<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Belux]]></title>
                    <link>https://newsroom.bmwgroup.com/emea/de-lu/</link>
                    <description></description>
                    <language>de-lu</language>
                    <lastBuildDate>Tue, 06 Oct 2026 07:55:13 +0200</lastBuildDate>
                    <pubDate>Fri, 27 Feb 2026 15:10:00 +0100</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom Belux]]></title>
                        <url>https://content.presspage.com/clients/150_3240.png</url>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/</link>
                        <width>144</width>
                    </image><item>
                        <title>BMW Group to deploy humanoid robots in production in Germany for the first time</title>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/bmw-group-to-deploy-humanoid-robots-in-production-in-germany-for-the-first-time-de-lu/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/de-lu/bmw-group-to-deploy-humanoid-robots-in-production-in-germany-for-the-first-time-de-lu/</guid><pp:caseid>815312</pp:caseid><pp:summary><![CDATA[+++ BMW Group bringing Physical AI to Europe +++ Pilot project at BMW Group Plant Leipzig +++ New “Center of Competence for Physical AI in Production” accelerates global integration of AI and robotics in production +++ First pilot deployment of humanoid robots successfully completed at BMW Group Plant Spartanburg, USA +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Munich.</strong> The BMW Group is consistently advancing the
  digitalisation and use of artificial intelligence in production. A key
  element in this effort is “Physical AI”, which combines digital
  artificial intelligence (AI) with real machines and robots. This
  enables intelligent systems such as humanoid robots to be integrated
  into real-world production processes.</p>
<p>For the first time, the BMW Group is now bringing Physical AI to
  Europe and launching a pilot project with humanoid robots at the
  Leipzig plant. The project aims to integrate humanoid robotics into
  existing series production of cars and to explore further applications
  in the production of batteries and components.</p>
<p>“Digitalisation improves the competitiveness of our production – here
  in Europe and worldwide. The symbiosis of engineering expertise and
  artificial intelligence opens up entirely new possibilities in
  production,” said Milan Nedeljković, Member of the Board of Management
  of BMW AG, Production.</p>
<p>Last year, the BMW Group successfully implemented a pilot project
  with humanoid robots at its Spartanburg plant in the United States.
  The insights gained from this project are being leveraged to further
  develop and scale Physical AI applications.</p>
<p> </p>
<p>
  <strong>Unified IT and data model in the production system</strong></p>
<p>Artificial intelligence is already an integral part of the BMW
  Group’s production system. From the virtual factory with digital twins
  and AI‑enabled quality controls to intralogistics with autonomous
  transport solutions, intelligent systems are used in almost all
  production steps.</p>
<p>A prerequisite for the effective use of artificial intelligence in
  production is a unified IT and data model across the entire production
  system. The BMW Group has consistently transformed isolated data silos
  into a unified data platform in its production system meaning that all
  data is consistent, standardised, and available at all times. This
  enables digital AI agents to take on increasingly challenging tasks
  autonomously and in complex environments while continuously learning
  and becoming available for additional areas of application. The
  introduction of intelligent and autonomous decision‑making agents
  marks a paradigm shift in production. In combination with robots,
  these digital AI agents are what make up Physical AI.</p>
<p>“Our aim is to be a technology leader and to integrate new
  technologies into production at an early stage. Pilot projects help us
  to test and further develop the use of Physical AI – that is,
  AI‑enabled robots capable of learning – under real-world industrial
  conditions,” said Michael Nikolaides, Senior Vice President Production
  Network, Supply Chain Management at BMW Group.</p>
<p>Digitalisation and artificial intelligence are core elements of BMW
  iFACTORY and are the foundation for future‑proof, flexible, and
  competitive production.</p>
<p> </p>
<p>
  <strong>Humanoid robotics complements existing automation</strong></p>
<p>The BMW Group is strategically expanding its automation portfolio to
  include Physical AI and humanoid robotics. Humanoid robots are viewed
  as a value‑adding complement to existing automation. Particularly,
  they demonstrate potential in monotonous, ergonomically demanding, or
  safety‑critical tasks. The goal is to relieve employees and further
  improve working conditions.</p>
<p> </p>
<p>
  <strong>Center of Competence for Physical AI in Production
    consolidates expertise</strong></p>
<p>Its consistent data platform in production makes the BMW Group an
  attractive partner for technology companies seeking to test the
  possibilities of Physical AI – particularly humanoid robotics – in an
  industrial environment under real-world conditions. By setting up the
  new “Center of Competence for Physical AI in Production”, the BMW
  Group is taking the next step in consolidating its expertise and
  ensuring that the full range of knowledge can be leveraged across the organisation.</p>
<p>The BMW Group is following a clearly structured approach. Technology
  partners are evaluated according to defined maturity and
  industrialisation criteria and tested in pilot projects under
  real-world production conditions. Following a theoretical assessment,
  an evaluation is carried out at the manufacturer’s site in the
  laboratory using real use cases from the BMW production system to test
  integration capability. If this phase is successful, it is followed by
  an initial test deployment under real-world production conditions at a
  BMW Group plant and subsequently the actual pilot phase.</p>
<p> </p>
<p>
  <strong>First pilot project with humanoid robots in Europe</strong></p>
<p>In collaboration with Hexagon, a long‑standing, established partner
  of the BMW Group in the field of sensor technology and software, the
  first pilot project in Europe is now underway. Hexagon’s
  organisational unit located in Zürich, Hexagon Robotics, specialises
  in Physical AI and presented its first humanoid robot, AEON, in June
  2025. Following an initial theoretical evaluation phase and successful
  laboratory tests, there was an initial test deployment at
  BMW Group Plant Leipzig in December 2025. A further test deployment is
  planned from April 2026 to ensure full integration for the actual
  pilot phase starting in summer 2026.</p>
<p>The deployment in Leipzig is focusing on testing a multifunctional
  application of the robot. It is based on AEON’s design, whose
  human‑like body allows a wide range of hand and gripper elements or
  scanning tools to be flexibly attached and enables dynamic use on
  wheels. During testing and later in the pilot phase, the robot will be
  used in the assembly of high‑voltage batteries and in component manufacturing.</p>
<p> </p>
<p>
  <strong>Successful pilot at BMW Group Plant Spartanburg provides key
    insights for use of humanoid robots in production</strong></p>
<p>The world’s first deployment of humanoid robots at a BMW Group plant
  took place at the Spartanburg plant in the United States in 2025, in
  collaboration with the technology company Figure AI. The results
  demonstrated that Physical AI can deliver measurable added value under
  real-world conditions. Within ten months, the robot Figure 02
  supported the production of more than 30,000 BMW X3, working ten-hour
  shifts daily from Monday to Friday. Figure 02 handled the precise
  removal and positioning of sheet metal parts for the welding process –
  a task that is particularly demanding in terms of speed and accuracy
  while also being physically exhausting. In total, it moved more than
  90,000 components and covered approximately 1.2 million steps in
  around 1,250 operating hours.</p>
<p>The pilot confirmed that humanoid robots can safely perform precise,
  repetitive work steps – such as positioning components with millimetre
  precision – and provided important insights for the further deployment
  of Physical AI in production.</p>
<p>During the initial test phases with Figure 02, it was essential to
  involve all areas of the production IT infrastructure, occupational
  safety, production process management, and shop floor logistics at an
  early stage.</p>
<p>One key finding was that the transition from the laboratory to the
  actual production environment was faster than expected. Motion
  sequences trained in the laboratory could be quickly transferred into
  stable shift operation. To ensure smooth coexistence with existing
  systems, integration into the BMW Smart Robotics ecosystem was
  implemented via standardised interfaces.</p>
<p>The body shop was deliberately selected for the test phase in
  Spartanburg, as it already has a high degree of automation. BMW Group
  employees in this area have extensive experience in integrating new
  technologies and processes. For example, material supply on the line
  is already carried out almost exclusively via automated smart
  transport robots (STR). The project team’s early communication ensured
  transparency from the outset and promoted acceptance. The deployment
  of humanoid robots was met with great interest among employees and
  quickly became a natural part of everyday work during the course of
  the project.</p>
<p>The BMW Group and Figure are currently evaluating additional use
  cases for deploying the Figure 03 robot.</p>
<p> </p>
<p>
  <strong>Additional quotes for use:</strong></p>
<p> </p>
<p>
  <strong>Michael Nikolaides, Senior Vice President Production Network,
    Supply Chain Management at BMW Group:</strong></p>
<p>“Our aim is to be a technology leader and to integrate new
  technologies into production at an early stage. Pilot projects help us
  to test and further develop the use of Physical AI – that is,
  AI‑enabled robots capable of learning – under real-world industrial
  conditions. The successful first deployment of humanoid robots at our
  BMW Group plant in Spartanburg in the USA proves that a humanoid robot
  can function not only under controlled laboratory conditions but also
  in an existing automotive manufacturing environment.”</p>
<p> </p>
<p>
  <strong>Michael Ströbel, Head of Process Management and
    Digitalisation, Order to Delivery at BMW Group:</strong></p>
<p>“We are delighted to deploy a humanoid robot for the first time in a
  pilot project at a plant in Germany. Following evaluation by our
  Center of Competence for Physical AI in Production, tests were carried
  out in the laboratory and at Plant Leipzig at the end of last year.
  This year, our focus is on step‑by‑step integration into our
  production system to explore a wide range of applications. The
  emphasis is on researching multifunctional use of the robot in various
  production areas such as battery manufacturing for energy modules and
  component production for exterior parts. With Hexagon, we have found a
  proven long‑standing partner with a highly innovative approach to
  humanoid robotics for this project.”</p>
<p> </p>
<p>
  <strong>Felix Haeckel, Team Lead CoC Physical AI for Production:</strong></p>
<p>“At our new Center of Competence for Physical AI in Production, we
  are pooling our expertise to make knowledge on AI and robotics widely
  usable within the company. In recent years, we have built up an
  international team of experts that, in addition to in‑house research
  and programming, is dedicated to the gradual integration of AI into
  the existing production system. At the same time, our team in Munich
  is driving its own robotics research to set up, support, and further
  develop pilot projects in the field of Physical AI at our plants.”</p>
<p> </p>
<p>
  <strong>Arnaud Robert, President of Hexagon Robotics:</strong></p>
<p>“We are very pleased to be working with the BMW Group to advance the
  use of humanoid robots in real‑world environments.”</p><div class="import-contacts-wrapper"><div class="import-contact">Pressekontakt: Jeroen Lissens<br>Tel: +32-3-890-9708<br>E-Mail Adresse: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Research &amp; Development,Locations,Production Plants,Leipzig,Spartanburg,Innovation,Artificial Intelligence]]></category>
            <pubDate>Fri, 27 Feb 2026 15:10:00 +0100</pubDate>
            <pp:lastModified>Fri, 27 Feb 2026 14:10:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/f81abf29-a301-4ab2-a06b-d10b2293a0ef/500_P90630889_highRes_humanoid-robotics-at.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/f81abf29-a301-4ab2-a06b-d10b2293a0ef/500_P90630889_highRes_humanoid-robotics-at.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/f81abf29-a301-4ab2-a06b-d10b2293a0ef/P90630889_highRes_humanoid-robotics-at.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90630889_highRes_humanoid-robotics-at.jpg]]></pp:imageTitle></item><item>
                        <title>Jubiläum: 20 Jahre Serienproduktion im BMW Group Werk Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/jubilaeum-20-jahre-serienproduktion-im-bmw-group-werk-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/de-lu/jubilaeum-20-jahre-serienproduktion-im-bmw-group-werk-leipzig/</guid><pp:caseid>815143</pp:caseid><pp:summary><![CDATA[+++ Produktionsstart am 1. März 2005 mit BMW 3er Limousine +++ Seitdem rund 3,75 Millionen Fahrzeuge produziert +++ Innovationsstärke und Flexibilität zeichnen das Werk aus +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Am 1. März 2005 startete im BMW Group Werk
  Leipzig die Serienproduktion mit der BMW 3er Limousine der fünften
  Generation. Vier Jahre zuvor, im Juli 2001, hatte die BMW Group
  verkündet, in Leipzig ein neues Fahrzeugwerk zu bauen. Aus über 250
  Bewerbungen wurde der sächsische Standort damals ausgewählt. Seitdem
  wurden rund 3,75 Millionen Fahrzeuge gefertigt und das Werk
  kontinuierlich ausgebaut und weiterentwickelt. Über fünf Milliarden
  Euro hat die BMW Group bislang investiert und setzt auch in Zukunft
  auf die Flexibilität des Standorts.</p>
<p>Aktuell entstehen im BMW Group Werk Leipzig auf einer
  Produktionslinie vier Modelle mit drei Antrieben von zwei Marken: der
  BMW 1er, der BMW 2er Active Tourer (auch als Plug-in-Hybrid), das BMW
  2er Gran Coupé sowie der MINI Countryman mit vollelektrischem und
  konventionellem Antrieb. Bei der Planung des Werks wurde die
  Produktion auf 650 Einheiten pro Tag kalkuliert. 20 Jahre später liegt
  die Zahl der möglichen Einheiten pro Tag bei bis zu 1.300 Stück. Seit
  2005 gab es 20 Produktanläufe mit BMW und MINI Fahrzeugen „made in Leipzig“.</p>
<p>
  <strong>Außergewöhnliche Architektur und flexible Strukturen</strong></p>
<p>In den 20 Jahren seines Bestehens hat das Leipziger Werk eine ganze
  Reihe von Maßstäben gesetzt und Meilensteine erlebt. Bereits die
  Architektur des Zentralgebäudes beeindruckt bis heute. Das Gebäude der
  renommierten irakisch-britischen Architektin Zaha Hadid wurde im
  Eröffnungsjahr 2005 mit dem Deutschen Architekturpreis ausgezeichnet.
  Es ist Herzstück und Verbindungselement des Werks, durch das die
  Fahrzeuge während ihres Fertigungsprozesses auf spektakuläre Weise
  durch die Bürobereiche gleiten.</p>
<p>Auch die flexiblen Strukturen der Werkshallen bewähren sich bis heute
  in den verschiedenen Ausbaustufen des Werks. In Leipzig entstand zum
  Beispiel weltweit erstmals ein Montagegebäude mit einer Fingerstruktur
  für ideale Logistiklösungen und flexible Anpassungsmöglichkeiten.
  Diese Fingerstruktur wurde eigens für das Werk Leipzig entwickelt. Sie
  ermöglicht den Transport der Zulieferteile und vormontierten Module
  per LKW direkt an die Montagebänder und lässt Erweiterungen und
  die Integration neuer Montageschritte zu, ohne komplett neu bauen zu
  müssen. Aktuell werden erneut verschiedene Erweiterungsmaßnahmen auf
  dem rund 240 Hektar großen Werksareal umgesetzt.</p>
<p>Seit 20 Jahren stellt das Leipziger Werk seine enorme Wandlungs- und
  Anpassungsfähigkeit mit neuen Produkten, Prozessen und Technologien
  unter Beweis und spielt im weltweiten Produktionsnetzwerk der BMW
  Group oft eine Pionierrolle. Der erste Ausbau des Werks begann mit der
  Erweiterung um ein Presswerk. 2009 wurde es mit der weltweit ersten
  Highspeed-Servopresse in Betrieb genommen, die Pressteile in einer bis
  dahin nicht gekannten Geschwindigkeit und Effizienz herstellen kann.
  Bis 2014 wurden drei weitere Großpressen und zwei Coilanlagen zur
  Fertigung von Karosserie-bauteilen installiert und damit der
  Vollausbau des Presswerks abgeschlossen.</p>
<p>
  <strong>Pionierwerk der Elektromobilität </strong></p>
<p>Besonders prägend für das Werk war die Entscheidung der BMW Group,
  das erste vollelektrische Fahrzeug am Standort Leipzig zu bauen. Damit
  wurde das sächsische Werk zur Geburtsstätte der Elektromobilität bei
  der BMW Group. Von 2013 bis 2022 wurden mehr als 250.000 Exemplare des
  rein elektrisch angetriebenen BMW i3 produziert. Weltweit erstmalig
  wurde in diesen Fahrzeugen Karbon in Serie verbaut. 2014 folgte die
  Produktion des BMW i8 als erstes Plug-in-Hybrid-Modell der BMW Group.
  Sein futuristisches, preisgekröntes Design und seine zukunftsweisenden
  Technologien machen den BMW i8 zu einer Sportwagen-Ikone. Nach 20.500
  gebauten Einheiten – seit 2018 gab es den BMW i8 auch als Roadster –
  endete 2020 diese Ära im Leipziger Werk.</p>
<p>Die Kompetenz auf dem Gebiet der Elektromobilität wird jedoch weiter
  genutzt. 2021 begann die Produktion von E-Komponenten für die
  Hochvoltbatteriefertigung. Zunächst wurde mit der Fertigung von
  Batteriemodulen für das Produktionsnetzwerk der BMW Group gestartet.
  Innerhalb von vier Jahren kamen weitere Produktionsschritte und
  -linien hinzu. Seit dem Produktionsstart des MINI Countryman Electric
  im März 2024 wird am Standort Leipzig der gesamte Prozess der
  Hochvoltbatteriefertigung der 5. Generation abgebildet mit fünf
  Zelllackierungs-, drei Modulfertigungslinien und zwei Linien für die
  Hochvoltbatterieproduktion. Mit den Hochvoltbatterien wird der MINI
  Countryman Electric versorgt sowie weitere vollelektrische BMW Modelle
  an anderen BMW Group Standorten.</p>
<p>
  <strong>Vom Heckantrieb zum Frontantrieb</strong></p>
<p>Neben dem BMW i8 markierte 2014 der Produktionsstart des BMW 2er
  Active Tourer der ersten Generation den Beginn einer weiteren
  entscheidenden Veränderung im Leipziger Werk. Dieses Fahrzeug, der
  erste BMW mit Frontantriebsarchitektur, ebnete den Weg für diese
  Antriebstechnologie auf den Leipziger Produktionsbändern. Dank der
  Flexibilität des Werks lief der Sports Activity Tourer zusammen mit
  den Heckantriebsmodellen der BMW 1er und 2er Reihe sowie dem BMW X1
  der ersten Generation über eine Fertigungslinie.</p>
<p>Um das neue Modell zu integrieren, waren in Lackiererei und Montage
  lediglich geringe Anpassungsmaßnahmen notwendig. Nur im Karosseriebau
  kam aufgrund der neuen Fahrzeugarchitektur und des
  Frontantriebkonzepts ein separater Fertigungsbereich hinzu. Rund
  eineinhalb Jahre später startete die Produktion eines Modells mit
  Plug-in Hybrid-Antrieb. Wie der BMW i8 verfügte der BMW 225xe über
  einen kombinierten Antrieb mit einem Verbrennungs- und Elektromotor.
  Auch sein Nachfolger, der BMW Active Tourer der zweiten Generation,
  wird seit 2021 im Werk Leipzig mit Verbrennungsmotoren oder als
  Plug-in Hybrid gebaut. 2021endete mit dem Auslauf der Modelle BMW 2er
  Coupé, BMW 2er Cabrio und BMW M2 die Ära der Heckantriebs-Modelle im
  Leipziger Werk.</p>
<p>Der Bau des MINI Countryman ist für das Leipziger Werk ein weiteres
  Alleinstellungsmerkmal im Produktionsverbund. Innerhalb der BMW Group
  ist Leipzig das einzige Vollwerk, das Fahrzeuge der Marken BMW und
  MINI gemeinsam auf einem Band produziert.</p>
<p>
  <strong>Wichtiger Arbeitgeber in der Region</strong></p>
<p>Mit aktuell rund 6.800 BMW Mitarbeitenden und über 11.000
  Beschäftigten am Standort ist das BMW Group Werk Leipzig ein
  bedeutender Wirtschaftsfaktor und Arbeitgeber in der Region. Gestartet
  wurde zu Produktionsbeginn mit rund 2.600 BMW Mitarbeitenden.
  Mittelfristig wurde damals mit rund 5.500 Arbeitsplätzen am neuen
  Werksstandort gerechnet.</p>
<p>Nach der Entscheidung für den Standort Leipzig 2001 waren
  Begeisterung und Zuspruch in der Region enorm. Die Anzahl an Bewerbern
  war riesig: Bereits am Tag nach der Bekanntgabe der Standortverkündung
  gingen über 4.000 Anrufe in einem eigens eingerichteten Callcenter ein
  und körbeweise Post wurde in den ersten Tagen angeliefert. Im
  September 2001 erhielten 35 Auszubildende als Erste einen
  Arbeitsvertrag für das BMW Group Werk Leipzig. Rund 1.100 Azubis hat
  das Werk seitdem ausgebildet. Mit der</p>
<p>Eröffnung des Talent Campus im vergangenen Jahr, der die
  Räumlichkeiten für die Aus- und Weiterbildung nun in einem Gebäude auf
  dem Werksgelände vereint, sind optimale Voraussetzungen für die
  Qualifizierung der Mitarbeitenden im Leipziger Werk geschaffen.</p>
<p>Das erhöhte Produktionsvolumen durch die Fertigung des MINI
  Countryman sorgte 2024 für eine weitere Neuerung: Erstmals in der
  Geschichte des Werks wurde in der Montage eine Nachtschicht
  eingeführt. Nun werden in drei Schichten rund um die Uhr BMW und MINI
  Fahrzeuge gebaut. Die zusätzliche Schicht war mit der Einstellung von
  rund 900 zusätzlichen Mitarbeitenden verbunden.  </p>
<p>
  <strong>Zukunftsorientiertes Energiemanagement</strong></p>
<p>Effiziente und nachhaltige Prozesse spielten bei der Planung des
  Leipziger BMW Werks eine entscheidende Rolle – und das nicht nur bei
  der Fahrzeugproduktion, sondern auch bei der Energieversorgung. Zu den
  Wahrzeichen des Werks gehören die vier weithin sichtbaren Windräder,
  die die Produktion seit 2013 mit Grünstrom versorgen. Die Windräder
  haben eine Leistung von insgesamt 10 Megawatt und produzieren ca. 26
  Gigawattstunden Strom aus Windenergie pro Jahr. Das deckt etwa 15
  Prozent des gesamten Strombedarfs des Werks ab.</p>
<p>Ergänzend kann das Werk Strom in einer Speicherfarm
  zwischenspeichern, die 2017 auf dem Werksgelände ihren Betrieb
  aufnahm. Dort kommen bis zu 700 Hochvoltbatterien aus BMW i3
  Fahrzeugen zu ihrem zweiten Einsatz. Die Anlage kann damit das lokale
  Energiemanagement optimieren oder zur Netzstabilisierung des
  Stromnetzes beitragen.</p>
<p>Mit Blick in die Zukunft setzt das BMW Group Werk Leipzig auf
  Wasserstoff als Energieträger. Verfolgt wird die Vision einer
  weitgehenden Dekarbonisierung der Produktion, also das Ersetzen von
  fossilen Brennstoffen durch Wasserstoff. Voraussetzung dafür ist eine
  ausreichende leitungsgebundene Verfügbarkeit. Für das Werk Leipzig
  bietet sich die Chance, ein in der Region entstehendes Wasserstoffnetz
  dafür zu nutzen.</p>
<p>Beim Einsatz von Wasserstoff in der internen Werkslogistik hat das
  Leipziger Werk seit über einem Jahrzehnt Erfahrungen und nimmt eine
  Vorreiterrolle in der Automobilindustrie ein. 2013 wurde die erste
  Indoor-Wasserstoff-Tankstelle Deutschlands errichtet, inzwischen sind
  es fünf Stück. Dort werden Gabelstapler und Routenzüge für die
  Intralogistik betankt. Die Flotte mit über 200
  Brennstoffzellen-betriebenen Flurförderfahrzeugen zählt zu den größten
  in Europa.</p>
<p>Zudem setzt das Werk als weltweit erstes Automobilwerk in der
  Lackiererei eine neu entwickelte bivalente Brennertechnologie ein, die
  entweder Erdgas oder Wasserstoff nutzen kann. Die Umstellung der
  Brennstoffe ist sogar im laufenden Betrieb möglich. Fünf Brenner, die
  beim Trocknen der Kontrastdächer für die Modelle MINI Countryman, BMW
  1er und BMW 2er Gran Coupé im Einsatz sind, können mit Erdgas oder
  Wasserstoff betrieben werden. Weitere sechs Brenner in der PVC
  Trocknung der Lackiererei wurden zur bivalenten Nutzung mit
  Wasserstoff oder Erdgas ebenfalls bereits ausgetauscht. </p>
<p>Aktuell bereitet sich das BMW Group Werk Leipzig mit Erweiterungs-
  und Umbaumaßnahmen auf die Produktion zukünftiger Modelle vor – mit
  Blick auf die nächsten 20 Jahre Werksgeschichte.</p>
<p> </p>
<p>
  <strong>Die wichtigsten Meilensteine des BMW Group Werk Leipzig im Überblick</strong>:</p>
<ul>
  <li>
    <strong>2001</strong> Entscheidung für Leipzig als neuen Werksstandort</li>
  <li>
    <strong>2002 </strong>Auswahl des Architektur-Entwurfs von Zaha
    Hadid zur Realisierung des Zentralgebäudes und erster Spatenstich</li>
  <li>
    <strong>2003 </strong>Grundsteinlegung für das Zentralgebäude und Richtfest</li></ul>
<ul>
  <li>
    <strong>2005</strong> Start der Serienproduktion mit der BMW 3er
    Reihe, offizielle Werkseröffnung und Gewinn des Deutschen
    Architekturpreises für das Zentralgebäude</li>
  <li>
    <strong>2007 </strong>Anlauf BMW 1er 3-Türer und BMW 1er Coupé</li>
  <li>
    <strong>2009</strong> 500.000stes Fahrzeug, Anlauf des BMW X1 der
    ersten Generation und Eröffnung Presswerk mit weltweit erster Highspeed-Servopresse</li>
  <li>
    <strong>2011</strong> 1.000.000ster BMW aus Leipzig</li></ul>
<ul>
  <li>
    <strong>2013</strong> Inbetriebnahme der vier Windräder und Start
    der BMW i3 Produktion, weltweit erster Einsatz von Karbon in der Serienproduktion</li>
  <li>
    <strong>2014</strong> Start der BMW i8 Produktion, Erweiterungen für
    den Bau des BMW 2er Active Tourer (erster BMW mit Frontantrieb) und
    Ausbau Presswerk</li>
  <li>
    <strong>2016</strong> 2.000.000ster BMW aus Leipzig</li>
  <li>
    <strong>2018</strong> Ausbau des Werks </li>
  <li>
    <strong>2021</strong> 3.000.000ster BMW aus Leipzig, Start der Batteriemodulproduktion</li>
  <li>
    <strong>2022 </strong>Auslauf BMW i3</li>
  <li>
    <strong>2023</strong> Produktionsstart MINI Countryman</li>
  <li>
    <strong>2024</strong> Produktionsstart von drei Modellen (MINI
    Countryman Electric, BMW 1er der vierten Generation und BMW 2er Gran
    Coupé der zweiten Generation) sowie Start der Nachtschicht in der Montage </li></ul>
<p> </p>
<table border="1" cellpadding="0" cellspacing="0" style="border-collapse: collapse;width: 103.457%;height: 698.6px;" width="65%">
  
    <tr style="height: 49.0px;">
      <td colspan="3" nowrap="nowrap" style="width: 99.903%;"><p>
          <strong>Alle BMW Modelle produziert im BMW Group Werk Leipzig</strong></p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;"><p>
          <strong>Modell</strong></p></td><td nowrap="nowrap" style="width: 38.5506%;"><p>
          <strong>Produktionszeitraum</strong></p></td><td nowrap="nowrap" style="width: 18.9137%;"><p>
          <strong>Stückzahl</strong></p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;"><p>
          <strong>BMW 3er Limousine </strong>E90</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2005
          - 2009</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>333.427</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 1er Dreitürer </strong>E81</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2007
          - 2011</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>187.263</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 1er Coupé </strong>E82</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2007 -
        2013</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>130.205</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 1er Cabrio </strong>E88</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2007
          - 2013</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>131.664</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW X1 </strong>E84</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2009 -
        2015</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>635.194</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 1er M Coupé </strong>E82</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2011
          - 2012</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>6.342</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 1er Fünftürer </strong>F20</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2012
          - 2019</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>424.111</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 2er Coupé </strong>F22</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2013 -
        2021</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>165.224</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW i3 </strong>i01</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2013 -
        2022</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>250.271</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW i8 </strong>i12</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2014 -
        2020</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>16.581</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 2er Active Tourer </strong>F45</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2014
          - 2021</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>368.503</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 2er Cabrio </strong>F23</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2014
          - 2021</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>119.092</p></td></tr>
    <tr style="height: 29.8px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW M2 </strong>F87</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2015 -
        2021</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>61.856</p></td></tr>
    <tr>
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW i8 Roadster </strong>i15</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2018
          - 2020</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>3.884</p></td></tr>
    <tr style="height: 30.6px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 1er Fünftürer </strong>F40</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2019
          - 2024</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>442.859</p></td></tr>
    <tr style="height: 30.6px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 2er Gran Coupé </strong>F44</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2019
          - 2024</p></td><td style="width: 18.9137%;"><p>220.795</p></td></tr>
    <tr style="height: 31.6px;">
      <td nowrap="nowrap" style="width: 42.4388%;" valign="bottom"><p>
          <strong>BMW 2er Active Tourer</strong> U06</p></td><td nowrap="nowrap" style="width: 38.5506%;" valign="bottom"><p>2021
          - *</p></td><td nowrap="nowrap" style="width: 18.9137%;" valign="bottom"><p>103.390</p></td></tr>
    <tr style="height: 20.0px;">
      <td style="width: 42.4388%;"><p>
          <strong>MINI Countryman</strong> U25</p></td><td style="width: 38.5506%;"><p>2023 - *</p></td><td style="width: 18.9137%;"><p>95.150</p></td></tr>
    <tr style="height: 20.0px;">
      <td style="width: 42.4388%;"><p>
          <strong>BMW 1er Fünftürer </strong>F70</p></td><td style="width: 38.5506%;"><p>2024 - *</p></td><td style="width: 18.9137%;"><p>41.817</p></td></tr>
    <tr style="height: 20.0px;">
      <td style="width: 42.4388%;"><p>
          <strong>BMW 2er Gran Coupé </strong>F74</p></td><td style="width: 38.5506%;"><p>2024 - *</p></td><td style="width: 18.9137%;"><p>4.109</p></td></tr>
    <tr style="height: 29.8px;">
      <td colspan="3" nowrap="nowrap" style="width: 99.903%;"><p> </p>
        <p>* Stand 12/2024</p></td></tr></table><div class="import-contacts-wrapper"><div class="import-contact">Pressekontakt: Jeroen Lissens<br>Tel: +32-3-890-9708<br>E-Mail Adresse: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Locations,Production Plants,Events,Leipzig]]></category>
            <pubDate>Fri, 28 Feb 2025 10:27:15 +0100</pubDate>
            <pp:lastModified>Fri, 28 Feb 2025 09:27:15 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/72fb2726-cf4b-4850-b427-1db1211218bb/500_P90589788_highRes_start-of-series-prod.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/72fb2726-cf4b-4850-b427-1db1211218bb/500_P90589788_highRes_start-of-series-prod.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/72fb2726-cf4b-4850-b427-1db1211218bb/P90589788_highRes_start-of-series-prod.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90589788_highRes_start-of-series-prod.jpg]]></pp:imageTitle></item><item>
                        <title>Produktionsstart des neuen BMW 2er Gran Coupé im BMW Group Werk Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/produktionsstart-des-neuen-bmw-2er-gran-coupe-im-bmw-group-werk-leipzig-de-lu/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/de-lu/produktionsstart-des-neuen-bmw-2er-gran-coupe-im-bmw-group-werk-leipzig-de-lu/</guid><pp:caseid>815169</pp:caseid><pp:summary><![CDATA[+++ Zweite Modellgeneration des viertürigen kompakten Coupés +++ Mehr Eleganz und Dynamik +++ Neue Fertigungsanlage im Karosseriebau +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Beim BMW 2er Gran Coupé, das exklusiv im BMW
  Group Werk Leipzig gefertigt wird, startet die Produktion der zweiten
  Modellgeneration. Mit den weiteren Modellen BMW 1er, BMW 2er Active
  Tourer und MINI Countryman baut das BMW Group Werk Leipzig bis zu
  1.300 Fahrzeuge pro Tag. Auf einer Produktionslinie entstehen vier
  Modelle mit drei Antrieben von zwei Marken – damit beweist das
  Leipziger Werk maximale Flexibilität in der Fertigung. Markteinführung
  des neuen BMW 2er Gran Coupé ist im März 2025.</p>
<p>Mit dem viertürigen Coupé im Kompaktsegment stellte BMW vor fünf
  Jahren ein vollkommen neu entwickeltes Fahrzeug vor als extravagantere
  Alternative zur klassischen Limousine. Die Produktion des ersten BMW
  2er Gran Coupé lief am 1. November 2019 im Leipziger Werk an,
  Markteinführung war im März 2020. Die größten Absatzmärkte waren
  Großbritannien, China und die USA. </p>
<p>
  <strong>Sportlich elegantes Design</strong></p>
<p>Das neue BMW 2er Gran Coupé besticht durch ein ausdruckstarkes
  Exterieurdesign, ein vollständig erneuertes Antriebsportfolio,
  umfangreich weiterentwickelte Fahrwerkstechnik sowie serienmäßig
  innovative Systeme für teilautomatisiertes Fahren und Parken. Außerdem
  ist das neue BMW 2er Gran Coupé um 25 Millimeter in der Höhe und 20
  Millimeter in der Länge gewachsen.</p>
<p>Das Exterieurdesign mit der flachen, tief zur Fahrbahn geneigten
  Frontpartie, der dynamisch gestreckten Silhouette und dem kraftvoll
  gestalteten Heck verleiht dem neuen BMW 2er Gran Coupé eine noch
  sportlichere Eleganz. Für den Zusammenbau der Heckklappe für dieses
  Modell wurde im Karosseriebau des Leipziger Werks eine komplett neue
  Fertigungsanlage mit Laserlöttechnologie installiert. Wie der neue BMW
  1er, der seit Juli in Leipzig vom Band läuft, hat auch das BMW 2er
  Gran Coupé nun die markante breite BMW Niere mit einer neuartigen
  Struktur aus vertikal und diagonal verlaufenden Stäben. Ab März 2025
  ist diese als Sonderausstattung auch beleuchtet erhältlich.</p>
<p>
  <strong>Neue Motoren und Farben </strong></p>
<p>Das neugestaltete Interieur des viertürigen BMW 2er Coupés ist
  komplett lederfrei und wie alle Leipziger BMW Modelle nun mit Curved
  Display ausgestattet. Die neukonstruierten Sitze sorgen für besonders
  hohen Langstreckenkomfort.</p>
<p>Spitzenmodell ist das BMW M235 xDrive Gran Coupé mit einem 221kW/300
  PS starken Vierzylinder-Motor (Kraftstoffverbrauch kombiniert gemäß
  WLTP: 8,2 – 7,5 l/100 km; CO<sub>2</sub>-Emissionen kombiniert gemäß
  WLTP: 185 – 170 g/km; Kraftstoffverbrauch gemäß Pkw-EnVKV:
  8,2 l/100 km; CO<sub>2</sub>-Emissionen gemäß Pkw-EnVKV: 185 g/km;
  CO<sub>2</sub>-Klasse gemäß Pkw-EnVKV: G). Außerdem umfasst das zur
  Markteinführung im März 2025 verfügbare Antriebsportfolio einen
  weiteren Ottomotor und zwei Dieselantriebe.</p>
<p>Der kompakte BMW 2er Viertürer wird aktuell in zwei Uni-, sieben
  Metallic-Farben sowie vier BMW Individuallackierungen und einer großen
  Auswahl an möglichen BMW Individual Sonderlackierungen angeboten. Für
  das Dach gibt es optional eine Kontrastlackierung in hochglänzendem Schwarz. </p>
<p>
  <strong>Werksausbau und Nachtschicht für höheres Produktionsvolumen </strong></p>
<p>Mit dem Produktionsanlauf des BMW 2er Gran Coupé der zweiten
  Generation ist die neue Produktfamilie des BMW Group Werk Leipzig nun
  komplett. „Mit dem neuen BMW 2er Gran Coupé, dem BMW 1er, dem BMW 2er
  Active Tourer und dem MINI Countryman sowie dem MINI Countryman
  Electric als vollelektrisches Modell ist für eine gute Auslastung im
  Leipziger Werk gesorgt. Unsere Produkte sind beim Kunden sehr
  gefragt“, betont Werkleiterin Petra Peterhänsel.</p>
<p>Seit 2018 wurde das sächsische BMW Werk umfangreich ausgebaut, um nun
  bis zu 350.000 Fahrzeuge jährlich bauen zu können – 100.000 Einheiten
  mehr als bisher. Seit November 2023 sorgt auch der MINI Countryman für
  mehr Volumen. Das Leipziger Werk ist das einzige Vollwerk der BMW
  Group, das zwei Marken auf einem Band fertigt. Bis zu 500 MINI und
  rund 800 BMW Automobile können pro Tag derzeit vom Band laufen. Mit
  dem höheren Produktionsvolumen ist die Sicherung von Arbeitsplätzen
  und ein Zuwachs von bis zu 900 Mitarbeitenden allein in der
  Fahrzeugproduktion in 2024 verbunden. Im September wurde erstmals seit
  Eröffnung des Leipziger Werks im Jahr 2005 eine Nachtschicht in der
  Montage eingeführt. Nun werden in drei Schichten rund um die Uhr BMW
  und MINI Fahrzeuge gebaut.</p><div class="import-contacts-wrapper"><div class="import-contact">Pressekontakt: Jeroen Lissens<br>Tel: +32-3-890-9708<br>E-Mail Adresse: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,2 Series,Production,Production Plants,Gran Coupé,Leipzig,F74]]></category>
            <pubDate>Fri, 01 Nov 2024 08:00:00 +0100</pubDate>
            <pp:lastModified>Fri, 01 Nov 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/65a4e53d-26b6-43cd-b4f9-c7fe85cc2a46/500_P90577437_highRes_production-of-the-ne.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/65a4e53d-26b6-43cd-b4f9-c7fe85cc2a46/500_P90577437_highRes_production-of-the-ne.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/65a4e53d-26b6-43cd-b4f9-c7fe85cc2a46/P90577437_highRes_production-of-the-ne.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90577437_highRes_production-of-the-ne.jpg]]></pp:imageTitle></item><item>
                        <title>Produktionsstart des MINI Countryman Electric im BMW Group Werk Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/produktionsstart-des-mini-countryman-electric-im-bmw-group-werk-leipzig-de-lu/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/de-lu/produktionsstart-des-mini-countryman-electric-im-bmw-group-werk-leipzig-de-lu/</guid><pp:caseid>814915</pp:caseid><pp:summary><![CDATA[+++ Volumenausbau und Personalaufbau +++ Zusätzliche Nachtschicht in der Montage +++ Hochvoltbatterien aus werkseigener Produktion +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Das BMW Group Werk Leipzig bleibt unter
  Strom: Vier Monate nach dem  Produktionsstart des MINI Countryman mit
  Verbrennungsmotoren rollen die vollelektrischen Modelle in Leipzig vom
  Band. Nach dem Auslauf des BMW i3 hat die Geburtsstätte der
  E-Mobilität bei der BMW Group wieder ein vollelektrisches Fahrzeug im
  Programm. Auf einer Produktionslinie entstehen nun vier Modelle mit
  drei Antrieben von zwei Marken: der BMW 1er, der BMW 2er Active Tourer
  (auch als Plug-in-Hybrid), das BMW 2er Gran Coupé sowie der MINI
  Countryman mit vollelektrischem und konventionellem Antrieb.</p>
<p>Der MINI Countryman Electric ist für MINI ein wichtiger Schritt auf
  dem Weg zur rein elektrischen Marke bis 2030. Er verbindet
  elektrifiziertes Gokart-Feeling mit lokal emissionsfreier Mobilität.
  Mit rein elektrischem Antrieb ist das Fahrzeug in den Varianten <a name="_Hlk159504404"></a>Countryman E (150 kW, 204 PS | Stromverbrauch
  17,4 – 15,7 kWh/100 km | CO2-Emissionen 0 g/km) sowie mit gesteigerter
  Leistung und <a name="_Hlk159504439"></a>allradgetrieben als
  Countryman SE ALL4 (230 kW, 313 PS | Stromverbrauch 18,5 – 16,8
  kWh/100 km | CO2-Emissionen 0 g/km) erhältlich.</p>
<p>
  <strong>Konsequenter Werksausbau und flexibles Produktionssystem</strong></p>
<p>Um bis zu 350.000 Einheiten pro Jahr fertigen zu können – 100.000
  Einheiten mehr als bisher – wurde das Leipziger Werk seit 2018
  kontinuierlich ausgebaut. Karosseriebau, Lackiererei, Montage und
  Logistik wurden umfangreich erweitert und modernisiert. „Unsere
  Fahrzeuge und Komponenten sind gefragt. Die BMW Group hat in den
  vergangenen Jahren rund 1,6 Milliarden Euro in den Leipziger Standort
  investiert, um zusätzliche Fahrzeuge und E-Komponenten hier zu
  produzieren. Jetzt kommt das höhere Fahrzeugvolumen. Das sind sehr
  positive Nachrichten für unser Werk“, freut sich Werkleiterin Petra Peterhänsel.</p>
<p>Verantwortlich für den Volumenausbau ist in erster Linie der MINI
  Countryman. Im Verlauf des Jahres 2024 steigert sich seine Produktion
  auf knapp 500 Einheiten am Tag, zusätzlich zu den rund 800 BMW
  Automobilen. Dank des flexiblen Produktionssystems ist das Leipziger
  Werk in der Lage, kurzfristig auf Kundenwünsche zu reagieren und zum
  Beispiel den Anteil vollelektrischer Fahrzeuge zu erhöhen.</p>
<p>Die flexible Montagestruktur ermöglicht die nahtlose Integration des
  MINI Countryman Electric in den Produktionsprozess. In der
  Aggregatemontage des Leipziger Werks werden die Antriebseinheiten
  ebenfalls auf nur einer Linie zusammengebaut und für die sogenannte
  „Hochzeit“ mit der Karosserie vorbereitet. Für die beiden
  vollelektrischen Modelle werden E-Motor, Getriebe und
  Steuerungselektronik (HEAT: hochintegrierte elektrische
  Antriebstopologie) direkt im Werk zusammengefügt. Lediglich für die
  Steuerungselektronik musste ein neues Band aufgebaut werden.</p>
<p>
  <strong>Höheres Produktionsvolumen erfordert Personalaufbau und Nachtschicht </strong></p>
<p>Mit dem höheren Produktionsvolumen ist die Sicherung von
  Arbeitsplätzen und ein Zuwachs von bis zu 900 Mitarbeitenden allein in
  der Fahrzeugproduktion verbunden. Bis Ende 2024 werden rund 7.000 BMW
  Mitarbeitende im Leipziger Werk beschäftigt sein. In allen
  Technologien ist eine Anpassung der Arbeitszeiten erforderlich. Ab
  September wird erstmals eine Nachtschicht in der Montage eingeführt,
  so dass in drei Schichten rund um die Uhr Autos gebaut werden.</p>
<p>„2005 sind wir hier am Standort mit rund 2.600 Beschäftigten in die
  Produktion  gestartet – 19 Jahre später sind es über 7.000. Das Werk
  ist über die Jahre erheblich und kontinuierlich gewachsen. Der Start
  der Nachtschicht in der Montage ist ein weiterer wichtiger Meilenstein
  in der Erfolgsgeschichte unseres Werks und ein klares
  Vertrauensbekenntnis des Unternehmens in den Standort Leipzig!“,
  betont Betriebsratsvorsitzender Jens Köhler.</p>
<p>
  <strong>Im Werk produziert: Hochvoltbatterien für den MINI Countryman Electric</strong></p>
<p>Mit dem Produktionsstart des MINI Countryman Electric wird im
  Leipziger BMW Werk der gesamte Prozess der Hochvoltbatteriefertigung
  der aktuellen 5. Generation abgebildet. Dieser gliedert sich in drei
  Prozessschritte: Zelllackierung, Modulfertigung und
  Hochvoltbatteriemontage. Für die E-Komponentenfertigung wurden im Werk
  fünf Zelllackierungs-, drei Modulfertigungslinien und zwei Linien für
  die Hochvoltbatteriefertigung aufgebaut, die sich in der Hochlaufphase befinden.</p>
<p>„Wir befinden uns mitten in der Transformation zur E-Mobilität“, sagt
  Markus Fallböhmer, Leiter Batterieproduktion bei der BMW Group. „Dass
  wir am Standort Leipzig ab diesem Jahr alle Prozessschritte der
  hausinternen Hochvoltbatteriefertigung abbilden, markiert dabei den
  nächsten großen Schritt.“</p>
<p>Seit 2021 werden die Kapazitäten für die E-Komponentenfertigung in
  Leipzig hochgefahren. Neben den Hochvoltbatterien für den MINI
  Countryman Electric wird das Werk E-Komponenten für die Modelle BMW
  iX1, BMW iX2, BMW i4, BMW i5 und BMW iX für weitere Standorte
  produzieren. Aktuell sind rund 1.000 Mitarbeiterinnen und Mitarbeiter
  in der Leipziger E-Komponentenfertigung tätig.</p>
<p>Für die Hochvoltbatteriefertigung wurden die ehemaligen Flächen der
  BMW i3 und BMW i8 Produktion umgebaut und um neue Gebäude ergänzt.
  Unter anderem wurde eine neue Halle mit rund 61.000 m² Grundfläche
  gebaut. Bis zu 300.000 Hochvoltbatterien können dort pro Jahr mit zwei
  Anlagen produziert werden. Die BMW Group hat bisher mehr als 900
  Millionen Euro in die E-Komponentenfertigung im Werk Leipzig investiert.</p>
<p>
  <strong>Ressourcenschonende Lackierprozesse  </strong></p>
<p>Zum Start des vollelektrischen Modells wird der MINI Countryman in
  drei weiteren Karosseriefarben angeboten: British Racing Green, Chili
  Red und Blazing Blue. Auf Wunsch auch mit dem MINI typischen
  Kontrastdach. Zur Lackierung des Kontrastdachs ist im Leipziger Werk
  ein neues, ressourcenschonendes Verfahren, das sogenannte „Overspray
  freie Lackieren“, im Qualifizierungsprozess. Overspray bezeichnet den
  überschüssigen Lacknebel, der normalerweise beim Lackieren entsteht.
  Bei dem neuen Verfahren gibt es diesen Lacknebel nicht mehr. Das
  erleichtert das mehrfarbige Lackieren von Oberflächen, da ein
  aufwendiges Abkleben der Flächen nicht mehr notwendig ist.</p>
<p>Das Overspray freie Lackieren leistet zudem einen Beitrag zur
  Reduzierung der CO<sub>2</sub>-Emissionen, da die Abluft in den
  Lackierkabinen weniger gereinigt werden muss. Auch wird deutlich
  weniger konditionierte Luft – das heißt Luft, bei der die Temperatur
  und Feuchtigkeit entsprechend geregelt ist - in der Lackierkabine
  benötigt. Das spart Energie zur Temperierung und Nachbehandlung der Abluft.</p>
<p>Auch die Brennertechnologie, die für die Lacktrocknung bei der
  Kontrastdachlackierung eingesetzt wird, wurde zum Start der MINI
  Countryman Produktion auf ein bivalentes System umgestellt. Die
  brennstoff-flexiblen Brenner sind in der Lage, Wasserstoff (H2) und
  das Erdgas Methan (CH4) zu verbrennen. Die Umstellung der Brennstoffe
  kann sogar im laufenden Betrieb erfolgen. Fünf bivalente,
  wasserstofffähige Brenner kommen bei der Kontrastdachlackierung des
  MINI Countryman zum Einsatz.</p>
<p>Weitere Brenner der Lackiererei werden sukzessive auf einen
  bivalenten Betrieb umgerüstet. Aktuell wurden die nächsten sechs
  wasserstofffähigen Brenner installiert. Damit ist das Leipziger Werk
  Vorreiter in der Automobilbranche und geht weitere Schritte in
  Richtung Reduzierung der CO<sub>2</sub> Emissionen. „Unsere Leipziger
  Vision ist die weitgehende Dekarbonisierung der Produktion, also das
  Ersetzen von fossilen Brennstoffen durch grünen Wasserstoff“,
  beschreibt Werkleiterin Petra Peterhänsel die langfristige Ausrichtung
  des Werks. Voraussetzung dafür ist eine ausreichende leitungsgebundene
  Verfügbarkeit von grünem Wasserstoff. Für das Werk Leipzig bietet sich
  die Chance, ein in der Region entstehendes Wasserstoffnetz dafür zu nutzen.</p><div class="import-contacts-wrapper"><div class="import-contact">Pressekontakt: Jeroen Lissens<br>Tel: +32-3-890-9708<br>E-Mail Adresse: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Locations,Production Plants,Countryman,Electric,Leipzig,e-Mobility]]></category>
            <pubDate>Fri, 01 Mar 2024 08:00:00 +0100</pubDate>
            <pp:lastModified>Fri, 01 Mar 2024 07:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/e59ea12a-0bdc-444e-92d1-76db0dffccd1/500_P90540682_highRes_mini-countryman-e-an.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/e59ea12a-0bdc-444e-92d1-76db0dffccd1/500_P90540682_highRes_mini-countryman-e-an.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/e59ea12a-0bdc-444e-92d1-76db0dffccd1/P90540682_highRes_mini-countryman-e-an.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90540682_highRes_mini-countryman-e-an.jpg]]></pp:imageTitle></item><item>
                        <title>Eine Linie – zwei Marken – drei Antriebe: Produktionsstart des MINI Countryman im BMW Group Werk Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/eine-linie---zwei-marken---drei-antriebe-produktionsstart-des-mini-countryman-im-bmw-group-werk-leipzig-de-lu/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/de-lu/eine-linie---zwei-marken---drei-antriebe-produktionsstart-des-mini-countryman-im-bmw-group-werk-leipzig-de-lu/</guid><pp:caseid>814869</pp:caseid><pp:summary><![CDATA[+++ Weltweit erstes BMW Group Werk mit zwei Marken auf einem Band +++ Nahtlose Integration dank maximaler Flexibilität +++ Investition in den Ausbau des Werks +++ Personalaufbau +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Mit dem Produktionsstart des MINI Countryman
  feiert das BMW Group Werk Leipzig gleich mehrere Premieren und
  Meilensteine: Erstmals wird ein MINI Modell in Deutschland gefertigt
  und läuft zusammen mit den BMW 1er und 2er Modellen über eine
  Fertigungslinie. Möglich macht dies die flexible Werksstruktur und der
  konsequente Ausbau des Werks. Für das größere Fahrzeugvolumen und MINI
  spezifische Anpassungen hat die BMW Group in den letzten fünf Jahren
  700 Millionen Euro in den sächsischen Standort investiert. Damit ist
  auch ein Zuwachs von bis zu 900 Mitarbeitenden bis Ende 2024 alleine
  in der Fahrzeugproduktion verbunden. Im Hinblick auf nachhaltige
  Produktionsabläufe ist der neue MINI Countryman ein Impulsgeber für Innovationen.</p>
<p>„Mit dem Anlauf des MINI Countryman im Werk Leipzig nutzen wir unser
  flexibles Produktionssystem markenübergreifend”, erklärt
  Produktionsvorstand Milan Nedeljković. „Der Leipziger Standort setzt
  zudem Akzente in der ressourcenschonenden Fertigung und liefert damit
  weitere Belege für die erfolgreiche Umsetzung unseres langfristigen
  Masterplans – der BMW iFACTORY.”</p>
<p>
  <strong>Nahtlose Integration dank flexibler Strukturen</strong></p>
<p>Beim neuen MINI Countryman vertraut das Unternehmen auf die Kompetenz
  und hohe Flexibilität des Standorts Leipzig, um neue Wege in der
  Produktion zu beschreiten. Der MINI Countryman konnte nahtlos in den
  Fertigungsprozess integriert werden und läuft nun zusammen mit dem BMW
  1er, dem BMW 2er Gran Coupé und dem BMW 2er Active Tourer über ein Band.</p>
<p>Dank der flexiblen Montagestruktur können im Leipziger Werk zwei
  Marken und drei Antriebe auf einer Produktionslinie gefertigt werden –
  Verbrenner, Plug-in-Hybride und vollelektrische Fahrzeuge. Der MINI
  Countryman wird in seiner dritten Generation mit Elektroantrieb sowie
  als Otto- und Dieselvariante angeboten. Die Hochvoltbatterien für den
  MINI Countryman Electric werden ebenfalls im Leipziger Werk
  hergestellt. Der neue MINI Countryman kommt am 17. Februar 2024 zu den Händlern.</p>
<p>
  <strong>Investitionen und Personalaufbau zur Erhöhung des Produktionsvolumens</strong></p>
<p>In die Erhöhung des Produktionsvolumens für neue Modelle hat die BMW
  Group rund 500 Millionen Euro in Leipzig investiert. Seit 2018 wurden
  Karosseriebau, Lackiererei, Montage und Logistik umfangreich erweitert
  und modernisiert. Statt bisher 250.000 Einheiten pro Jahr können nun
  bis zu 350.000 Fahrzeuge gebaut werden.</p>
<p>Die MINI spezifischen Anpassungen des Produktionssystems erforderten
  eine Investition von etwa 200 Millionen Euro. Zunächst werden etwa 100
  MINI Countryman pro Tag gebaut. Im Verlauf des nächsten Jahres
  steigert sich die Produktion auf bis zu 500 Einheiten - zusätzlich zu
  den bisherigen knapp 1.000 BMW Automobilen pro Tag. Damit ist die
  Sicherung von Beschäftigung und ein Zuwachs an Stellen verbunden.
  Alleine in der Fahrzeugproduktion entstehen bis zu 900 neue Arbeitsplätze.</p>
<p>
  <strong>Elektromobilität und MINI Produktion als Entwicklungs-Motor</strong></p>
<p>Ein weiterer wichtiger Meilenstein für die Entwicklung und den Ausbau
  des Leipziger Werks ist die Transformation hin zur Elektromobilität.
  „Leipzig bleibt unter Strom“, freut sich Petra Peterhänsel. „Mit der
  BMW i3 und i8 Fertigung waren wir das Pionierwerk der E-Mobilität bei
  der BMW Group. Mit dem MINI Countryman Electric bauen wir ab nächstes
  Jahr wieder ein vollelektrisches Fahrzeug in Leipzig. Auch die
  Hochvoltbatterien für dieses Modell werden aus der werkseigenen
  Produktion kommen.“</p>
<p>Ab 2024 wird im Leipziger BMW Werk der gesamte Prozess der
  Hochvoltbatteriefertigung der aktuellen 5. Generation abgebildet.
  Dieser gliedert sich in drei Prozessschritte: Zelllackierung,
  Modulfertigung und Montage. Fünf Zelllackierungs-, drei
  Modulfertigungslinien und eine erste Linie für die
  Hochvoltbatteriefertigung befinden sich aktuell in der Hochlaufphase,
  die zweite Linie für die Hochvoltbatteriefertigung kommt in 2024 hinzu.</p>
<p>Seit 2021 werden die Kapazitäten für die E-Komponentenfertigung in
  Leipzig hochgefahren. Damit trägt das sächsische Werk zur Versorgung
  des BMW Produktionsnetzwerks mit E-Komponenten für die
  vollelektrischen Fahrzeuge der BMW Group, wie zum Beispiel den BMW
  iX1, BMW i4, BMW i5 und BMW iX bei. Aktuell sind über 800
  Mitarbeiterinnen und Mitarbeiter in der E-Komponentenfertigung am
  Standort Leipzig tätig. Ein weiterer Ausbau ist geplant.  Die
  Investitionssumme beträgt mehr als 800 Millionen Euro.</p>
<p>
  <strong>Nachhaltige Materialien und Produktion</strong></p>
<p>Der MINI Countryman Electric ist für MINI ein wichtiger Schritt auf
  dem Weg zur rein elektrischen Marke bis 2030. Er verbindet
  elektrifiziertes Gokart-Feeling mit einem reduzierten ökologischen
  Fußabdruck. Die verantwortungsbewusste Haltung der Marke stand im
  Fokus bei der Neuentwicklung des Modells im Hinblick auf Materialien
  und Produktion. Dazu gehören der Verzicht auf sämtliche Dekorelementen
  aus Chrom im Exterieur und Interieur sowie die Herstellung der
  Leichtmetall-Gussräder aus bis zu 70 Prozent Sekundär-Aluminium. Zur
  Produktion der effizienten und permanent stromerregten Synchronmotoren
  sind keine seltenen Erden nötig.</p>
<p>Bei der Innenausstattung kommen ausschließlich neu entwickelte,
  hochwertige und umweltschonende Materialien zum Einsatz. Die
  Oberflächen der Armaturen, die Türinnenseiten sowie der Fahrzeugboden
  und die Fußmatten des MINI Countryman bestehen aus recyceltem Textil.
  Diese hochwertige Alternative zu traditionellen Materialien wie
  Kunststoff reduziert die CO<sub>2</sub>-Emissionen entlang der
  Wertschöpfungskette und verbraucht deutlich weniger Wasser in der Herstellung.</p>
<p>
  <strong>Kontrastdachlackierung mit innovativem Verfahren</strong></p>
<p>Zu den markanten MINI Merkmalen im Exterieur Design gehört das
  Kontrastdach, das auf Wunsch in einer anderen Farbe als die Wagenfarbe
  erhältlich ist. Für den MINI Countryman wird zur Lackierung des
  Kontrastdachs ein neues, ressourcenschonendes Verfahren zum Einsatz
  kommen, das sogenannte „Overspray freie Lackieren“. Das Verfahren ist
  derzeit im Qualifizierungsprozess. Overspray bezeichnet den
  überschüssigen Lacknebel, der normalerweise beim Lackieren entsteht.
  Bei dem neuen Verfahren gibt es diesen Lacknebel nicht mehr.</p>
<p>Das Verfahren erleichtert damit das mehrfarbige Lackieren von
  Oberflächen, da ein aufwendiges Abkleben der Flächen nicht mehr
  notwendig ist. Das Overspray freie Lackieren leistet zudem einen
  Beitrag zur Reduzierung der CO<sub>2</sub>-Emissionen, da die Abluft
  in den Lackierkabinen weniger gereinigt werden muss. Auch wird
  deutlich weniger konditionierte Luft – das heißt Luft, bei der die
  Temperatur und Feuchtigkeit entsprechend geregelt ist - in der
  Lackierkabine benötigt. Das spart Energie zur Temperierung und
  Nachbehandlung der Abluft.</p>
<p>Eine weitere nachhaltige Neuerung im Leipziger Werk ist die
  Brennertechnologie, die für die Lacktrocknung bei der
  Kontrastdachlackierung eingesetzt wird. Als weltweit erstes
  Automobilwerk wurde am Standort Leipzig im vergangenen Jahr in der
  Lackiererei eine Brennertechnologie pilotiert, die neben Erdgas auch
  Wasserstoff nutzen kann. Die brennstoff-flexiblen Brenner sind in der
  Lage, Wasserstoff (H2) und das Erdgas Methan (CH4) sowohl allein als
  auch im Gemisch zu verbrennen. Die Umstellung der Brennstoffe kann
  sogar im laufenden Betrieb erfolgen. Nach der erfolgreichen Testphase
  wurden nun fünf bivalente, wasserstoff-fähige Brenner für den
  Serienbetrieb installiert, die bei der Kontrastdachlackierung des MINI
  Countryman zum Einsatz kommen. Ziel ist, weitere Brenner der
  Lackiererei sukzessive auf einen bivalenten Betrieb umzurüsten.</p>
<p>
  <strong>Werk Leipzig – von Anfang an auf Nachhaltigkeit ausgerichtet</strong></p>
<p>Schon bei der Planung des Werks wurde großen Wert auf effiziente
  Prozesse gelegt sowie auf eine langfristig angelegte, nachhaltige
  Strategie für Energieerzeugung und -verbrauch. „Nachhaltigkeit liegt
  in den Genen des BMW Group Werk Leipzig. Ein für alle sichtbares
  Beispiel sind die vier Windräder, die das Werk mit elektrischer
  Energie versorgen“, führt Werkleiterin Petra Peterhänsel aus.</p>
<p>Ein weiterer Meilenstein neben den 2013 errichteten Windrädern mit
  einer Leistung von 10 MW (Produktion von ca. 25 GWh/Jahr) war die
  Eröffnung der Batterie-Speicherfarm im Jahr 2017. Dort kommen bis zu
  700 Hochvoltbatterien aus BMW i3 Fahrzeugen zu ihrem zweiten Einsatz.
  Die Anlage kann Strom, unter anderem aus den Windenergieanlagen, auf
  dem Werksgelände zwischenspeichern und so das lokale Energiemanagement
  optimieren oder zur Netzstabilisierung des Stromnetzes beitragen.</p>
<p>„Unsere Leipziger Vision ist die weitgehende Dekarbonisierung der
  Produktion, also das Ersetzen von fossilen Brennstoffen durch grünen
  Wasserstoff“, beschreibt Werkleiterin Petra Peterhänsel die
  langfristige Ausrichtung des Werks. Voraussetzung dafür ist eine
  ausreichende leitungsgebundene Verfügbarkeit von grünem Wasserstoff.
  Für das Werk Leipzig bietet sich die Chance, ein in der Region
  entstehendes Wasserstoffnetz dafür zu nutzen.</p><div class="import-contacts-wrapper"><div class="import-contact">Pressekontakt: Jeroen Lissens<br>Tel: +32-3-890-9708<br>E-Mail Adresse: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,Sustainability,Locations,Production Plants,Countryman,Leipzig]]></category>
            <pubDate>Fri, 10 Nov 2023 10:30:00 +0100</pubDate>
            <pp:lastModified>Fri, 10 Nov 2023 09:30:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/43748da2-d060-47b5-9a7d-4422896bd47d/500_P90531636_highRes_mini-countryman-prod.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/43748da2-d060-47b5-9a7d-4422896bd47d/500_P90531636_highRes_mini-countryman-prod.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/43748da2-d060-47b5-9a7d-4422896bd47d/P90531636_highRes_mini-countryman-prod.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90531636_highRes_mini-countryman-prod.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Werk Leipzig startet Serienproduktion des BMW 2er Active Tourer der zweiten Generation</title>
                        <link>https://newsroom.bmwgroup.com/emea/de-lu/bmw-group-werk-leipzig-startet-serienproduktion-des-bmw-2er-active-tourer-der-zweiten-generation-de-lu/</link>
                        <guid>https://newsroom.bmwgroup.com/emea/de-lu/bmw-group-werk-leipzig-startet-serienproduktion-des-bmw-2er-active-tourer-der-zweiten-generation-de-lu/</guid><pp:caseid>815351</pp:caseid><pp:summary><![CDATA[+++ Nahtlose Integration in den Produktionsprozess +++ BMW Group setzt auf die Frontantriebs-Kompetenz im Leipziger Werk +++ Dynamisches Design, neu gestalteter Innenraum, modernste Vernetzung +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> Die Serienproduktion des BMW 2er Active
  Tourer der zweiten Generation ist im BMW Group Werk Leipzig
  angelaufen. Vor knapp sieben Jahren, im Herbst 2014, in den Handel
  gekommen, hat sich der BMW 2er Active Tourer auf Anhieb gut im Markt
  etabliert. Seitdem haben sich mehr als 400.000 Kunden für dieses
  raumfunktionale und fahrdynamische Konzept in der
  Premium-Kompaktklasse entschieden. Über 368.000 davon wurden in
  Leipzig produziert. Das Nachfolgemodell des sportlichen Allrounders
  wird exklusiv im Werk Leipzig gefertigt.</p>
<p>„Nach dem erfolgreichen Debüt der ersten Generation des BMW 2er
  Active Tourers sind wir im BMW Group Werk Leipzig stolz darauf, auch
  den rundum neu gestalteten Nachfolger hier zu produzieren“, betont
  Werkleiter Hans-Peter Kemser. „Mit diesem Fahrzeug kann das Werk
  einmal mehr seine jahrelange Erfahrung und Kompetenz beim Bau von
  Frontantriebsmodellen im BMW Produktionsnetzwerk unter Beweis stellen.
  Zudem sichert der BMW 2er Active Tourer langfristig die Auslastung
  unseres Werks.“</p>
<p>Markante Merkmale der neuen Modellgeneration sind das betont
  dynamische Design, die klare Formensprache und der neu gestaltete
  Innenraum. Darüber hinaus zeichnet sich der neue BMW 2er Active Tourer
  durch die erstmalige Mild-Hybridisierung bei BMW in der Kompaktklasse
  sowie die neuesten Connectivity Features und erweiterte
  Ausstattungsumfänge aus.</p>
<p>
  <strong>Der BMW 2er Active Tourer setzt Maßstäbe</strong></p>
<p>Bei seinem Debüt im Jahr 2014 sorgte der BMW 2er Active Tourer für
  eine Revolution im BMW Produktportfolio: Das Fahrzeug begründete das
  Segment des Sports Activity Tourer und war der erste BMW mit
  Frontantrieb. Mit seinem raumfunktionalen Konzept, dem erstmaligen
  Angebot von 3-Zylinder-Motoren und dem modernen Frontantrieb, der den
  dynamischen Ansprüchen an ein Modell der Marke BMW gerecht wurde,
  begründete der BMW 2er Active Tourer eine neue Ära für die Marke BMW.</p>
<p>Auch die zweite Generation des BMW 2er Active Tourer setzt wieder
  Maßstäbe. Als sogenannter „Erstanläufer“ ist das Fahrzeug wegweisend
  für die weiteren BMW und MINI Modelle im Kompakt-Premiumsegment, die
  in den nächsten Jahren auf den Markt kommen. Der BMW 2er Active Tourer
  definiert neue Standards, was zum Beispiel die Weiterentwicklung des
  Antriebsstrangs und des Cockpits betrifft sowie das neue Bordnetz,
  welches erstmalig für Benzin- und Dieselmotoren bei BMW seine
  Anwendung findet.</p>
<p>
  <strong>Nahtlose Integration in den Produktionsprozess</strong></p>
<p>Wie bereits beim Bau der ersten elektrifizierten BMW Modelle BMW i3
  und BMW i8 vertraut das Unternehmen beim Bau der BMW 2er Active Tourer
  auf den Standort Leipzig und seine hohe Flexibilität, um neue
  Fahrzeugkonzepte auf die Straße zu bringen. Trotz der neuen
  Anforderungen bei der ersten Modellgeneration waren damals im
  Leipziger Werk in der Lackiererei und der Montage nur geringe
  Anpassungsmaßnahmen notwendig. Lediglich im Karosseriebau kam ein
  separater Fertigungsbereich hinzu.</p>
<p>Genauso nahtlos integriert sich nun der BMW Active Tourer der zweiten
  Generation in den Fertigungsprozess im BMW Group Werk Leipzig. Das
  neue Modell läuft zusammen mit dem BMW 1er und dem BMW 2er Gran Coupé
  über eine Fertigungslinie.</p>
<p>
  <strong>Dynamisches Design und neu gestalteter Innenraum</strong></p>
<p>Im Exterieurdesign wurde dem neuen BMW 2er Active Tourer durch
  dynamisch gestreckte Proportionen und eine klare und reduzierte
  Flächengestaltung eine noch sportlichere und selbstbewusstere
  Ausstrahlung verliehen.</p>
<p>Ein völlig neues Raumgefühl bietet die zweite Generation des BMW 2er
  Active Tourer im Innenraum, der grundlegend neu gestaltet wurde und
  sich am vollelektrischen Technologie-Flaggschiff BMW iX orientiert.
  Insbesondere das BMW Curved Display, die schwebend wirkende Armauflage
  mit integriertem Bedienfeld und die flache Armaturentafel fallen beim
  Blick ins Innere des neuen BMW 2er Active Tourer sofort ins Auge.
  Damit erhält der BMW 2er Active Tourer als erstes
  nicht-vollelektrisches Modell das Cockpitlayout der BMW E-Modelle.</p>
<p>Eine weitere Premiere im BMW 2er Active Tourer feiert das neue BMW
  iDrive, das erstmals in einem Modell im Premium-Kompaktsegment
  eingesetzt wird. Die neue Generation des Bediensystems iDrive basiert
  auf dem BMW Operating System 8.</p>
<p>Die zweite Generation des BMW 2er Active Tourer ist sowohl auf
  Verbrennungsmotoren als auch auf elektrifizierte Antriebe ausgelegt.
  Nur wenige Monate nach dem Marktstart wird das Angebot im Sommer 2022
  um zwei Plug-in-Hybrid-Modelle erweitert.</p>
<p>Markteinführung für den neuen BMW 2er Active Tourer in Deutschland
  ist der 26. Februar 2022.</p><div class="import-contacts-wrapper"><div class="import-contact">Pressekontakt: Jeroen Lissens<br>Tel: +32-3-890-9708<br>E-Mail Adresse: <a href="mailto:jeroen.lissens@bmw.be">jeroen.lissens@bmw.be</a></div></div></div>]]></description><category><![CDATA[Press Release,2 Series,Locations,Production Plants,Leipzig]]></category>
            <pubDate>Tue, 02 Nov 2021 13:15:00 +0100</pubDate>
            <pp:lastModified>Tue, 02 Nov 2021 12:15:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3240/ecc7cce9-c61c-4712-9621-bc56b4aaf564/500_P90443006_highRes_second-generation-bm.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3240/ecc7cce9-c61c-4712-9621-bc56b4aaf564/500_P90443006_highRes_second-generation-bm.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3240/ecc7cce9-c61c-4712-9621-bc56b4aaf564/P90443006_highRes_second-generation-bm.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90443006_highRes_second-generation-bm.jpg]]></pp:imageTitle></item></channel>
                    </rss>