<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Belux]]></title>
                    <link>https://newsroom.bmwgroup.com/emea/fr-lu/</link>
                    <description></description>
                    <language>fr-lu</language>
                    <lastBuildDate>Thu, 08 Oct 2026 04:56:28 +0200</lastBuildDate>
                    <pubDate>Wed, 13 Aug 2025 10:00:00 +0200</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom Belux]]></title>
                        <url>https://content.presspage.com/clients/150_3240.png</url>
                        <link>https://newsroom.bmwgroup.com/emea/fr-lu/</link>
                        <width>144</width>
                    </image><item>
                        <title>Centre de peinture spéciale et individuelle : une touche spéciale dans la production en série</title>
                        <link>https://newsroom.bmwgroup.com/emea/fr-lu/centre-de-peinture-speciale-et-individuelle--une-touche-speciale-dans-la-production-en-serie/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/fr-lu/centre-de-peinture-speciale-et-individuelle--une-touche-speciale-dans-la-production-en-serie/</guid><pp:caseid>793721</pp:caseid><pp:summary><![CDATA[+++ Le groupe BMW va investir plus de 30 millions d'euros dans l'extension sud de l'atelier de peinture de Dingolfing +++ Augmentation de la capacité de production pour les finitions de peinture individuelles et spéciales sur les voitures BMW +++ Combinaison efficace de la production en série et de la peinture manuelle +++]]></pp:summary><description><![CDATA[<div class="imported-article"><div>
  <p>
    <strong>Dingolfing.</strong> A new Centre for Special and Individual
    Paintwork is about to be built at BMW Group Plant Dingolfing. Over
    the next two years, an investment of more than 30 million euros will
    enable a new, southern extension to the existing paintshop.
    Construction will commence in September 2025, with the new facility
    scheduled to go on stream in the spring of 2027.</p>
  <p>The forthcoming extension will offer over 2,000 square metres of
    space across two levels for adding customers’ desired finishes and
    special paintwork options to even more cars in ever more efficient
    processes. “It will enable us to meet the growing wishes of
    customers for something special, and help us develop a lucrative
    area of business for the BMW Group,” says Plant Director Christoph Schröder.</p>
  <p>The paintshop at Dingolfing already offers a particularly wide
    array of colours, paint types and customisation options, with up to
    300 different shades for customers to choose from – plus the
    two-tone and complex special finishes available for exclusive small
    series such as the BMW 3.0 CSL (Fuel consumption combined: 11.0
    l/100 km; CO<sub>2 </sub>emissions combined: 249 g/km according to
    WLTP; details according to NEDC: –) or BMW M4 CS Edition VR46 (Fuel
    consumption combined: 10.2 l/100 km [27.7 mpg imp];
    CO<sub>2</sub> emissions combined: 232 g/km in the WLTP cycle,
    CO<sub>2</sub> class: G).</p>
  <p>A defining feature of this area of manufacturing is always the
    combination of automated processes in series production with
    individual elements of manual painting. According to Sven
    Selaskowki, responsible for Painted Bodies at Plant Dingolfing, the
    new paintline in the forthcoming extension will be equipped to
    enable exactly that: the first coat of coloured paint will be
    applied automatically in series production, with special touches –
    such as stripes or contrast colours on the doors and body for
    two-tone or custom finishes – added by hand afterwards in the
    forthcoming extension. Bodies will then return to the series
    production line for a final coat of clear varnish.</p>
  <p>Depending on demand and the number of units needed, the team in the
    new centre for special paint finishes will comprise upwards of ten people.</p>
  <p>Throughput times will fall by about a quarter compared to the
    current process, and costs per body made will fall noticeably. The
    drying furnaces in the new extension will run on electricity rather
    than gas – via power-to-heat.</p></div>
<h4>CO2 EMISSIONS & CONSUMPTION.</h4>
<div>
  <p>BMW 3.0 CSL: Fuel consumption combined: 11.0 l/100 km;
    CO<sub>2 </sub>emissions combined: 249 g/km according to WLTP;
    details according to NEDC: – </p>
  <p>BMW M4 CS Edition VR46: Fuel consumption combined: 10.2 l/100 km
    [27.7 mpg imp]; CO<sub>2</sub> emissions combined: 232 g/km in the
    WLTP cycle, CO<sub>2</sub> class: G. </p></div><div class="import-contacts-wrapper"><div class="import-contact">Contact presse: Jeroen Lissens<br>Tél: +32-3-890-9708<br>Adresse e-mail: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Locations,Production Plants,Dingolfing]]></category>
            <pubDate>Wed, 13 Aug 2025 10:00:00 +0200</pubDate>
            <pp:lastModified>Wed, 13 Aug 2025 08:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/67a96e73-3953-4a7e-adee-4ffee0d663ee/500_P90451240_highRes_the-8-x-jeff-koons-p.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/67a96e73-3953-4a7e-adee-4ffee0d663ee/500_P90451240_highRes_the-8-x-jeff-koons-p.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/67a96e73-3953-4a7e-adee-4ffee0d663ee/P90451240_highRes_the-8-x-jeff-koons-p.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90451240_highRes_the-8-x-jeff-koons-p.jpg]]></pp:imageTitle></item><item>
                        <title>Mise à jour pour le pionnier électrique de Dingolfing</title>
                        <link>https://newsroom.bmwgroup.com/emea/fr-lu/mise-a-jour-pour-le-pionnier-electrique-de-dingolfing/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/fr-lu/mise-a-jour-pour-le-pionnier-electrique-de-dingolfing/</guid><pp:caseid>793606</pp:caseid><pp:summary><![CDATA[+++ Le modèle BMW iX mis à jour célèbre son début de la production à Dingolfing +++ SAV électrique avec jusqu'à 701 kilomètres d'autonomie, plus de puissance et une sportivité améliorée +++ Ci-joint le communiqué de presse complet en anglais. +++]]></pp:summary><description><![CDATA[<div class="imported-article"><div>
  <p>
    <strong>Dingolfing.</strong> Today, the model update of the
    all-electric BMW iX celebrated its start of production at the BMW
    Group plant in Dingolfing. The electric pioneer, which has been
    manufactured at the site since 2021 and has since been sold over
    130,000 units worldwide, receives a comprehensive update in March
    2025 - offering increased performance, range and sportiness.</p>
  <p>
    <strong>BMW's longest-range electric model.</strong></p>
  <p>The new BMW iX impresses with up to 25% higher drive power,
    significantly improved efficiency and a range of up to 701
    kilometers in the WLTP cycle (BMW iX xDrive60: WLTP combined
    (EnVKV): Energy consumption 21.9 kWh/100 km; CO2 emissions 0 g/km;
    CO2 class A). The BMW iX is thus the most long-range electric model
    in the BMW Group's portfolio and the company's most important
    all-electric new model in 2025 - before the "New Class"
    makes its debut at the end of the year.</p>
  <p>The new BMW iX also presents a more dynamic design than ever
    before: The vehicle is now available with the M Sport package and M
    Sport Pro package for the first time, which enhance the sporty
    appearance both inside and out. New exterior colours such as Arctic
    Race Blue metallic, Dune Grey metallic, Carbon Black metallic, BMW
    Individual Frozen Deep Grey metallic, BMW Individual Frozen Pure
    Grey metallic, Tanzanite Blue metallic and Space Silver are also offered.</p>
  <p>
    <strong>Pioneering the All-Electric Era in Dingolfing.</strong></p>
  <p>Plant Manager Christoph Schröder states: "The BMW iX is a
    special vehicle for us. Four years ago, at its launch, it paved the
    way for many future technologies here on-site. And: It marked the
    beginning of the all-electric vehicle era in our plant."
    Meanwhile, a total of four electric models - the BMW iX, the BMW i7,
    and the all-electric versions of the 5 Series sedan and Touring -
    are being produced at the Lower Bavarian site, along with five
    plug-in hybrids. The BMW iX plays a crucial role in the model
    program of the entire company in the segment of all-electric
    mid-size and upper-class SAVs.</p></div>
<h4>CO2 EMISSIONS & CONSUMPTION.</h4>
<div>
  <p>
    <strong>BMW iX xDrive45:</strong> WLTP combined (EnVKV): Energy
    consumption 21.8 kWh/100km; CO2 emissions 0 g/km; CO2 class A.</p>
  <p>
    <strong>BMW iX xDrive60:</strong> WLTP combined (EnVKV): Energy
    consumption 21.9 kWh/100km; CO2 emissions 0 g/km; CO2 class A.</p>
  <p>
    <strong>BMW iX M70 xDrive: </strong>WLTP combined (EnVKV): Energy
    consumption 23.5 kWh/100km; CO2 emissions 0 g/km; CO2 class A.</p></div><div class="import-contacts-wrapper"><div class="import-contact">Contact presse: Jeroen Lissens<br>Tél: +32-3-890-9708<br>Adresse e-mail: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Locations,Production Plants,iX,Dingolfing,Product,BMW]]></category>
            <pubDate>Fri, 07 Mar 2025 09:29:47 +0100</pubDate>
            <pp:lastModified>Fri, 07 Mar 2025 08:29:47 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/7640fc93-ac4c-4625-abce-1f5c1fa05abf/500_P90590752_highRes_production-of-the-ne.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/7640fc93-ac4c-4625-abce-1f5c1fa05abf/500_P90590752_highRes_production-of-the-ne.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/7640fc93-ac4c-4625-abce-1f5c1fa05abf/P90590752_highRes_production-of-the-ne.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90590752_highRes_production-of-the-ne.jpg]]></pp:imageTitle></item><item>
                        <title>L&#039;usine BMW Group de Dingolfing et l&#039;université des sciences appliquées de Landshut développent une solution logistique intelligente.</title>
                        <link>https://newsroom.bmwgroup.com/emea/fr-lu/lusine-bmw-group-de-dingolfing-et-luniversite-des-sciences-appliquees-de-landshut-developpent-une-solution-logistique-intelligente/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/fr-lu/lusine-bmw-group-de-dingolfing-et-luniversite-des-sciences-appliquees-de-landshut-developpent-une-solution-logistique-intelligente/</guid><pp:caseid>793636</pp:caseid><pp:summary><![CDATA[+++ Augmentation de l'efficacité grâce à la numérisation : comptage des conteneurs vides grâce à l'IA +++ Coopération avec les étudiants +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Dingolfing.</strong> Increasing efficiency through
  digitization: In a successful cooperation between BMW Group Plant
  Dingolfing and Landshut University of Applied Sciences, students have
  developed an innovative solution for plant logistics. The new digital
  tool automates the counting of empty containers using artificial
  intelligence (AI), saving time and avoiding errors.</p>
<p> </p>
<p>
  <strong>Looking for simple automation</strong>
  <br />At the BMW Group Plant Dingolfing, around 1,600 different types
  of containers are in circulation every day, transporting parts for
  vehicle production. Until now, these containers were counted manually,
  which was time-consuming and prone to errors. “Our goal was to
  automate empties counting as efficiently and simply as possible,”
  explains Wolfgang Schratzenstaller, project manager at the BMW Group
  Plant in Dingolfing.</p>
<p> </p>
<p>
  <strong>Cooperation with Landshut University</strong>
  <br />The idea of involving students from Landshut University of
  Applied Sciences in the project met with a positive response.
  “Students bring in new perspectives and unbiased approaches,” says
  Schratzenstaller. Prof. Dr. Abdelmajid Khelil, head of the IoT
  Innovation Lab at Landshut University, supported the project as part
  of a practical teaching module. The collaboration began with the
  summer semester 2024.</p>
<p> </p>
<p>
  <strong>Mobile video instead of mental arithmetic </strong></p>
<p>Within three months, the eight-person team developed a cost-effective
  and efficient solution. A simple mobile phone video, taken while
  running through the rows with the containers, is sufficient to
  determine the exact number per container variant. “QR codes are placed
  above the block storage lanes, which link to a database of container
  data. The AI analyses the video and calculates the number of
  containers,” explains Dominik Dama, an IT master's student.</p>
<p> </p>
<p>
  <strong>Outlook and development</strong></p>
<p>The counting system is currently in the pilot phase to test its
  performance under real conditions. In the future, the solution will
  also be used in other areas of plant logistics. It is also planned to
  further automate the counting process by using autonomous Smart
  Transport Robots (STR) to record the videos.</p><div class="import-contacts-wrapper"><div class="import-contact">Contact presse: Jeroen Lissens<br>Tél: +32-3-890-9708<br>Adresse e-mail: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Locations,Production Plants,Dingolfing,Logistics,Artificial Intelligence]]></category>
            <pubDate>Wed, 12 Feb 2025 11:30:16 +0100</pubDate>
            <pp:lastModified>Wed, 12 Feb 2025 10:30:16 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/f21e8d6b-05cd-46fa-b4bf-63d3ea5e028b/500_P90586998_highRes_with-the-help-of-a-s.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/f21e8d6b-05cd-46fa-b4bf-63d3ea5e028b/500_P90586998_highRes_with-the-help-of-a-s.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/f21e8d6b-05cd-46fa-b4bf-63d3ea5e028b/P90586998_highRes_with-the-help-of-a-s.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90586998_highRes_with-the-help-of-a-s.jpg]]></pp:imageTitle></item><item>
                        <title>Électricité produite par un système photovoltaïque en direct de l&#039;usine.</title>
                        <link>https://newsroom.bmwgroup.com/emea/fr-lu/electricite-produite-par-un-systeme-photovoltaique-en-direct-de-lusine/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/fr-lu/electricite-produite-par-un-systeme-photovoltaique-en-direct-de-lusine/</guid><pp:caseid>793649</pp:caseid><pp:summary><![CDATA[+++ Les usines du groupe BMW de Dingolfing et de Regensburg produiront de l'électricité à partir de systèmes photovoltaïques installés sur les toits des usines à partir de 2025 +++ Puissance installée totale de 14 MWp +++]]></pp:summary><description><![CDATA[<div class="imported-article"><h4>+++ Les usines du groupe BMW de Dingolfing et de Regensburg
  produiront de l'électricité à partir de systèmes photovoltaïques
  installés sur les toits des usines à partir de 2025 +++ Puissance
  installée totale de 14 MWp +++</h4>
<p>//</p>
<p>
  <strong>Dingolfing/Regensburg.</strong> BMW Group Plants Dingolfing
  and Regensburg will obtain electricity generated from renewable energy
  directly from their own roofs. Dingolfing’s rooftop PV system, with a
  capacity of 11.1 MWp, will be one of the most powerful in Germany. To
  achieve this objective, the premium automotive manufacturer is renting
  roof space at its two plant sites in Eastern Bavaria to Sunrock
  Holding Deutschland GmbH, which will generate electricity using
  photovoltaics and make it available to the plants under direct supply
  contracts from 2025 onwards.</p>
<p>Nicole Haft-Zboril, head of BMW Group Real Estate Management,
  underlined that: “With this project, we are not only creating one of
  Germany's biggest rooftop photovoltaic systems – we are also promoting
  the generation of renewable energy directly on site at BMW Group plant locations.”</p>
<p>In Dingolfing, photovoltaic modules cover more than 100,000 square
  metres of hall roof space, with an additional area of over 25,000
  square metres installed in Regensburg. Together, the systems are
  designed to achieve an output of 14 MWp. The annual renewable
  electricity output is estimated at 11.3 GWh for Dingolfing and 2.9 GWh
  for Regensburg, which corresponds to the annual electricity needs of
  several thousand single-family homes.</p>
<p>Georg Brenninkmeijer, managing director of Sunrock Germany, said: “It
  is such an honour for us to collaborate with a renowned automotive
  company like BMW. In a sector with high energy demands, like many
  other industries, it is crucial to develop localised solutions to
  ensure a sustainable energy supply. We are delighted to start
  installing the PV systems in Dingolfing and Regensburg soon, which
  will supply the two BMW Group plants with locally produced green solar
  power in the future.”</p>
<p>The planned photovoltaic systems are scheduled to be commissioned and
  start supplying electricity in Regensburg as early as spring 2025,
  with Dingolfing targeting autumn of next year. Work will get underway
  at both locations in the coming months. In Dingolfing, the modules
  will be installed on the roof of one of the central aftersales
  logistics halls – the Plant 02.70 “Dynamics Centre” – while Regensburg
  will utilise the roof area of one of its logistics halls.</p>
<p>
  <strong> </strong></p>
<p> </p>
<p>If you have any questions, please contact:</p>
<p>Julian Friedrich, BMW Group Plant Dingolfing, head of Communications</p>
<p>Telephone: +49 8731 76 22020, Email: Julian.Friedrich@bmw.de</p>
<p> </p>
<p>Saskia Graser, BMW Group Plant Regensburg, head of Communications</p>
<p>Telephone: +49 941 770 2014, Email: Saskia.Graser@bmw.de</p><div class="import-contacts-wrapper"><div class="import-contact">Contact presse: Jeroen Lissens<br>Tél: +32-3-890-9708<br>Adresse e-mail: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Sustainability,Locations,Production Plants,Environment,Dingolfing,Regensburg]]></category>
            <pubDate>Mon, 21 Oct 2024 10:00:00 +0200</pubDate>
            <pp:lastModified>Mon, 21 Oct 2024 08:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/1d7ee271-e280-4070-9644-50353101bc9b/500_P90574024_highRes_photovoltaic-roof-at.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/1d7ee271-e280-4070-9644-50353101bc9b/500_P90574024_highRes_photovoltaic-roof-at.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/1d7ee271-e280-4070-9644-50353101bc9b/P90574024_highRes_photovoltaic-roof-at.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90574024_highRes_photovoltaic-roof-at.jpg]]></pp:imageTitle></item><item>
                        <title>Début de la production du groupe motopropulseur électrique pour les BMW iX et BMW i4</title>
                        <link>https://newsroom.bmwgroup.com/emea/fr-lu/debut-de-la-production-du-groupe-motopropulseur-electrique-pour-les-bmw-ix-et-bmw-i4/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/fr-lu/debut-de-la-production-du-groupe-motopropulseur-electrique-pour-les-bmw-ix-et-bmw-i4/</guid><pp:caseid>793288</pp:caseid><pp:summary><![CDATA[BMW Group poursuit l'extension des capacités de production du centre de compétences de production E-Drive à Dingolfing +++ Des E-drives pour 500 000 véhicules électrifiés par an à partir de 2022 +++ Début de la production de la cinquième génération de batteries haute tension en Allemagne +++ Transformation réussie vers la production E-drive.]]></pp:summary><description><![CDATA[<div class="imported-article"><p>BMW Group poursuit l'extension des capacités de production du centre
  de compétences de production E-Drive à Dingolfing +++ Des E-drives
  pour 500 000 véhicules électrifiés par an à partir de 2022 +++ Début
  de la production de la cinquième génération de batteries haute tension
  en Allemagne +++ Transformation réussie vers la production E-drive. </p>
<p> </p>
<div>
  <ul>
    <li>BMW Group continues to expand manufacturing capacity at the
      Competence Centre for E-Drive Production in Dingolfing</li>
    <li>E-drive trains for 500,000 electrified vehicles per year from 2022</li>
    <li>Extensive in-house drive train expertise: Start of production
      for fifth-generation high-voltage batteries in Germany</li>
    <li>Successful transformation to e-drive train production</li></ul>
  <p> </p>
  <p>
    <strong>Munich/Dingolfing. </strong>Production of fifth-generation
    high-voltage batteries and battery modules for use in the BMW iX*
    and BMW i4 is now underway at the Competence Centre for E-Drive
    Production in Dingolfing. At the same time, the company is also
    increasing production capacity for its fifth-generation electric
    motor, which has been built in Dingolfing for the BMW iX3* since
    2020 and will also power the BMW iX* and BMW i4. “We expect at least
    50 percent of the vehicles we deliver to our customers worldwide to
    be electrified by 2030. To achieve this, we are relying on our
    extensive in-house drive train expertise: We are increasing capacity
    at existing drive train production locations – like here in
    Dingolfing – and developing capabilities at others – like recently
    in Regensburg and Leipzig,” explained Dr Michael Nikolaides, Senior
    Vice President, Production Engines and E-Drives, BMW Group.</p>
  <p>The BMW Group is investing more than 500 million euros in expanding
    production capacity for e-drives at its Dingolfing location alone
    between 2020 and 2022. From 2022, it will produce e-drives for more
    than half a million electrified vehicles. The BMW Group will invest
    a total of around 790 million euros in expanding capacity for
    electric powertrain components at its Dingolfing, Leipzig,
    Regensburg and Steyr locations between 2020 and 2022.</p>
  <p>Standard production of the BMW iX* will soon get underway at BMW
    Group Plant Dingolfing, followed by production of the BMW i4 at
    Plant Munich in the autumn. The highly integrated e-drives and
    high-voltage batteries for these vehicles will all be manufactured
    at the Competence Centre for E-Drive Production in Dingolfing. The
    BMW Group already began producing battery components at Plants
    Regensburg and Leipzig in April and May 2021. In line with growing
    demand for e-drives, BMW Group Plants Landshut and Steyr are also
    stepping up production of e-drive housings.</p>
  <p> </p>
  <p>
    <strong>Production of fifth-generation BMW eDrive technology</strong></p>
  <p>The output and energy content of drive units and high-voltage
    batteries with fifth-generation BMW eDrive technology can be
    flexibly scaled. This means they can be optimally adjusted to suit
    different model variants.</p>
  <p>Each vehicle uses up to two highly integrated e-drives, which
    combine the electric motor, power electronics and transmission in a
    single housing. Based on the design principle of a current-excited
    rotor, the fifth-generation e-drive does not require any materials
    classified as rare-earth metals.</p>
  <p>BMW eDrive technology also comprises a high-voltage battery with
    state-of-the-art battery cell technology. The BMW Group agreed with
    its suppliers that they will only use renewable green power for
    producing fifth-generation battery cells. The entire high-voltage
    battery boasts outstanding qualities in the areas of performance,
    charging and discharging characteristics, durability and safety. The
    technically standardised production process for battery modules has
    been further developed in such a way that different module variants
    can be produced on the same production line – in line with the
    growing range of electrified vehicle models and performance levels.
    The production systems are highly flexible and scalable. Battery
    modules are produced from supplied prismatic battery cells at the
    respective BMW Group production location. A modular system developed
    in-house allows model-specific high-voltage batteries to be
    manufactured from these modules in a flexible arrangement.</p>
  <p>The company has outstanding expertise and experience, both in the
    field of battery cell technology and in production of model-specific
    high-voltage batteries. The BMW Group conducts basic research in the
    fields of cell chemistry and cell design at its own Battery Cell
    Competence Centre. The BMW Group also produces battery cell
    prototypes itself. These battery cell prototypes are used in tests
    to validate the development maturity of battery cells and to
    demonstrate the effectiveness of the production processes. In
    addition, the prototype production of the battery cells serves the
    identification of process potentials as well as the optimization of
    the production processes. In this way, the BMW Group gains a
    thorough understanding of the entire battery cell value chain and
    the decisive competitive advantages its chemical and technical
    properties offer. This enables battery cells to be manufactured to
    precise specifications that are geared towards each vehicle’s
    individual requirements.</p>
  <p> </p>
  <p>
    <strong>Competence Centre for E-Drive Production</strong></p>
  <p>Following extensive expansion, the Competence Centre for E-Drive
    Production now provides a usable area of 125,000 sq. m. This is
    where the company manufactures electric motors and the components
    needed for them, as well as high-voltage batteries and battery
    modules. A paint coating is also applied to the battery cells at
    this location. The coating increases mechanical robustness and
    thermal conductivity, thereby improving insulation and cooling of
    the even more powerful fifth-generation battery cells.</p>
  <p>Plant Dingolfing has been manufacturing standard high-voltage
    batteries and battery modules since 2013, when the BMW Group's first
    all-electric vehicle, the BMW i3*, went into production. The first
    production lines for electric motors and high-voltage batteries for
    plug-in hybrids went on-stream there in 2014. The Competence Centre
    for E-Drive Production has been steadily growing ever since. The
    plant has also been producing high-voltage batteries for the fully
    electric MINI Cooper SE* since 2019 and, since 2020, also the highly
    integrated fifth-generation e-drive used for the first time in the
    BMW iX3*. Production of the even more powerful high-voltage
    batteries for the BMW iX* and BMW i4 is now getting underway.
    E-drives for future models can also be produced on the flexible
    production lines.</p>
  <p> </p>
  <p>
    <strong>Qualification for long-term, sustainable jobs</strong></p>
  <p>With the BMW Group systematically pursuing progress in
    electromobility, the demands on employees and their areas of
    responsibility are also constantly evolving. “We are growing our
    staff for e-drive production almost exclusively through personnel
    restructuring. We are actively shaping the transformation process
    and leveraging our employees’ skills so we can develop long-term
    sustainable jobs,” explains Nikolaides.</p>
  <p>The Competence Centre for E-Drive Production in Dingolfing
    currently has almost 1,400 employees. By the end of 2021, around
    1,900 employees are expected to work in e-drive production in Dingolfing.</p>
  <p>Production employees receive further training at the in-house
    learning centre, which uses innovative vocational training and
    further education methods to provide employees with intensive
    preparation for their new tasks. Employees’ knowledge and skills are
    being expanded specifically to include new electromobility
    technologies, with a training concept that is constantly updated.
    The training sessions are held in the classroom, at practice
    workstations and directly on the production lines. Digital methods
    and augmented reality play a bigger role here than ever before.
    Thanks to these methods, the training courses were also able to
    continue safely during the coronavirus pandemic, in compliance with
    health and safety measures.</p>
  <p>“The learning centre takes a holistic approach that supports
    employees throughout their professional development and further
    education, from their first day in production,” reports Dr Sven
    Jochmann, head of Production E-Drives Dingolfing, Landshut,
    Regensburg, Leipzig. “As well as trainers and managers, new
    colleagues are also supported by trained mentors who help them
    quickly find their way around their new working environment,” adds Jochmann.</p>
  <p> </p>
  <p>
    <strong>Transformation of the Dingolfing location</strong></p>
  <p>The Dingolfing location is a prime example of the successful
    transformation of the BMW Group plants towards e-mobility and
    digitalisation. E-drive production, including electric motors and
    high-voltage batteries, is located in an existing, roughly
    50-year-old building at the site, rather than using new space. The
    infrastructure was adapted to the new requirements and expanded
    accordingly. A modern staff restaurant seats 300 and there is also a
    new parking deck with space for 800 vehicles. The structural
    measures are rounded out by a 25,000 sq. m. logistics hall, new
    office spaces and social rooms close to the production area, as well
    as an additional plant gate in the south for improved logistics flows.</p>
  <p>On the issue of sustainability, the BMW Group takes a holistic
    approach to reducing CO<sub>2</sub> emissions and minimising
    resource consumption that covers the entire value chain, including
    in-house production, the supply chain and use phase. In Dingolfing,
    as at all BMW Group locations, production uses only green power. In
    addition, all BMW Group locations have been net carbon neutral since
    this year, through corresponding offsets and certificates. The
    company is also using many other levers: from building technology to
    energy-efficient installations to increased use of renewable
    energies. Electric trucks will be used for intra-company goods
    transport at the Competence Centre for E-Drive Production from the autumn.</p>
  <p> </p>
  <p>
    <strong>2030: At least 50 percent of global BMW Group sales will be
      fully electric</strong></p>
  <p>The BMW Group continues its massive electromobility ramp-up: The
    company will offer five fully-electric models by the end of this
    year: the BMW i3*, the MINI Cooper SE* and the BMW iX3*, as well as
    the two main innovation flagships, the BMW iX* and BMW i4.</p>
  <p>Between now and 2025, the BMW Group will increase its sales of
    fully-electric models by an average of well over 50 percent per year
    – more than ten times the number of units sold in 2020. Based on its
    current market forecast, the company also expects at least 50
    percent of its global sales to come from fully-electric vehicles in
    2030. In total, over the next ten years or so, the BMW Group will be
    releasing about ten million fully-electric vehicles onto the roads.</p>
  <p> </p>
  <p>
    <strong>Global e-drive production network with a focus in Germany</strong></p>
  <p>The high-voltage batteries and battery components needed for all
    BMW and MINI electrified vehicles come from the company’s own
    battery factories in Dingolfing, Leipzig and Regensburg in Germany,
    as well as from Spartanburg (USA) and Shenyang (China). The BMW
    Group has also localised production of high-voltage batteries in
    Thailand, at its Rayong plant, and is working with the Dräxlmaier
    Group for this. Munich is home to the e-drive pilot plant and the
    Battery Cell Competence Centre, where the BMW Group is conducting a
    full analysis of battery cell value creation processes and advancing
    technology for its production processes.</p>
  <p>The company produces electric motors at the Competence Centre for
    E-Drive Production in Dingolfing and at BMW Group Plant Landshut.
    BMW Group Plant Steyr builds the housing for the highly integrated
    fifth-generation e-drive.</p></div>
<p> </p><div class="import-contacts-wrapper"><div class="import-contact">Contact presse: Jeroen Lissens<br>Tél: +32-3-890-9708<br>Adresse e-mail: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Research &amp; Development,Drive Technologies,Locations,BMW i,i3,Production,Production Plants,Mobility of the future,Human Resources,G26,iX,i4,i20,Dingolfing,Product,BMW]]></category>
            <pubDate>Wed, 26 May 2021 10:00:00 +0200</pubDate>
            <pp:lastModified>Wed, 26 May 2021 08:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/9d96f54b-f4cf-4237-863e-0e67f9a69298/500_P90423520_highRes_production-of-the-hi.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/9d96f54b-f4cf-4237-863e-0e67f9a69298/500_P90423520_highRes_production-of-the-hi.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/9d96f54b-f4cf-4237-863e-0e67f9a69298/P90423520_highRes_production-of-the-hi.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90423520_highRes_production-of-the-hi.jpg]]></pp:imageTitle></item></channel>
                    </rss>