<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Portugal]]></title>
                    <link>https://newsroom.bmwgroup.com/emea/pt-pt/</link>
                    <description></description>
                    <language>pt-pt</language>
                    <lastBuildDate>Fri, 09 Oct 2026 07:42:47 +0200</lastBuildDate>
                    <pubDate>Tue, 30 Sep 2025 10:27:29 +0200</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom Portugal]]></title>
                        <url>https://content.presspage.com/clients/150_3240.png</url>
                        <link>https://newsroom.bmwgroup.com/emea/pt-pt/</link>
                        <width>144</width>
                    </image><item>
                        <title>BMW Group’s newest, most innovative production site officially opens in Debrecen</title>
                        <link>https://newsroom.bmwgroup.com/emea/pt-pt/bmw-groups-newest-most-innovative-production-site-officially-opens-in-debrecen/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/pt-pt/bmw-groups-newest-most-innovative-production-site-officially-opens-in-debrecen/</guid><pp:caseid>806466</pp:caseid><pp:summary><![CDATA[+++ Impressive ceremony combines Hungarian culture and modern automotive production +++ First BMW Group car plant to rely entirely on electricity from renewable energy during normal operation +++ Latest technologies based on BMW iFACTORY principles, with first Gen6 high-voltage battery production facility on-site +++ New BMW iX3 to enter series production as first Neue Klasse vehicle in late October +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Debrecen.</strong> With an impressive ceremony that
  artistically combined Hungarian culture and modern automotive
  production, Oliver Zipse, Chairman of the Board of Management of BMW
  AG, today officially opened the BMW Group plant in Debrecen. The BMW
  Group’s newest and most innovative production site marks the beginning
  of a new era for the company. In late October, the new BMW iX3 will
  enter series production in the Hungarian university town of Debrecen
  as the first vehicle of the Neue Klasse. Plant Debrecen was planned
  virtually and realised in practice fully in line with the principles
  of the BMW iFACTORY, becoming the first BMW Group car plant to rely
  entirely on electricity from renewable energy during normal operation.</p>
<p>In addition to Oliver Zipse, high-ranking representatives from
  Hungarian politics, such as Prime Minister Viktor Orbán and the Mayor
  of Debrecen, László Papp, as well as Milan Nedeljković, Member of the
  Board of Management for Production, Ilka Horstmeier, Member of the
  Board of Management for Human Resources and Real Estate, and
  Hans-Peter Kemser, President and CEO BMW Manufacturing Hungary Kft.,
  attended the grand opening.</p>
<p>“In our global production network, our new plant in Debrecen is a
  pioneer: It is our first fully-electric plant, the first production
  site to operate entirely without fossil fuels – and the first to build
  vehicles for the Neue Klasse. This makes our plant in Debrecen a
  decisive factor in the BMW Group's future success,” said Oliver Zipse.
  “The opening also sends a strong signal: We are expanding our
  footprint on our home continent and reaffirming our commitment to
  Europe as a strong and competitive location for industry.”</p>
<p>Hans-Peter Kemser added at the ceremony: “This is not only a new BMW
  Group plant – it is a cornerstone of progress. We are a partner to
  culture, to education and to the University of Debrecen, where
  together we foster the talents that will shape the future. And above
  all, it is a community – deeply embedded in the life of Debrecen and Hungary.”</p>
<p> </p>
<p>
  <strong>Strengthening the industrial base and expanding training</strong></p>
<p>The official opening ceremony began with a look back at the plant’s
  construction, following a 2018 decision that launched one of Hungary’s
  largest greenfield investments. The BMW Group’s first Central European
  location has firmly placed Debrecen on the region's automotive map,
  creating more than 2,000 direct jobs – and many more along the supply
  chain, at regional suppliers and service providers that have recently
  established themselves in Debrecen, alongside national and
  international companies. The new plant has also strengthened the
  industrial park and driven additional investment in transport and infrastructure.</p>
<p>At the same time, through collaborations with institutions such as
  the local university and the Vocational Training Centre of Debrecen,
  DSZC, Plant Debrecen has also become one of the largest training hubs
  for dual education programmes in Hungary.</p>
<p> </p>
<p>
  <strong>Only the best of the best for Debrecen</strong></p>
<p>Plant Debrecen is the first BMW Group production site not tied to a
  specific primary plant. Instead, it serves as a network plant,
  combining best practices from different locations worldwide. For
  example, the press shop is modelled on the systems used in Spartanburg
  (USA) and Swindon (Great Britain), with their know-how and
  technologies further refined for Debrecen. In the body shop, the
  positioning of nearly 1,000 industrial robots, along with their
  processes, was digitally simulated in detail beforehand. The number of
  joining methods was also significantly reduced, with further
  streamlining allowing design features for the Neue Klasse to be
  integrated early in development.</p>
<p> </p>
<p>
  <strong>Paint shop key to largest reduction in CO<sub>2</sub>e emissions</strong></p>
<p>At BMW Group Plant Debrecen, the paint shop plays a critical role in
  significantly reducing the BMW iX3’s CO<sub>2</sub>e footprint.
  Production of the new BMW iX3 will generate a total of about 80kg CO₂e
  (scope 1/2 emissions). This figure covers CO₂e emissions from Plant
  Debrecen, as well as in-house parts production at other BMW Group
  facilities, including components manufactured in Landshut, for
  example. This represents a reduction of approx. two-thirds compared to
  production of existing BMW derivatives. For Plant Debrecen alone, this
  approach will reduce CO₂e emissions from the manufacture of a vehicle,
  including its high-voltage battery, by around 90% – to about 34 kg
  CO₂e (when operating at full capacity, compared with other BMW Group facilities).</p>
<p>About a quarter of the plant's annual power needs will be supplied by
  the 50‑hectare on-site photovoltaic system, one of the largest in
  Hungary. Surplus solar energy, such as that generated on non-working
  days, is stored in a 1,800 m³ thermal storage system with a capacity
  of 130 MWh.</p>
<p> </p>
<p>
  <strong>Digitalised assembly processes and smart “finger structure”</strong></p>
<p>Complete digitalisation of production processes further boosts
  assembly efficiency – for example, sensors and camera systems along
  the production line are used to automate quality processes. AI
  evaluates the data and provides real-time feedback to employees on the
  assembly line. The building's “finger structure” – an optimised
  version of BMW Group Plant Leipzig – allows 80% of parts to be
  delivered directly to the correct point of assembly on the line.
  In-house logistics are fully electric.</p>
<p> </p>
<p>
  <strong>High-voltage battery assembly in line with “local for local” principle</strong></p>
<p>High-voltage batteries are assembled directly on site, allowing for
  short distances in line with the “local for local” principle. Plant
  Debrecen will be the first of five plants worldwide to begin series
  production of Gen6 high-voltage batteries at this location. Seamless
  in-line quality inspections and 100% end‑of‑line monitoring enable a
  consistent zero-defect approach.</p>
<p> </p>
<p>
  <strong>Final photo with employees and two BMW iX3s</strong></p>
<p>The opening ceremony concluded with a music and dance performance
  celebrating Hungarian culture and traditions, which the BMW Group also
  supports through local events and organisations. To wrap up, numerous
  employees joined Viktor Orbán and Oliver Zipse on stage, alongside two
  new BMW iX3s.</p>
<p> </p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>WLTP energy consumption combined: 17,9 - 15,1 kWh/100 km; WLTP CO₂
  emissions combined: 0 g/km; CO₂-class: A; WLTP electric range: 679 -
  805 km</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Contato de imprensa: Joao Trincheiras<br>Tel: +351-21-487-3080<br>endereço de e-mail: <a href="mailto:joao.trincheiras@bmw.pt">joao.trincheiras@bmw.pt</a></div></div></div>]]></description><category><![CDATA[Press Release,Sustainability,Drive Technologies,BMW,Locations,Research &amp; Development,Production Plants,Mobility of the future,iX3,Debrecen,Product]]></category>
            <pubDate>Tue, 30 Sep 2025 10:27:29 +0200</pubDate>
            <pp:lastModified>Tue, 30 Sep 2025 08:27:29 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/6bb04224-9420-4740-8f54-367bcc6abb47/500_P90619424_highRes_-opening-bmw-group-p.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/6bb04224-9420-4740-8f54-367bcc6abb47/500_P90619424_highRes_-opening-bmw-group-p.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/6bb04224-9420-4740-8f54-367bcc6abb47/P90619424_highRes_-opening-bmw-group-p.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90619424_highRes_-opening-bmw-group-p.jpg]]></pp:imageTitle></item><item>
                        <title>Efficient, sustainable, digital: New BMW Group Plant Debrecen set to begin series production of the BMW iX3 in late October</title>
                        <link>https://newsroom.bmwgroup.com/emea/pt-pt/efficient-sustainable-digital-new-bmw-group-plant-debrecen-set-to-begin-series-production-of-the-bmw-ix3-in-late-october-pt-pt/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/pt-pt/efficient-sustainable-digital-new-bmw-group-plant-debrecen-set-to-begin-series-production-of-the-bmw-ix3-in-late-october-pt-pt/</guid><pp:caseid>806580</pp:caseid><pp:summary><![CDATA[+++ First BMW Group car plant to rely entirely on electricity from renewable energy during normal operation; no fossil fuels used +++ Use of electric power in paint shop drives reduction in CO₂e emissions from BMW iX3 production +++ Typical iFACTORY: virtual planning and testing, efficient processes and structures, smart use of AI +++ High-voltage batteries assembled on site +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Debrecen.</strong> The BMW Group has entered the final phase
  before the first Neue Klasse model rolls off the assembly line. Series
  production of the new BMW iX3 will get underway in late October at the
  BMW Group plant in Debrecen, Hungary, as the newest, most innovative
  manufacturing facility in the company’s global production network
  officially begins work.</p>
<p>“The start of series production for the BMW iX3 signals a new era of
  automotive manufacturing. Our new plant in Debrecen has been designed
  and built fully in line with our strategic vision of the iFACTORY.
  Digital from the very beginning, the plant will offer a new dimension
  in efficient production without fossil fuels,” says Milan Nedeljković,
  member of the Board of Management of BMW AG responsible for Production.</p>
<p>The BMW iFACTORY represents a strategic vision of production, built
  on streamlined, efficient structures, responsible resource management,
  economical use of cutting-edge digital innovations and a strong focus
  on employees. The BMW Group has also registered new patents for a
  large number of innovative systems and processes at Plant Debrecen.</p>
<p>“We have taken on the challenge of building a completely new vehicle
  as the first job at an entirely new plant – and doing so in the
  leanest, most efficient way possible. We have simplified processes,
  reduced complexity, digitally validated each individual operation and
  systematically leveraged expertise across our global network. The
  result is this plant, with its efficient production, innovative
  processes and the flexibility to integrate additional models,” says
  Hans-Peter Kemser, head of BMW Group Plant Debrecen.</p>
<p>As with any new model, capacity for the new BMW iX3 will be gradually
  ramped up in stages after the start of production. Spearheading the
  arrival of the Neue Klasse, the iX3 showcases the latest design and
  technology innovations that will define the brand's entire model range
  in the future. Between now and 2027, the technologies in the Neue
  Klasse will be integrated into 40 new models and model updates.</p>
<p>
  <strong>From virtual factory to reality</strong></p>
<p>The guiding principles of the BMW iFACTORY have been fully
  implemented in the technologies employed at the new BMW Group plant in
  Debrecen. For example, Plant Debrecen was planned and built digitally
  from the outset, and celebrated its virtual start of production back
  in March 2023 in the BMW Group’s Virtual Factory. This approach
  allowed every operation to be tested virtually in advance, enabling
  production lines to be installed in the buildings exactly as in the
  digital twin.</p>
<p>
  <strong>Optimal processes for all plant technologies</strong></p>
<p>With an optimised value stream and efficient systems, the
    <strong>press shop</strong> guarantees a high level of productivity.
  The BMW Group continues to follow its proven strategy of using the
  same tools and presses throughout its global network. This optimises
  capacity utilisation within the network by allowing press tools to be
  deployed at multiple locations and enabling staff to be trained in-network.</p>
<p>The <strong>body shop</strong>, in particular, benefits from prior
  digital planning and validation. Every process detail was digitally
  simulated in advance to determine the ideal value stream and ensure
  that each of the nearly 1,000 robots was optimally positioned. From
  the outset, close collaboration between development and production
  teams led to high production efficiency and maximum customer benefit.
  For example, the number of joining methods was significantly reduced,
  lowering overall complexity. Design features integrated early in
  development are also evident in the details of the Neue Klasse, such
  as the invisible door seal. This creates a visual connection between
  the window and the door, resulting in a unique look. In addition,
  maximising the space available for the battery in the body structure –
  and thus the size and performance of the battery – directly benefits
  the customer.</p>
<p>At BMW Group Plant Debrecen, the <strong>paint shop</strong> plays a
  critical role in <strong>significantly reducing the CO<sub>2</sub>e
    footprint of the BMW iX3</strong>. Production of the new BMW iX3
  will generate a total of about 80kg CO₂e (scope 1/2 emissions). This
  figure covers CO₂e emissions from Plant Debrecen, as well as in-house
  parts production at other BMW Group facilities, including components
  manufactured in Landshut, for example. This represents a
    <strong>reduction of approx. two-thirds compared to production of
    existing BMW derivatives. </strong>For Plant Debrecen alone, this
  approach will <strong>reduce CO₂e emissions from the manufacture of a
    vehicle, including its high-voltage battery, by around 90%</strong>
  – to about 34 kg CO₂e (when operating at full capacity, compared with
  other BMW Group facilities).</p>
<p>Paint shops typically rely on gas to reach the high temperatures (up
  to 180 degrees Celsius) required. Plant Debrecen will be the BMW
  Group's first car plant supplied exclusively <strong>with electricity
    from renewable energy sources during normal operation</strong>, i.e.
  without using fossil fuels such as oil or gas. Because of its high
  energy demands, the paint shop is the most important factor in
  significantly lowering Plant Debrecen’s CO<sub>2</sub>e
    emissions.<strong> In the paint shop alone, using electricity from
    renewable sources reduces annual CO<sub>2</sub>e emissions by up to
    12,000 tonnes. </strong>About a quarter of the plant's annual power
  needs will be supplied by the 50‑hectare on-site <strong>photovoltaic
  system.</strong> Surplus solar energy, such as that generated on
  non‑working days, is stored in a 1,800 m³ <strong>thermal storage
  system</strong> with a capacity of 130 MWh.</p>
<p>The paint shop also uses an energy recovery system. A <strong>heat
  grid</strong> was successfully implemented in the design of the new
  paint shop, delivering additional energy savings of up to 10%. This
  innovative concept combines multiple measures for efficient
    <strong>energy recovery</strong> from the compressed air supply,
  drying ovens and cooling systems. The recovered waste heat is then
  used to preheat the water circuit.</p>
<p>In addition, a <strong>thermal storage system</strong> – holding
  1,800 m³ of water, with a capacity of 130 MWh – stores surplus energy
  from the photovoltaic system during off-peak periods and supplies it
  as heat during peak demand.</p>
<p>Full digitalisation of production processes further boosts
  <strong>assembly</strong> efficiency. The AIQX (Artificial
  Intelligence Quality Next) IT platform developed in-house at the BMW
  Group is a key component of the BMW iFACTORY. AIQX uses sensors and
  camera systems along the production line to automate quality
  processes. AI evaluates the data and provides real-time feedback to
  employees on the line. Looking ahead, vehicles on the line will also
  become active, connected participants in the industrial IoT (Internet
  of Things) ecosystem. They will conduct self-analysis, interact with
  plant employees in real time and automatically share and document
  relevant messages, using tools such as on-board cameras and IT
  systems. The equipment, tools, components and every BMW in the
  assembly halls are already digitally connected to the BMW production system.</p>
<p>The building's “finger structure” – an optimised version of the
  design employed at BMW Group Plant Leipzig – allows 80% of parts to be
  delivered directly to the correct point of assembly on the line.
  All-electric in-house <strong>logistics</strong> also benefit from
  autonomous tugger trains, which transport high-voltage batteries
  directly from production to installation points, as well as Smart
  Transport Robots that autonomously deliver smaller components to the
  assembly line. By linking all internal and external databases, the
  entire logistics process achieves unprecedented digital depth,
  automating many previously manual, interconnected analysis tasks.
  Well-structured information is therefore available at any time and can
  be analysed instantly “at the push of a button”.</p>
<p>The BMW Group has created highly intelligent production processes for
  its new<strong> high-voltage batteries</strong> developed in-house.
  Plant Debrecen will be the first of five plants worldwide to begin
  series production of Gen6 high-voltage batteries. The production
  processes were initially developed and tested at pilot plants.
  Artificial intelligence, data analytics and constant knowledge sharing
  within the production network also play a key role in the ramp-up of
  production. Digital twins of production and comprehensive AI databases
  ensure optimisation of processes and employee training. A consistent
  zero-defect approach enables seamless in-line quality inspections and
  100% end‑of-line monitoring. In line keeping with the “local for
  local” principle, high‑voltage battery assembly takes place directly
  on site, allowing the production teams to take advantage of
  infrastructure efficiencies and short distances.</p>
<p>
  <strong>Best of the best:<br />Plant Debrecen benefits from expertise
    at all production sites worldwide </strong></p>
<p>BMW Group Plant Debrecen is the first production site in the
  company's network not tied to a specific primary plant. Instead, it
  serves as a network plant, combining best practices from various
  locations worldwide. A major advantage of this approach is that the
  plant’s current workforce of more than 2,000
  <strong>employees</strong> can be trained within the network, allowing
  employee know-how from different locations, such as China, South
  Africa, Mexico, the US and, of course, Germany, to be shared. At the
  same time, employees throughout the global network gain the
  opportunity to share their technology insights in Debrecen and bring
  expertise in production of the Neue Klasse models back to their own
  location – creating a win-win situation for all the plants.</p>
<p> </p>
<p>
  <strong>A long version with further details on all technologies is
    available as a PDF file in the downloads section.</strong></p><div class="co2emission"><div class="co2emission-headline">CO2 EMISSIONS & CONSUMPTION.</div><div class="co2emission-text"><p>WLTP energy consumption combined: 17,9 - 15,1 kWh/100 km; WLTP CO₂
  emissions combined: 0 g/km; CO₂-class: A; WLTP electric range: 679 -
  805 km.</p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Contato de imprensa: Joao Trincheiras<br>Tel: +351-21-487-3080<br>endereço de e-mail: <a href="mailto:joao.trincheiras@bmw.pt">joao.trincheiras@bmw.pt</a></div></div></div>]]></description><category><![CDATA[Press Release,Sustainability,Research &amp; Development,Production,iX3,Industry 4.0,Logistics,Debrecen,Digitalisation,Product,BMW]]></category>
            <pubDate>Wed, 17 Sep 2025 12:53:16 +0200</pubDate>
            <pp:lastModified>Wed, 17 Sep 2025 10:53:16 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/bbfafdfc-171d-4cb0-8440-812e7893f796/500_P90617479_highRes_milan-nedeljkovi-mem.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/bbfafdfc-171d-4cb0-8440-812e7893f796/500_P90617479_highRes_milan-nedeljkovi-mem.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/bbfafdfc-171d-4cb0-8440-812e7893f796/P90617479_highRes_milan-nedeljkovi-mem.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90617479_highRes_milan-nedeljkovi-mem.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Plant Debrecen enters the finish straight: Heartbeat of the plant comes to life with ramp-up of assembly</title>
                        <link>https://newsroom.bmwgroup.com/emea/pt-pt/bmw-group-plant-debrecen-enters-the-finish-straight-heartbeat-of-the-plant-comes-to-life-with-ramp-up-of-assembly/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/pt-pt/bmw-group-plant-debrecen-enters-the-finish-straight-heartbeat-of-the-plant-comes-to-life-with-ramp-up-of-assembly/</guid><pp:caseid>806193</pp:caseid><pp:summary><![CDATA[iFACTORY’s full potential: new site in Hungary adopts many innovations from the global production network +++ Forerunner among the BMW Group plants with just-in-sequence delivery to the production line +++ Efficient, ergonomic assembly processes thanks to intense modularisation, fewer different connecting elements, a simplified wiring harness and innovative cockpit assembly +++ Series production will start in late 2025 with the new BMW iX3]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Debrecen. </strong>The future BMW Group plant in the Hungarian
  city of Debrecen is on the finish straight as the ramp-up of the
  assembly line sees the heart of the plant come to life. This is the
  beating heart of all the technologies in the plant, and also where the
  most employees work. The assembly launch thus marks the reaching of
  another milestone.</p>
<p>“Our highly efficient and ergonomic assembly line immediately started
  running without any issues,” said Hans-Peter Kemser, Managing Director
  BMW Group Plant Debrecen. “We achieved this thanks to virtual planning
  and tests, as well as the outstanding collaboration between our new,
  highly motivated employees in Debrecen and our experts within the BMW
  Group’s global production network.”</p>
<p>In assembly, the individual components and systems are installed in
  the painted body – at the end of the process, a car ready to drive
  rolls off the production line. The innovative vehicle architecture of
  the Neue Klasse opens totally new possibilities with regard to
  assembly: greater efficiency thanks to modularisation, fewer different
  connecting elements, and a simplified installation of the wiring
  harness. An innovative cockpit assembly also accelerates the process.</p>
<p>The BMW Group Plant Debrecen is already producing test vehicles for
  the first model of the Neue Klasse: the new BMW iX3.* Thus, the new
  plant is gradually ramping up for series production.</p>
<p>
  <strong>Neue Klasse allows simple, fast assembly process</strong></p>
<p>A number of features of the Neue Klasse are new territory for
  everyone. Unlike in previous models, the cable harness is divided into
  multiple parts, making it easier and more ergonomic to install. The
  zonal wiring harness architecture requires 600 fewer metres of wiring
  and weighs 30 percent less than the previous generation.</p>
<p>On the other hand, some components are modularised when one module is
  formed from many small individual parts. The variation of connecting
  elements has also been radically reduced for the Neue Klasse. This in
  turn reduces the number of different plugs, screws and clips. All of
  this makes assembly significantly more simple. </p>
<p>Furthermore, with the Neue Klasse, a wide range of quality checks can
  be performed digitally whilst still on the production line. This
  procedure will also be implemented at other sites after its initial
  use in Debrecen. The next point of use will be the home plant in
  Munich, which will produce the sedan model of the Neue Klasse as of 2026.</p>
<p>The innovative cockpit assembly accelerates processes at Plant
  Debrecen. It is one of the most compact in the BMW Group’s production
  network, yet still allows full flexibility and variety. As at Plant
  Lydia in China, cockpit pre-assembly is located right next to the main
  line. Once the cockpit has been pre-assembled, it is then installed
  directly in the vehicle just a few metres ahead.</p>
<p>
  <strong>Assembly in Debrecen adopts innovations from existing plants</strong></p>
<p>When planning the new production site in Hungary, the BMW Group used
  a completely virtual design process. In line with the principles of
  the BMW iFACTORY, the tried-and-tested standards and high-tech
  solutions from existing plants were referred to many times. For
  example, many ideas and proven structures from Plant Lydia in China
  and Plant Leipzig can be found in the assembly in Debrecen.</p>
<p>
  <strong>Further development of the finger structure from Leipzig</strong></p>
<p>These structures include the so-called finger structure, or comb
  structure, which the BMW Group developed specifically for Plant
  Leipzig, which opened in 2005. This structure allows supply parts and
  preassembled modules to be transported directly to the assembly lines.
  A record proportion of parts, up to 80%, can be delivered directly in
  Debrecen, as the fingers will enjoy logistics supply from both sides
  for the first time. This is the highest ratio in the BMW Group’s
  production network. The finger structure allows subsequent extension
  and the integration of further assembly steps – flexibility is a
  characteristic of production at the BMW Group.</p>
<p>
  <strong>Production processes, as at Plant Lydia in China</strong></p>
<p>Plant Lydia in China was also an inspiration for many structures and
  processes in the assembly. The plant opened in 2022 and was the first
  BMW Group site to be completely planned and simulated in the virtual
  world from the outset. The shop floor for the assembly line and
  complete conveyor system in Debrecen are set up identically.
  Therefore, the technology was available quickly and had already been
  tried and tested, simplifying the commissioning of a completely new
  production line.</p>
<p>Series production of the new BMW iX3 set to start at the BMW Group
  Plant Debrecen in late 2025. The Hungarian plant has been designed
  specifically for the production of all-electric vehicles. As with the
  start of any new model or new plant, production capacities are
  increased gradually after start of production. The site in Debrecen
  will be the first automobile plant in the BMW Group to operate
  entirely without the use of fossil fuels.</p>
<p>
  <br />*Since this is a pre-production model, consumption data for the
  new BMW iX3 is not available at this time.</p><div class="import-contacts-wrapper"><div class="import-contact">Contato de imprensa: Joao Trincheiras<br>Tel: +351-21-487-3080<br>endereço de e-mail: <a href="mailto:joao.trincheiras@bmw.pt">joao.trincheiras@bmw.pt</a></div></div></div>]]></description><category><![CDATA[Press Release,Research &amp; Development,Production,BMW i,iX3,Debrecen,Product,BMW]]></category>
            <pubDate>Thu, 27 Mar 2025 10:45:53 +0100</pubDate>
            <pp:lastModified>Thu, 27 Mar 2025 09:45:53 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/5327b05c-e9bc-4ffd-9d58-5bc966fbac0c/500_P90592673_highRes_employee-assembling-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/5327b05c-e9bc-4ffd-9d58-5bc966fbac0c/500_P90592673_highRes_employee-assembling-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/5327b05c-e9bc-4ffd-9d58-5bc966fbac0c/P90592673_highRes_employee-assembling-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90592673_highRes_employee-assembling-.jpg]]></pp:imageTitle></item></channel>
                    </rss>