<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom United Kingdom]]></title>
                    <link>https://newsroom.bmwgroup.com/emea/</link>
                    <description></description>
                    <language>en</language>
                    <lastBuildDate>Fri, 09 Oct 2026 08:10:03 +0200</lastBuildDate>
                    <pubDate>Thu, 02 Apr 2026 10:32:55 +0200</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom United Kingdom]]></title>
                        <url>https://content.presspage.com/clients/150_3240.png</url>
                        <link>https://newsroom.bmwgroup.com/emea/</link>
                        <width>144</width>
                    </image><item>
                        <title>The new BMW Group Plant Munich: More efficient, more flexible and more digital for production of the Neue Klasse</title>
                        <link>https://newsroom.bmwgroup.com/emea/the-new-bmw-group-plant-munich-more-efficient-more-flexible-and-more-digital-for-production-of-the-neue-klasse/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/the-new-bmw-group-plant-munich-more-efficient-more-flexible-and-more-digital-for-production-of-the-neue-klasse/</guid><pp:caseid>788355</pp:caseid><pp:summary><![CDATA[+++ Tradition meets the future: 104 years young and using state of the art technology +++ Series production of new BMW i3 to start in August 2026 +++ More models to follow +++ All electric vehicle plant from 2027 +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Note: This press release is a 1:1 copy of the original issued
    by BMW headquarters in Germany. No adaptions have been made to cater
    to the UK market.<br />
    <br />Munich.</strong> BMW Group Plant Munich is approaching the
  biggest milestone in the transformation process: series production of
  the BMW i3, the second model in the Neue Klasse range, gets underway
  here in August. This marks the start of the rollout of the Neue Klasse
  within the BMW Group’s global production network.</p>
<p>“We have been making rigorous preparations. With the BMW iFACTORY we
  have devised a consistent, strategic framework for our production,”
  explains Milan Nedeljković, Member of the Board of Management of BMW
  AG, Production. “We have paved the way for the upcoming start-ups in
  all our plants and have invested heavily in technologies,
  digitalisation and AI.”</p>
<p>BMW Group Plant Munich has undergone extensive modernisation in
  recent years. The result is a plant that now works even more
  efficiently, flexibly and digitally, and is optimally positioned for
  the requirements of electric mobility and the Neue Klasse.</p>
<p>But that’s not all: as of 2027, the Munich plant will exclusively
  produce all‑electric vehicles and thereby achieve a further boost in
  efficiency. This is assisted by proactive planning, close
  collaboration with development teams and suppliers, as well as modern
  production technology in the new structures. “We have considerably
  reduced production costs over recent years. With the start of
  production of the BMW i3, we will reduce overall production costs at
  the Munich plant by a further 10 per cent, bringing them below the
  level of the current vehicle generation,” says Peter Weber, Head of
  BMW Group Plant Munich. In addition to optimised production processes
  and targeted automation and digitalisation, the new vehicle
  architecture of the Neue Klasse also ensures efficiency.</p>
<p>Plant Munich is investing around 650 million euros in its
  transformation into a fully electric production site.</p>
<p> </p>
<p>
  <strong>Highly efficient production at historic site</strong></p>
<p>Plant Munich has been consistently reinventing itself for more than
  100 years – from a location outside the city to today’s site
  surrounded by it. The facility has undergone a fundamental process of
  redevelopment for the Neue Klasse – with production of up to 1,000
  vehicles a day continuing during this period. A new body shop and
  state-of-the-art vehicle assembly including new logistics areas were
  set up on an area spanning around a third of the plant’s footprint.
  Extensive updates have also been made to existing technologies.</p>
<p>Plant manager Peter Weber highlights what the workforce has achieved:
  “The people at the factory played an essential role in making this
  transformation a success. With their high level of expertise,
  enthusiasm and tremendous dedication, our employees have shown that
  world-class industrial production is possible even under the toughest
  conditions. The BMW i3 is just the beginning – several Neue Klasse
  models will be manufactured in Munich in the future, including the BMW
  i3 Touring.”</p>
<p> </p>
<p>
  <strong>A vision for all technologies: the BMW iFACTORY</strong></p>
<p>The <strong>BMW iFACTORY</strong> focuses on the areas of efficiency,
  sustainability and digitalisation. Within this framework, the
  company’s plants around the world are implementing site-specific
  solutions and, in so doing, strengthening the company’s resilience as
  well as its ability to deliver reliably at any time and worldwide.
  This vision has now also been consistently implemented across
  all technologies at BMW Group Plant Munich.</p>
<p>“We have rethought the entire value stream from supplier to finished
  customer vehicle. We have looked at every single process in detail and
  made optimisations. Now our plant is even more efficient, more
  flexible and even more digitised than ever before. We are thereby
  safeguarding the future viability of the plant,” adds Peter Weber.</p>
<p> </p>
<p>In the <strong>press shop</strong>, steel and aluminium boards are
  turned into tens of thousands of components on highly automated press
  lines daily. Uniform press and tool standards across the global
  production network result in efficiencies on many levels: installation
  and integration of the systems are standardised, tools for the presses
  can be swapped within the network, and employees can work at various
  locations and help each other. An AI-assisted camera system supports
  quality control before an underground transport system moves the parts
  to the body shop. Output has increased significantly compared with
  previous structures. Cuts of steel and aluminium are collected, sorted
  and then used to manufacture new steel or aluminium coils.</p>
<p> </p>
<p>Plant Munich has set up a new <strong>body shop</strong> for the Neue
  Klasse featuring systems planned and realised using a virtual twin. A
  total of 800 new industrial robots take care of the joining processes
  here; decreasing the number of joining processes to five reduces
  process complexity. With an automation rate of around 98 per cent,
  robots perform the majority of standardised processes. Automated
  surface inspection (ASI) assists with quality assurance.</p>
<p> </p>
<p>In the <strong>paint shop</strong> at Plant Munich, digital and
  AI-assisted systems control central quality processes. Automated
  surface inspection (ASI) uses cameras and artificial intelligence to
  detect even the most minor deviations on the surface and documents
  them digitally. Automated surface processing (ASP) works on the
  variations detected directly during the running process. To purify the
  exhaust air, the paint shop uses the energy-efficient, electrically
  powered eRTO process. This is complemented by heat and energy recovery
  as well as water-saving cycles.</p>
<p> </p>
<p>What once was the home of engine manufacturing at BMW Group Plant
  Munich has become a new <strong>assembly</strong>
  <strong> area</strong> for the Neue Klasse. The assembly area is set
  up for end-to-end digital processes: vehicles, systems and tools are
  interconnected and digital live tracking and automated inline quality
  checks support employees in the assembly line process. During assembly
  already, the BMW i3 digitally transmits the status of up to
  20,000 features to the production system. Ergonomic workstations,
  height-adjustable systems and simplified processes lighten the load
  for employees, while targeted training supports new digital fields.</p>
<p>
  <strong> </strong></p>
<p>Aspart of the transformation,<strong> logistics</strong> at BMW Group
  Plant Munich has focused squarely on efficiency and direct integration
  of production. The logistics department at the Munich plant moves
  around 2.5 million parts every day; in future around 70 per cent of
  these parts will be delivered directly to the assembly workstations.
  This will reduce internal transport distances, save space and
  accelerate supply to the production lines. This is made possible by a
  multi-storey building structure developed specially for the plant’s
  city location. Delivery is at ground level and then conveyor
  technology transports the parts to the right levels, where they are
  distributed directly to the assembly workstations. This enables the
  principle of direct delivery to be applied systematically even in a
  multi-storey plant. At the same time, the level of automation in
  logistics has been significantly increased. Automated supply systems,
  smart transport robots and driverless transport systems will handle
  around 60 per cent of supply tasks in the future. A digital logistics
  control station manages all processes centrally, ensuring transparency
  and data-driven optimisation.</p>
<p> </p>
<p>Unique to Plant Munich is the in-house <strong>seat manufacturing
  </strong>facility. It is a “plant inside a plant” and takes on a
  central role for quality assurance and expert evaluation within the
  production network. The seats for all versions of the models produced
  in Munich are manufactured here and delivered to vehicle assembly
  directly and “just in sequence”. The in‑house seat manufacturing
  facility is regarded as the benchmark for quality assurance across the
  BMW Group. Modern, largely automated processes ensure seamless quality
  control. This is complemented by fully automated end-of-line checks,
  including for safety-relevant components. The seat manufacturing
  facility also systematically strengthens the BMW Group’s in-house
  expertise. It serves as a competence centre and innovation hub, tests
  new materials, technologies and manufacturing concepts, and supports
  the evaluation of costs, quality and production processes – making an
  impact far beyond the Munich location.</p>
<p> </p>
<p>
  <strong>Global network, regional value creation: high-voltage batteries</strong>
  <strong> and e-drive</strong></p>
<p>With the new assembly plant for high-voltage batteries in
  Irlbach‑Straßkirchen (Lower Bavaria, Germany) around 90 minutes away,
  the BMW Group is significantly boosting value creation in the Bavaria
  region. In keeping with the “local for local” approach,
  Irlbach-Straßkirchen will deliver high-voltage Gen6 batteries to the
  Munich plant as well as other German locations. Here, the batteries
  will be installed in the BMW i3. Manufacture of the high-voltage
  batteries combines a rigorous zero-defect approach with the latest
  production technologies, which were developed at Bavarian pilot
  plants. With seamless inline quality controls, digital twins and the
  systematic use of artificial intelligence, the BMW Group is setting
  new standards in battery production.</p>
<p>The Gen6 e-motor for the BMW i3 is produced at BMW Group Plant Steyr
  in Austria – a location that has been manufacturing drivetrains for
  over 40 years. With the first e-motor in the portfolio, the plant is
  developing its role as a prime example of technology openness. All
  core components of the highly integrated e-drive – from the rotor and
  stator to the inverter and transmission – are produced on-site. New
  production lines and state‑of‑the‑art clean room environments have
  been set up for this. The aluminium foundry at BMW Group Plant
  Landshut supplies the e-motor housing for Plant Steyr.</p>
<p> </p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: James Morrison<br>Tel: +44-1252-92-1524<br>E-mail: <a href="mailto:james.morrison@bmw.co.uk">james.morrison@bmw.co.uk</a></div></div></div>]]></description><category><![CDATA[Press Kit,Research &amp; Development,Locations,Drive Technologies,Production Plants,Production,Industry 4.0,Digitalisation,Logistics,Supply Chain]]></category>
            <pubDate>Thu, 02 Apr 2026 10:32:55 +0200</pubDate>
            <pp:lastModified>Thu, 02 Apr 2026 08:32:55 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/8e32fa4b-ee89-4cfb-8f0c-0fe432bc6f67/500_P90634415_highRes_bmw-group-plant-muni.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/8e32fa4b-ee89-4cfb-8f0c-0fe432bc6f67/500_P90634415_highRes_bmw-group-plant-muni.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/8e32fa4b-ee89-4cfb-8f0c-0fe432bc6f67/P90634415_highRes_bmw-group-plant-muni.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90634415_highRes_bmw-group-plant-muni.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group builds new Competence Centre Circularity at Wackersdorf site</title>
                        <link>https://newsroom.bmwgroup.com/emea/bmw-group-builds-new-competence-centre-circularity-at-wackersdorf-site/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/bmw-group-builds-new-competence-centre-circularity-at-wackersdorf-site/</guid><pp:caseid>788375</pp:caseid><pp:summary><![CDATA[+++ BMW Group Recycling and Dismantling Centre (RDC) set to become  Competence Centre Circularity +++ Strengthening the circular economy,  resource efficiency and technology development +++ Clear signal for the future  of the Wackersdorf location +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Note: This press release is a 1:1 copy of the original issued
    by BMW headquarters in Germany. No adaptions have been made to cater
    to the UK market.    </strong></p>
<p>
  <strong>Munich/Wackersdorf.</strong> The BMW Group is relocating its
  Recycling and Dismantling Centre (RDC) from Unterschleißheim to the
  company’s Wackersdorf site, with a significant expansion. At the new
  location, a technologically state-of-the-art competence centre for
  circularity is being built, advancing vehicle dismantling and
  recycling expertise for the future. Commissioning is scheduled for
  early 2029.</p>
<p>“The circular economy is a key element of the BMW Group’s corporate
  strategy,” says Jörg Lederbauer, Vice-President Circular Economy,
  Spare Parts Supply High Voltage Battery and Electric Powertrain at the
  BMW Group. “Our new competence centre in Wackersdorf will be a core
  component of our circular value chain and will help make the mobility
  of the future more resource efficient. We want to find the best way to
  keep materials in the cycle, ensuring that resources retain their
  value for further use in the long term. This will also reduce our
  dependence on primary raw materials. At the same time, the use of
  high-quality secondary materials will continue to significantly lower
  our vehicles’ carbon footprint.”</p>
<p>For more than 30 years, at its current location in Unterschleißheim,
  near Munich, the BMW Group Recycling and Dismantling Centre (RDC) has
  developed methods aimed at achieving significant advances in the
  recycling of parts and the recovery of materials, and has tested them
  in practice. The insights gained by the RDC into the recyclability of
  components and materials, in line with Design for Circularity
  principles, are already incorporated into product development at the
  BMW Group. These insights also feed into the cooperation with PreZero,
  which the BMW Group recently entered into in order to leverage the
  strategic and economic potential of the circular economy in
  end‑of‑life vehicle recycling. </p>
<p>The recycling industry’s global network also benefits from the work
  of the RDC. Around 3,000 businesses in 32 countries rely on a shared
  recycling database for information on how recyclable components can be
  disassembled cost-effectively and valuable materials efficiently recovered.</p>
<p>At the future site, process, material and technology development will
  be even more closely integrated with vehicle recycling operations. The
  new scope of activities at the Competence Centre Circularity includes
  the recycling of hydrogen vehicles, automation of dismantling
  processes and development of expertise in innovative shredding and
  sorting technologies.</p>
<p>The BMW Group sees Wackersdorf as the ideal new location for the
  Competence Centre Circularity, with BMW Group Plant Wackersdorf having
  embodied flexibility for decades: Housing cockpit production, the
  Rolls-Royce door and flap production centre, parts supply for overseas
  plants and the battery testing centre, the site has wide-ranging
  expertise and is firmly established within the BMW Group network.</p>
<p>“In recent years, the company has set a decisive course for the
  future of the Wackersdorf location. Throughout this process, the
  entire plant team has consistently demonstrated flexibility. Building
  the competence centre for circularity here provides our site with a
  broader foundation. In this way, we are tapping into an attractive,
  future-oriented area of activity,” says Stefan Betz, head of BMW Group
  Plant Wackersdorf.</p>
<p>“The company is systematically continuing its successful
  transformation. Establishing the new Competence Centre Circularity
  here represents an important strategic decision by the company in
  favour of the Wackersdorf location – and, above all, its employees. As
  employee representatives, we also supported this,” says André Mandl,
  Works Council Chairman for BMW Group Plants Regensburg and Wackersdorf.</p>
<p>“In Wackersdorf, BMW has been a strong partner by our side for many
  decades. We are delighted that the BMW Group is reaffirming its
  commitment to the location with this move. It sends a clear signal for
  our site and for sustainable future technologies,” says Thomas Falter,
  Mayor of Wackersdorf.</p>
<p>“The cutting-edge Competence Centre Circularity will make a major
  contribution to regional value creation and further development of the
  circular economy,” adds Thomas Ebeling, District Administrator of
  Schwandorf District. “In combination with the trechnology transfer
  centre planned for Wackersdorf by the Regensburg University of Applied
  Sciences and the University of Applied Sciences Amberg Weiden, close
  integration of business and academia on the circular economy will now
  also be possible. In this way, we are strengthening the region.”</p>
<p>Following the location decision, the detailed planning phase for the
  Competence Centre Circularity at the new site can now begin. The
  existing RDC in Unterschleißheim will remain fully operational until
  the relocation. The BMW Group will provide further information on the
  next steps in due course.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Helen Wilson<br>Tel: +44-1252-92-1928<br>E-mail: <a href="mailto:helen.wilson@bmw.co.uk">helen.wilson@bmw.co.uk</a></div></div></div>]]></description><category><![CDATA[Press Release,Research &amp; Development,Sustainability,Production,Environment,Logistics,Supply Chain,Circular Economy,Wackersdorf]]></category>
            <pubDate>Thu, 26 Mar 2026 08:00:00 +0100</pubDate>
            <pp:lastModified>Thu, 26 Mar 2026 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/4549be49-eeef-4054-9844-b2bf17ff3db9/500_P90633314_highRes_wackersdorf-03-2026-.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/4549be49-eeef-4054-9844-b2bf17ff3db9/500_P90633314_highRes_wackersdorf-03-2026-.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/4549be49-eeef-4054-9844-b2bf17ff3db9/P90633314_highRes_wackersdorf-03-2026-.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90633314_highRes_wackersdorf-03-2026-.jpg]]></pp:imageTitle></item></channel>
                    </rss>