
<p> </p>
<p>
<strong>BMW Group Plants Regensburg and Wackersdorf<br/></strong>
<strong>BMW Group Plant Regensburg</strong> has been in operation for
  more than four decades. After construction of the production halls was
  completed in 1984, series production of the BMW 3 Series (E30) began
  in autumn 1986. As part of the settlement agreement with the City of
  Regensburg, BMW pledged at that time to produce 400 vehicles per day
  and create 3,500 jobs.</p>
<p>Today, Plant Regensburg is one of more than 30 BMW Group production
  locations worldwide. More than 1,400 BMW X1 and BMW X2 model vehicles
  roll off the assembly line each day, destined for customers around the
  globe. Different types of drive train are flexibly manufactured on a
  single production line – from models with internal combustion engines
  to plug-in hybrids and fully-electric vehicles.</p>
<p>Within the framework of the BMW iFACTORY, the BMW Group is also
  setting standards at its Regensburg location in the fields of
  digitalisation, circularity and competitiveness – as confirmed by
  recent awards. For example, in 2025, the plant was named “FACTORY OF
  THE YEAR” in the category “Excellent Large-Series Assembly”. In
  addition, the BMW X1 from Regensburg was once again voted Best in
  Class in “Best Cars 2025”. It is already possible to experience, in
  virtual form, what the factory will look like in the coming years.
  Production of the “Neue Klasse” – BMW’s next model generation – is set
  to ramp up in Regensburg in the second half of this decade.</p>
<p>
<strong>BMW Group Plant Wackersdorf</strong> is home to cockpit
  production and parts supply for overseas plants, and also serves as
  the door and flap production centre for Rolls-Royce. With its battery
  testing centre, the site also makes a significant contribution to electromobility.</p>
<p>The BMW Group's core staff at its Regensburg and Wackersdorf
  locations in eastern Bavaria comprises around 9,000 employees,
  including approximately 380 apprentices.</p>
<p>
<a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br/>Tel: +38615867374<br/>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production,Research &amp; Development,Production Plants,Corporate Heritage,Heritage,Locations,Regensburg,Wackersdorf]]></category>
            <pubDate>Mon, 02 Feb 2026 15:22:00 +0100</pubDate>
            <pp:lastModified>Mon, 02 Feb 2026 14:22:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/3f8f1121-3f49-4650-9f07-8aecc11bfc8b/500_P90628664_highRes_vehicle-production-a.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/3f8f1121-3f49-4650-9f07-8aecc11bfc8b/500_P90628664_highRes_vehicle-production-a.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/3f8f1121-3f49-4650-9f07-8aecc11bfc8b/P90628664_highRes_vehicle-production-a.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90628664_highRes_vehicle-production-a.jpg]]></pp:imageTitle></item><item>
                        <title>Tovarna BMW Group Regensburg pilotira sistem uporabe termičnega olja za proizvodnjo toplote</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/tovarna-bmw-group-regensburg-pilotira-sistem-uporabe-termicnega-olja-za-proizvodnjo-toplote/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/tovarna-bmw-group-regensburg-pilotira-sistem-uporabe-termicnega-olja-za-proizvodnjo-toplote/</guid><pp:caseid>810551</pp:caseid><pp:summary><![CDATA[+++ Možen hitrejši in učinkovitejši prehod z zemeljskega plina na alternativne vire energije +++ Pilotni projekt bo letno prihranil približno 480 ton CO2e +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <sup>Dodatne informacije na voljo spodaj in v priponki v angleščini. </sup></p>
<p>
  <strong>+++ Faster, more efficient transition from gas to alternative
    energy sources possible +++ Pilot project will save around 480 tons
    of CO2e per year +++</strong></p>
<p>
  <strong>Regensburg. </strong>As it transitions from natural gas to
  renewable energy, the BMW Group is gradually electrifying its paint
  shops as part of its efforts to decarbonise vehicle production. A
  recently concluded pilot project at Plant Regensburg demonstrates how
  this transition can be simplified and accelerated. The key lies in the
  installation of a thermal oil system. Using thermal oil as a heat
  transfer medium enables heat generation to be decoupled from the rest
  of the system’s components. This allows the energy supply to the
  coating lines to be adapted flexibly at any time.</p>
<p>“One advantage of switching to thermal oil is the flexibility to
  choose the energy source for heat generation in our paint shops. For
  example, thermal oil can be heated using electricity, geothermal
  energy, solar thermal energy – or even a hydrogen-powered heating
  system. The ability to change fuels quickly at any time makes our
  paint shops more resilient. If an energy source becomes scarce or
  unavailable, we can respond at short notice,” explains Samuel Flieger,
  project manager for technical planning in the Regensburg paint shop.</p>
<p>This means paint shops can already be set up to run on renewable
  energy – even if gas-free heating is not yet an option. The power grid
  is not currently equipped at all locations to handle the high energy
  demands of a fully electrified paint shop, largely due to its
  extremely energy-intensive drying processes. A thermal oil-based
  system can also be operated with gas as an interim solution.</p>
<p>
  <strong>Testing successfully concluded in Regensburg</strong></p>
<p>The Regensburg pilot project team took advantage of the production
  downtime over the New Year period to install the thermal oil
  technology. Within just a few days, they replaced the gas-powered
  drying equipment used for one of the three top coat lines with an
  electrically heated thermal oil system – complete with an innovative
  electric-powered eRTO exhaust air unit.</p>
<p>The key innovation lies in using the new electric heating unit to
  transfer heat to the thermal oil, instead of directly heating the air
  around the car bodies in the drying chamber after paint application.
  The heated oil circulates in a closed loop and, in a second step,
  heats the air in the drying chamber via heat exchangers. The
  circulating thermal oil reaches temperatures of several hundred
  degrees Celsius. Unlike water, it remains stable even at these high temperatures.</p>
<p>
  <strong>Retrofitting boosts energy efficiency</strong></p>
<p>Wherever waste heat is generated, it is recovered and reused as
  process heat. This reduces the temperature of the exhaust air released
  through the hall's roof. As a result of these retrofitting measures,
  the drying equipment’s total energy consumption has been reduced by
  approximately 40 percent. Switching to thermal oil heating, combined
  with the system's improved energy efficiency, will reduce the carbon
  footprint of BMW Group Plant Regensburg’s paint shop by approximately
  480 tons of CO<sub>2</sub>e per year.</p>
<p>
  <strong> </strong></p>
<p>
  <strong>If you have any questions, please contact:<br />
    <br /></strong>Christian Dürrschmidt, Communications
  Regensburg<br />Cell phone: +49 151 6060 5194, <br />Email: <a href="mailto:Christian.Duerrschmidt@bmw.de">Christian.Duerrschmidt@bmw.de</a><br /> <br />Saskia
  Graser, head of Communications Regensburg and Wackersdorf<br />Cell
  phone: +49 151 6060 2014, <br />Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a><br /> <br />Media
    website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a><br />Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a></p>
<p> </p>
<p>
  <strong>BMW Group Plants Regensburg and
  Wackersdorf<br /></strong> <br />The BMW Group vehicle plant in
  Regensburg has been in operation since 1986 and is one of more than 30
  BMW Group production locations worldwide. Every workday, around 1,400
  vehicles of the BMW X1 and BMW X2 models roll off the production line
  at Plant Regensburg, destined for customers around the globe.
  Different types of drive trains are flexibly manufactured on a single
  production line – ranging from vehicles with internal combustion
  engines to plug-in hybrids and fully-electric models.</p>
<p>BMW Group Plant Regensburg was recognised as “FACTORY OF THE YEAR”
  2024 in the category “excellent large-series assembly” of the
  prestigious industrial competition. As it implements the so-called BMW
  iFACTORY, the BMW Group is focused on digitalisation of the Regensburg
  plant site to create a digital and intelligently connected factory. It
  is already possible to experience in virtual form what the factory
  will look like a few years from now. Production of models for the NEUE
  KLASSE, BMW’s next generation of vehicles, will ramp up in Regensburg
  in the second half of the decade.</p>
<p>The BMW Group plant in Wackersdorf is home to cockpit production and
  parts supply for overseas plants. With the opening of a new battery
  testing centre and commissioning of the first phase in autumn 2024,
  the location also makes a significant contribution to electromobility.
  An entirely new area of expertise is the door and flap centre for Rolls-Royce.</p>
<p>The BMW Group core staff at the Regensburg and Wackersdorf locations
  in eastern Bavaria consists of around 9,250 employees, including about
  350 apprentices.</p>
<p>
  <a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br>Tel: +38615867374<br>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production,Research &amp; Development,Locations,Sustainability,Regensburg,Wackersdorf]]></category>
            <pubDate>Tue, 05 Aug 2025 14:20:00 +0200</pubDate>
            <pp:lastModified>Tue, 05 Aug 2025 12:20:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/201b5c28-6f57-4d78-a4eb-d1d390e36f79/500_P90596466_highRes_flexible-use-of-ener.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/201b5c28-6f57-4d78-a4eb-d1d390e36f79/500_P90596466_highRes_flexible-use-of-ener.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/201b5c28-6f57-4d78-a4eb-d1d390e36f79/P90596466_highRes_flexible-use-of-ener.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90596466_highRes_flexible-use-of-ener.jpg]]></pp:imageTitle></item><item>
                        <title>Tovarna BMW Group v Regensburgu vzpostavi logistični vozni park na vodikov pogon</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/tovarna-bmw-group-v-regensburgu-vzpostavi-logisticni-vozni-park-na-vodikov-pogon/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/tovarna-bmw-group-v-regensburgu-vzpostavi-logisticni-vozni-park-na-vodikov-pogon/</guid><pp:caseid>810346</pp:caseid><pp:summary><![CDATA[+++ Uporaba vodika v intralogistiki - komponente se na vsa proizvodna območja dostavlja z vlačilci in viličarji na vodikov pogon +++ Postopen prehod z električnega na vodikov pogon do leta 2030 +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <sup>Dodatne informacije so na voljo spodaj in v priponki v angleščini.</sup></p>
<p>
  <strong>+++ Use of hydrogen in intralogistics – components delivered
    to all production areas by hydrogen-powered tugger trains and
    forklift trucks +++ Gradual transition from electric to hydrogen
    propulsion by 2030 +++</strong></p>
<p>
  <strong>Regensburg. </strong>BMW Group Plant Regensburg plans to
  utilise hydrogen for its production logistics going forward. Starting
  in 2026, hydrogen-powered tugger trains and forklift trucks will be
  deployed for all transport and logistics tasks. This includes
  operations in the press shop, body shop and assembly, ensuring that
  the necessary components and individual parts are delivered to the
  correct locations for installation.<br />
  <br />The project aims to capitalise on the benefits of hydrogen
  propulsion. “The gradual transition from electric to hydrogen
  propulsion brings us another step closer to the BMW iFACTORY, our
  digital and sustainable factory of the future,” says Armin Ebner, head
  of BMW Group Plant Regensburg.<br />
  <br />“Switching production logistics from electricity to hydrogen
  will diversify our plant’s energy mix – while optimising logistics
  processes and saving valuable space,” explains Project Manager
  Katharina Radtke. “The advantage of hydrogen is that refuelling is
  very fast – just like with conventional fuels. The filling stations
  required for this will be installed directly within the different
  production areas and do not take up much space.”<br />
  <br />The entire logistics fleet at the Regensburg plant is currently
  being equipped with electric drive trains. The batteries used in the
  industrial trucks need to be changed twice per shift. Battery
  replacement, which is performed manually using a crane, takes about 15
  minutes and requires space.<br />
  <br />To ensure the wide-scale supply of hydrogen in the future, BMW
  Group plant Regensburg will install a two-kilometre-long pipeline
  network, with six decentralised filling stations, between now and
  early 2026. These stations will supply the logistics fleet in the
  various production areas with hydrogen, delivered in special trailers
  that can also be used for interim storage. “Once the conversion is
  completed, our annual hydrogen consumption will be around 150 tonnes,”
  says Radtke.<br />
  <br />The logistics fleet at BMW Group Plant Regensburg currently
  comprises about 230 tugger train haulers and forklift trucks. The
  transition will be completed in stages by 2030.<br />
  <br />
  <br />
  <strong>BMW Group Corporate Communications<br />
    <br /></strong>Christian Dürrschmidt, Communications
  Regensburg<br />Cell phone: +49 151 6060 5194<br />Email: <a href="mailto:Christian.Duerrschmidt@bmw.de">Christian.Duerrschmidt@bmw.de</a><br />
  <br />Saskia Graser, head of Communications Regensburg and
  Wackersdorf<br />Cell phone: +49 151 6060 2014<br />Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a><br />
  <br />Media website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a></p>
<p>Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a><br />
  <br />
  <br />
  <strong>BMW Group Plants Regensburg and Wackersdorf<br />
    <br /></strong>The BMW Group has viewed itself for decades as the
  benchmark for production technology and operational excellence in
  vehicle construction – including at its locations in Regensburg and
  Wackersdorf. The BMW Group vehicle plant in Regensburg has been in
  operation since 1986 and is one of more than 30 BMW Group production
  locations worldwide. A total of up to 1,400 vehicles of the BMW X1 and
  BMW X2 models come off the production line at Plant Regensburg every
  workday – destined for customers all over the world. Different types
  of drive trains are flexibly manufactured on a single production line
  – from vehicles with internal combustion engines to plug-in hybrids,
  to fully-electric models.<br />
  <br />High-voltage batteries for the electric models built in
  Regensburg are also produced locally, in direct proximity to the
  vehicle plant. They are assembled at the electric component production
  facility, which opened in 2021 at the Leibnizstrasse location.<br />
  <br />BMW Innovation Park Wackersdorf also belongs to the Regensburg
  site. The 55-hectare campus built in the 1980s was originally intended
  as a nuclear reprocessing facility. The BMW Group has located its
  cockpit production there, as well as its parts supply for overseas
  plants. In addition to BMW as the largest employer, several other
  companies are also based at Innovation Park Wackersdorf. A total of
  around 2,500 employees work there.<br />The BMW Group core staff at
  the Regensburg and Wackersdorf locations in eastern Bavaria is made up
  of around 9,250 employees, including more than 300 apprentices.<br />
  <br />
  <br />
  <a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br>Tel: +38615867374<br>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production,Research &amp; Development,Production Plants,Locations,Sustainability,Technology,Regensburg,Logistics]]></category>
            <pubDate>Mon, 25 Nov 2024 10:00:00 +0100</pubDate>
            <pp:lastModified>Mon, 25 Nov 2024 09:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/209c0a92-4881-485f-9e08-363373e6c2d6/500_P90581173_highRes_bmw-group-plant-rege.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/209c0a92-4881-485f-9e08-363373e6c2d6/500_P90581173_highRes_bmw-group-plant-rege.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/209c0a92-4881-485f-9e08-363373e6c2d6/P90581173_highRes_bmw-group-plant-rege.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90581173_highRes_bmw-group-plant-rege.jpg]]></pp:imageTitle></item><item>
                        <title>Zelena luč za center za testiranje baterij Wackersdorf – prva faza je zaživela</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/zelena-luc-za-center-za-testiranje-baterij-wackersdorf---prva-faza-je-zazivela/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/zelena-luc-za-center-za-testiranje-baterij-wackersdorf---prva-faza-je-zazivela/</guid><pp:caseid>810465</pp:caseid><pp:summary><![CDATA[+++ Naložba v višini več kot 100 milijonov evrov v tovarno BMW Group Wackersdorf – obrat v regiji Zgornja Pfalška postane ključni dejavnik za elektromobilnost +++]]></pp:summary><description><![CDATA[<div class="imported-article"><div> </div>
<div>
  <div>
    <p>
      <sup>Dodatne informacije so na voljo spodaj in v priponki v angleščini.</sup></p>
    <p>
      <strong>Wackersdorf. </strong>One year ago, the BMW Group
      announced plans to build a new battery testing centre at the
      Wackersdorf location. Now, the initial phase has come on-stream as
      planned. Scheduled for completion in late 2025, the site, which
      spans over 8,000 square metres, will rigorously test individual
      battery cells, complete high-voltage batteries and other electric
      powertrain components for future BMW Group models early in
      development, well before they go into production.</p></div></div>
<p>The investment of around 100 million euros has primarily focused on
  complex test-bench technology and the upgrades to the building's
  existing infrastructure required for operation. Hall 80, located on
  the grounds of the Wackersdorf plant, has been remodelled for this
  purpose: Originally constructed in the 1980s for a planned
  reprocessing facility, the building has quite a history.</p>
<p>In recent months, structural work for the new battery testing centre
  has been in progress, including installation of a new floor slab. A
  total of 2,200 tonnes of structural steel and 10,000 cubic metres of
  concrete were used in the expansion.</p>
<p>The commissioning of the initial section means that the so-called
  “battery testers” will be operating around the clock to test battery
  cells during the early phase of development. Essentially, the
  electrical performance of individual battery cells is determined
  during charging and discharging under different conditions. This
  allows use cases that will be relevant for customers later to be
  simulated, long before a vehicle under development drives on the road. </p>
<p>“Parallel testing of several hundred battery cells will initially be
  possible. Once the ramp-up is complete, testing capacity will reach
  several thousand battery cells,” explains Project Manager Dr Felix
  Schmidt-Stein. In the final phase from 2025 onwards, the testing
  centre will also be used to validate the BMW Group’s battery-electric
  vehicles prior to the official launch of series production and ensure
  the required premium quality. “For example, this includes subjecting
  the batteries to vibration and shock tests,” adds Schmidt-Stein. “We
  can also simulate complex driving patterns in endurance tests,
  including charging and discharging cycles. Tests like these are
  essential for type approval of electric vehicles.” </p>
<p>“Commissioning of the first phase of the new battery testing centre
  means that the BMW Group's Wackersdorf location is poised to become a
  major facilitator in the transformation towards electromobility,”
  confirms Site Manager Christoph Peters. “The new battery testing
  centre gives our site a broader foundation. We are now adding a fourth
  pillar in Wackersdorf – in addition to supplying our overseas plants,
  cockpit production and door production for Rolls-Royce models. This
  represents a strong commitment to the future of the site.” <br />
  <strong>BMW Group Corporate Communications</strong></p>
<p>Saskia Graser, head of Communications Regensburg and
  Wackersdorf<br />Cell phone: +49 151 6060 2014, Email: Saskia.Graser@bmw.de </p>
<p>Media website: <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a> <br />Email: presse@bmw.de </p>
<p>
  <strong>BMW Group Plants Regensburg and Wackersdorf</strong></p>
<p>The BMW Group has viewed itself for decades as the benchmark for
  production technology and operational excellence in vehicle
  construction – including at its locations in Regensburg and
  Wackersdorf. <br />The BMW Group vehicle plant in Regensburg has been
  in operation since 1986 and is one of more than 30 BMW Group
  production locations worldwide. A total of up to 1,400 vehicles of the
  BMW X1 and BMW X2 models come off the production line at Plant
  Regensburg every workday – destined for customers all over the world.
  Different types of drive trains are flexibly manufactured on a single
  production line – from vehicles with internal combustion engines to
  plug-in hybrids, to fully-electric models. </p>
<p>High-voltage batteries for the electric models built in Regensburg
  are also produced locally, in direct proximity to the vehicle plant.
  They are assembled at the electric component production facility,
  which opened in 2021 at the Leibnizstrasse location.</p>
<p>BMW Innovation Park Wackersdorf also belongs to the Regensburg site.
  The 55-hectare campus built in the 1980s was originally intended as a
  nuclear reprocessing facility. The BMW Group has located its cockpit
  production there, as well as its parts supply for overseas plants. In
  addition to BMW as the largest employer, several other companies are
  also based at Innovation Park Wackersdorf. A total of around 2,500
  employees work there. <br />The BMW Group core staff at the Regensburg
  and Wackersdorf locations in eastern Bavaria is made up of around
  9,250 employees, including more than 300 apprentices.</p>
<p>
  <a href="https://pressclub.bmwgroup.net/pressclub/ssob/cp/www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a> </p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br>Tel: +38615867374<br>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production,Research &amp; Development,Locations,Drive Technologies,Regensburg,Wackersdorf]]></category>
            <pubDate>Tue, 19 Nov 2024 08:00:00 +0100</pubDate>
            <pp:lastModified>Tue, 19 Nov 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/c716bc2b-8097-406a-965d-4a39f8b001dc/500_P90577255_highRes_bmw-group-plant-wack.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/c716bc2b-8097-406a-965d-4a39f8b001dc/500_P90577255_highRes_bmw-group-plant-wack.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/c716bc2b-8097-406a-965d-4a39f8b001dc/P90577255_highRes_bmw-group-plant-wack.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90577255_highRes_bmw-group-plant-wack.jpg]]></pp:imageTitle></item><item>
                        <title>PV električna energija neposredno iz strehe tovarn.</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/pv-elektricna-energija-neposredno-iz-strehe-tovarn/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/pv-elektricna-energija-neposredno-iz-strehe-tovarn/</guid><pp:caseid>810496</pp:caseid><pp:summary><![CDATA[+++ Tovarni BMW Group v Dingolfingu in Regensburgu bosta od leta 2025 pridobivali električno energijo iz fotovoltaičnih sistemov na strehah tovarn +++ Skupna zmogljivost 14 MWp +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <sup>Dodatne informacije so na voljo spodaj in v priponki v angleščini</sup>.</p>
<p>
  <strong>Dingolfing/Regensburg.</strong> BMW Group Plants Dingolfing
  and Regensburg will obtain electricity generated from renewable energy
  directly from their own roofs. Dingolfing’s rooftop PV system, with a
  capacity of 11.1 MWp, will be one of the most powerful in Germany. To
  achieve this objective, the premium automotive manufacturer is renting
  roof space at its two plant sites in Eastern Bavaria to Sunrock
  Holding Deutschland GmbH, which will generate electricity using
  photovoltaics and make it available to the plants under direct supply
  contracts from 2025 onwards.</p>
<p>Nicole Haft-Zboril, head of BMW Group Real Estate Management,
  underlined that: “With this project, we are not only creating one of
  Germany's biggest rooftop photovoltaic systems – we are also promoting
  the generation of renewable energy directly on site at BMW Group plant locations.”</p>
<p>In Dingolfing, photovoltaic modules cover more than 100,000 square
  metres of hall roof space, with an additional area of over 25,000
  square metres installed in Regensburg. Together, the systems are
  designed to achieve an output of 14 MWp. The annual renewable
  electricity output is estimated at 11.3 GWh for Dingolfing and 2.9 GWh
  for Regensburg, which corresponds to the annual electricity needs of
  several thousand single-family homes.</p>
<p>Georg Brenninkmeijer, managing director of Sunrock Germany, said: “It
  is such an honour for us to collaborate with a renowned automotive
  company like BMW. In a sector with high energy demands, like many
  other industries, it is crucial to develop localised solutions to
  ensure a sustainable energy supply. We are delighted to start
  installing the PV systems in Dingolfing and Regensburg soon, which
  will supply the two BMW Group plants with locally produced green solar
  power in the future.”</p>
<p>The planned photovoltaic systems are scheduled to be commissioned and
  start supplying electricity in Regensburg as early as spring 2025,
  with Dingolfing targeting autumn of next year. Work will get underway
  at both locations in the coming months. In Dingolfing, the modules
  will be installed on the roof of one of the central aftersales
  logistics halls – the Plant 02.70 “Dynamics Centre” – while Regensburg
  will utilise the roof area of one of its logistics halls.</p>
<p>
  <strong> </strong></p>
<p> </p>
<p>If you have any questions, please contact:</p>
<p>Julian Friedrich, BMW Group Plant Dingolfing, head of Communications</p>
<p>Telephone: +49 8731 76 22020, Email: Julian.Friedrich@bmw.de</p>
<p> </p>
<p>Saskia Graser, BMW Group Plant Regensburg, head of Communications</p>
<p>Telephone: +49 941 770 2014, Email: Saskia.Graser@bmw.de</p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br>Tel: +38615867374<br>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production Plants,Locations,Sustainability,Environment,Dingolfing,Regensburg]]></category>
            <pubDate>Mon, 21 Oct 2024 10:00:00 +0200</pubDate>
            <pp:lastModified>Mon, 21 Oct 2024 08:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/1e2f02f4-8086-4fc2-95ad-035c01024663/500_P90574024_highRes_photovoltaic-roof-at.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/1e2f02f4-8086-4fc2-95ad-035c01024663/500_P90574024_highRes_photovoltaic-roof-at.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/1e2f02f4-8086-4fc2-95ad-035c01024663/P90574024_highRes_photovoltaic-roof-at.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90574024_highRes_photovoltaic-roof-at.jpg]]></pp:imageTitle></item><item>
                        <title>Inovativna „3D simulacija človeka“: Tovarna BMW Group v Regensburgu načrtuje montažne postopke nekaj let pred začetkom serijske proizvodnje NEUE KLASSE.</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/inovativna-3d-simulacija-cloveka-tovarna-bmw-group-v-regensburgu-nacrtuje-montazne-postopke-nekaj-let-pred-zacetkom-serijske-proizvodnje-neue-klasse/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/inovativna-3d-simulacija-cloveka-tovarna-bmw-group-v-regensburgu-nacrtuje-montazne-postopke-nekaj-let-pred-zacetkom-serijske-proizvodnje-neue-klasse/</guid><pp:caseid>810334</pp:caseid><pp:summary><![CDATA[+++ Realistične simulacije prihodnosti so že mogoče v digitalni podobi tovarne +++ Zaposleni se usposabljajo na „digitalnem dvojčku“ s pomočjo očal za navidezno resničnost +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>Dodatne informacije so na voljo spodaj in v priponki v
    angleščini. <br clear="all"/>
<strong> </strong></p>
<p>
<strong>Regensburg. </strong>At BMW Group Plant Regensburg, it is
  already possible to experience in virtual form what the factory will
  look like a few years from now: Production of the NEUE KLASSE, BMW’s
  next model generation, will also ramp up in Regensburg in the second
  half of the decade. Plant Director Armin Ebner: “With the NEUE KLASSE,
  which is based on an entirely new vehicle architecture, our goal as a
  company is to set new standards for digitalisation, electrification
  and circularity. Today, many years before the official launch of
  series production, virtual planning of the new production lines is
  already well underway – even as we continue to build the current BMW
  X1 and BMW X2 models.”</p>
<p>
<strong>Virtual image of new production lines years before series launch</strong></p>
<p>As part of a pilot project implemented in vehicle assembly, BMW Group
  Regensburg is utilising “3D human simulation” for the first time
  company-wide. “This allows us to not only map future manufacturing
  structures virtually in a digital twin, but also simulate the
  employees who will work on our assembly lines in the future,” explains
  Sebastian Moser, an innovation and digitalisation specialist for the
  Regensburg production system. In practice, this means future workflows
  and individual operations on the Regensburg assembly line can be
  virtually mapped and tested long before the series launch of new models.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/2b043846-90b2-4204-b97c-412ef51091e6/P90561085_highRes_innovative-3d-human-.jpg"/></span></span></p>
<p>“The project is a further step towards the digital and intelligently
  connected BMW iFACTORY,” confirms Ebner. “Virtualisation, artificial
  intelligence and data science are accelerating and refining our
  planning. Digital factory planning enables us to reduce planning
  effort and realise more efficient, stable vehicle launches in the
  future.” The BMW Group is adopting a digital-first approach to
  validate and optimise complex manufacturing systems throughout its
  production network, relying on NVIDIA Omniverse Enterprise, a platform
  for creating and operating 3D industrial metaverse applications, to
  run simulations with digital twins.</p>
<p>
<strong>Human simulation already very close to future factory reality</strong></p>
<p>To date, the "3D human simulation" at the BMW Group site in
  Regensburg encompasses a complete line section with 41 operating
  cycles, covering over 1,000 square metres of assembly space. Realistic
  simulation of operations in the future factory layout makes it
  possible to already develop effective cycle specifications and conduct
  health-friendly ergonomic analyses today.</p>
<p>“The ‘model people’ on our digital assembly line move and behave just
  like real people,” explains Dominik Wottke, a production and quality
  expert in vehicle assembly at the Regensburg plant. “For example, if
  the software detects that a virtual employee needs to bend too low or
  lift a weight that is too heavy to be able to complete an operation,
  then that is also the case in the real world. We are therefore able to
  respond to this in a targeted manner and make improvements in the modelling.”</p>
<p>
<strong>VR goggles take employees on virtual journey into the future</strong></p>
<p>The “3D human simulation” also serves as a training and information
  tool. “We can use video sequences from the digital twin to take our
  associates on a journey into the future and show them what their
  future workplace will look like,” says Wottke. Project managers have
  set up a virtual room for this purpose, where employees from vehicle
  assembly in Regensburg can wear VR goggles to explore the future
  assembly line virtually and examine details up close, if needed. They
  can also practice specific operating cycles and enhance their skills,
  working alongside virtual “colleagues”. The aim is to train these
  operations so well in advance that the learning phase on the actual
  assembly line can be shortened.</p>
<p>
<span>
<span style=""><img src="https://content.presspage.com/uploads/3240/135681ed-600e-4f99-a319-23d972908d9e/P90561089_highRes_innovative-3d-human-.jpg"/></span></span></p>
<p> </p>
<p>
<strong>If you have any questions, please contact:</strong></p>
<p>Christian Dürrschmidt, Communications Regensburg</p>
<p>Cell phone: +49 151 6060 5194,</p>
<p>Email: <a href="mailto:Christian.Duerrschmidt@bmw.de">Christian.Duerrschmidt@bmw.de</a></p>
<p> </p>
<p>Saskia Graser, head of Communications Regensburg and Wackersdorf</p>
<p>Cell phone: +49 151 6060 2014,</p>
<p>Email: <a href="mailto:Saskia.Graser@bmw.de">Saskia.Graser@bmw.de</a></p>
<p>Media website: <a href="https://newsroom.bmwgroup.com/global/en">https://newsroom.bmwgroup.com/global/en</a></p>
<p>Email: <a href="mailto:presse@bmw.de">presse@bmw.de</a></p>
<p>
<strong> </strong></p>
<p>
<strong>BMW Group Plants Regensburg and Wackersdorf</strong></p>
<p>The BMW Group has viewed itself for decades as the benchmark for
  production technology and operational excellence in vehicle
  construction – including at its locations in Regensburg and
  Wackersdorf. <br/>The BMW Group vehicle plant in Regensburg has been
  in operation since 1986 and is one of more than 30 BMW Group
  production locations worldwide. A total of up to 1,400 vehicles of the
  BMW X1 and BMW X2 models come off the production line at Plant
  Regensburg every workday – destined for customers all over the world.
  Different types of drive trains are flexibly manufactured on a single
  production line – from vehicles with internal combustion engines to
  plug-in hybrids, to fully-electric models.</p>
<p>High-voltage batteries for the electric models built in Regensburg
  are also produced locally, in direct proximity to the vehicle plant.
  They are assembled at the electric component production facility,
  which opened in 2021 at the Leibnizstrasse location.</p>
<p>BMW Innovation Park Wackersdorf also belongs to the Regensburg site.
  The 55-hectare campus built in the 1980s was originally intended as a
  nuclear reprocessing facility. The BMW Group has located its cockpit
  production there, as well as its parts supply for overseas plants. In
  addition to BMW as the largest employer, several other companies are
  also based at Innovation Park Wackersdorf. A total of around 2,500
  employees work there.</p>
<p>The BMW Group core staff at the Regensburg and Wackersdorf locations
  in eastern Bavaria is made up of around 9,250 employees, including
  more than 300 apprentices.</p>
<p>
<a href="http://www.bmwgroup-werke.com/regensburg/de.html">www.bmwgroup-werke.com/regensburg/de.html</a></p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br/>Tel: +38615867374<br/>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production,Research &amp; Development,Locations,Regensburg,Wackersdorf]]></category>
            <pubDate>Thu, 18 Jul 2024 09:00:00 +0200</pubDate>
            <pp:lastModified>Thu, 18 Jul 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/f44e7bad-501d-4bfc-84b1-a485a03ae3c1/500_P90561087_highRes_innovative-3d-human-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/f44e7bad-501d-4bfc-84b1-a485a03ae3c1/500_P90561087_highRes_innovative-3d-human-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/f44e7bad-501d-4bfc-84b1-a485a03ae3c1/P90561087_highRes_innovative-3d-human-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90561087_highRes_innovative-3d-human-.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group v svojem proizvodnem sistemu širi uporabo 3D tiskanih robotskih prijemal.</title>
                        <link>https://newsroom.bmwgroup.com/emea/sl/bmw-group-v-svojem-proizvodnem-sistemu-siri-uporabo-3d-tiskanih-robotskih-prijemal/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/sl/bmw-group-v-svojem-proizvodnem-sistemu-siri-uporabo-3d-tiskanih-robotskih-prijemal/</guid><pp:caseid>810273</pp:caseid><pp:summary><![CDATA[+++ Hitro, ekonomično, vsestransko in trajnostno z dodatno proizvodnjo +++ Novo bionično prijemalo v tovarni BMW Group Landshut prihrani še več teže +++ Inovativno bionično prijemalo za celotne talne sklope v tovarni BMW Group München +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>Dodatne informacije so na voljo spodaj in v priponki v angleščini.<br clear="all" />  <strong>
    <br clear="all" />Munich.</strong> With more than 30 years of
  experience, the BMW Group is a pioneer in the field of additive
  manufacturing, better known as 3D printing. 3D printers have been used
  from as early as 1991 to produce individual vehicle parts and
  components, initially for concept cars, prototypes and race cars, then
  later for production models. The BMW Group now also manufactures many
  work aids and tools for its own production system in various 3D
  printing processes. From tailor-made orthoses for employees, and
  teaching and production aids, to large, weight-optimised robot
  grippers, used for such things as CFRP roofs and entire floor
  assemblies. At the “Additive Manufacturing Campus” in Oberschleißheim,
  the BMW Group’s central hub for production, research and training in
  3D printing, more than 300,000 parts were “printed” in 2023.
  Furthermore, over 100,000 printed parts were produced per year across
  all the plants that form the global production network, from
  Spartanburg and the German plants to sites in Asia.</p>
<p>“The increasing use of additive manufacturing in the BMW Group
  production system has many benefits. For example, we are able to
  quickly, economically, flexibly and sustainably produce our own
  production aids and handling robots, which we can individually adapt
  to specific requirements at any time, as well as being able to
  optimise their weight. Less weight allows higher speeds on the
  production line, shorter cycle times and reduced costs. Plus, smaller
  robots can be used in the medium term, which also cuts CO<sub>2</sub>
  emissions and costs,” says Jens Ertel, Head of BMW Additive Manufacturing.</p>
<p>“As well as the direct additive manufacturing procedure, the BMW
  Group has also been using sand-based 3D printing to create moulds for
  many years at its site in Landshut. This technology is typically used
  to manufacture prototype casts, as well as for the large-scale
  production of components for high-performance motors. Another very
  attractive field of application is now that of large production aids,”
  says Klaus Sammer, Head of Product and Process Planning for Light
  Metal Casting.</p>
<p>
  <strong>Printed moulds for aluminium cylinder heads in large-scale production</strong></p>
<p>Additive manufacturing processes have been used on a daily basis for
  a long time at BMW Group Plant Landshut. For many years, these have
  included moulds for the manufacturing of aluminium cylinder heads,
  which are printed three-dimensionally using the sand casting process.
  Here, sand is repeatedly applied in thin layers and stuck together
  using binders. This makes it possible to create moulds for the
  manufacturing of very complex structures, which are then filled with
  liquefied aluminium.</p>
<p>
  <strong>Using 3D printing to manufacture large robot grippers for CFRP roofs</strong></p>
<p>For a number of years, the BMW Group’s Lightweight Construction and
  Technology Centre in Landshut has been using a particularly large
  gripper element, which was made using the 3D printing process.
  Weighing around 120 kilograms, the gripper for a robot can be
  manufactured in just 22 hours and is then used on a press in the
  production of all CFRP roofs for BMW M GmbH models. The press is first
  loaded with the CFRP raw material. The gripper is simply rotated 180
  degrees to remove the finished roofs. Compared to conventional
  grippers, the version manufactured using 3D printing was roughly 20
  percent lighter, which in turn extended the operating life of the
  robots and also reduced wear and tear on the system, as well as
  cutting maintenance intervals. The combined use for two steps also
  reduced the cycle time. A unique feature of the robot gripper is the
  ideal combination of two different 3D printing processes. While the
  vacuum grippers and the clamps for the needle gripper to lift the CFRP
  raw material are made using selective laser sintering (SLS), the large
  roof shell and bearing structure are manufactured using large scale
  printing (LSP). LSP can be used to produce large components
  economically and sustainably. The process uses injection moulding
  granules and recycled plastics, while CFRP residual material can also
  be used and recycled. Compared to the use of primary raw materials,
  CO<sub>2</sub> emissions when manufacturing the gripper are roughly 60
  percent lower.</p>
<p>
  <strong>Further weight savings, courtesy of new generation of bionic grippers</strong></p>
<p>In the summer of 2023, a new, even lighter generation of gripper was
  introduced. To achieve this, the previous gripper concept was analysed
  and optimised topologically – the birth of the bionic robot gripper.
  This combines the roof shell from the LSP printer with SLS vacuums and
  a bionically optimised bearing structure. For this, a mould with
  printed cores is used in the sand casting. This mould is then cast
  with the intricate aluminium structure. The new gripper is a further
  25 percent lighter than its predecessor, meaning the entire process of
  manufacturing a CFRP roof of the BMW M3 can be performed with just one
  robot, rather than three as was previously the case. Nowadays, double
  grippers manufactured individually within the BMW Group, courtesy of
  3D printing, are used for all CFRP roofs at BMW Group Plant Landshut.</p>
<p>
  <strong>New 3D-printed gripper also used in chassis construction</strong></p>
<p>The BMW Group also employs grippers produced using the 3D printing
  process in chassis construction – for example, grippers printed with
  the LSP process for dealing with doors at BMW Group Plant Regensburg.
  “With an optimised bearing structure produced using 3D printing, we
  were able to increase the rigidity of the gripper when handling door
  elements at the plant in Regensburg, while at the same time reducing
  weight. In subsequent projects, it is then possible to use robots with
  a low bearing capacity, which helps to cut costs,” says Florian
  Riebel, Head of Door and Flap Production in Regensburg.</p>
<p>However, the company is now taking it one step further at BMW Group
  Plant Munich. As of recently, the first examples of a bionic robot
  gripper have been used at the parent plant. This gripper can hold and
  move the entire floor assembly of a BMW i4. For the floor assembly
  gripper, 3D printing is used to create a sand casting mould, which is
  filled with liquid aluminium. The bearer is optimised in terms of
  weight and maximum load capacity, and weighs with all additional
  add-on elements a mere 110 kilograms. That makes it roughly 30 percent
  lighter than the previous, conventional model. Manufacturing using
  sand casting and aluminium makes it possible to represent intricate
  load-optimised structures. This results in maximum weight reduction
  and thus makes it possible in the medium term to use smaller and
  lighter heavy-duty lifting robots, which require less energy and thus
  reduce CO<sub>2</sub> emissions. Markus Lehmann, Head of Plant
  Engineering and Robotics at BMW Group Plant Munich: “At the Munich
  plant, we are continuously expanding the use of production aids
  created through additive manufacturing. When it comes to the field of
  gripper and handling systems, we use 3D printing to equip our
  established grippers with individual, printed attachments and are
  already replacing complete gripper systems with highly-integrated and
  weight-optimised bearing structures. When handling the full BMW i4
  floor assembly, this allowed us to reduce the weight of the complete
  gripper by 30 percent – 50 kg – and thus to extend the service life of
  our facilities.”</p>
<p>
  <strong>Use of innovative software solutions in additive manufacturing</strong></p>
<p>Intricate and bionic structures are designed and calculated using
  special generic software tools, such as Synera. BMW iVentures had
  strategically invested in this software, previously known as Elise.
  Synera allows fast and efficient optimisation and is now used in many
  development areas within the BMW Group. It is particularly worth using
  the software in 3D printing, as topologically optimised, bionic
  structures can virtually be printed one to one, thanks to the high
  degree of flexibility of the 3D printing process. This makes it
  possible to exploit the full potential for lightweight construction.
  The BMW Group’s Additive Manufacturing Campus is home to a team of
  design and construction specialists, who compare a diverse range of
  software solutions and use them to design components. The knowledge is
  then passed on throughout the company via the Additive Manufacturing
  Campus. In the case of gripper design, special workflows have been
  developed and implemented, which allow the calculation and
  construction of the bearing structure to be largely automated, and
  thus fast and efficient.</p><div class="import-contacts-wrapper"><div class="import-contact">Stik za medije: Maja Ilec<br>Tel: +38615867374<br>Elektronska pošta: <a href="mailto:maja.ilec@bmwgroup.com">maja.ilec@bmwgroup.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Production,Research &amp; Development,Production Plants,Locations,Munich,Landshut,Regensburg]]></category>
            <pubDate>Thu, 23 May 2024 14:00:00 +0200</pubDate>
            <pp:lastModified>Thu, 23 May 2024 12:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/99d336f8-de69-4c11-81a9-34673cb4b4bd/500_P90551172_highRes_3d-printed-robot-gri.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/99d336f8-de69-4c11-81a9-34673cb4b4bd/500_P90551172_highRes_3d-printed-robot-gri.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/99d336f8-de69-4c11-81a9-34673cb4b4bd/P90551172_highRes_3d-printed-robot-gri.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90551172_highRes_3d-printed-robot-gri.jpg]]></pp:imageTitle></item></channel>
                    </rss>