<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom USA]]></title>
                    <link>https://newsroom.bmwgroup.com/americas/</link>
                    <description></description>
                    <language>en-us</language>
                    <lastBuildDate>Fri, 09 Oct 2026 13:41:16 +0200</lastBuildDate>
                    <pubDate>Thu, 02 Apr 2026 00:01:00 +0200</pubDate>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
                    <image>
                        <title><![CDATA[BMW Group Newsroom USA]]></title>
                        <url>https://content.presspage.com/clients/150_3243.png</url>
                        <link>https://newsroom.bmwgroup.com/americas/</link>
                        <width>144</width>
                    </image><item>
                        <title>The new BMW Group Plant Munich: More efficient, more flexible and more digital for production of the Neue Klasse</title>
                        <link>https://newsroom.bmwgroup.com/americas/the-new-bmw-group-plant-munich-more-efficient-more-flexible-and-more-digital-for-production-of-the-neue-klasse/</link>
                        <guid>https://newsroom.bmwgroup.com/americas/the-new-bmw-group-plant-munich-more-efficient-more-flexible-and-more-digital-for-production-of-the-neue-klasse/</guid><pp:caseid>780134</pp:caseid><pp:summary><![CDATA[Woodcliff Lake, NJ – April 1, 2026…BMW Group Plant Munich is approaching the biggest milestone in the transformation process: series production of the BMW i3, the second model in the Neue Klasse range, begins here in August. This marks the start of the rollout of the Neue Klasse within the BMW Group’s global production network]]></pp:summary><description><![CDATA[<div class="imported-article"><ul>
  <li>Tradition meets the future: 104 years of history utilizing
    state-of-the-art technology.</li>
  <li>Series production of the new BMW i3 to start in August 2026, with
    more models to follow.</li>
  <li>Transformation to all BEV production from 2027.</li></ul>
<p>
  <strong>Woodcliff Lake, NJ – April 1, 2026…</strong> BMW Group Plant
  Munich is approaching the biggest milestone in the transformation
  process: series production of the BMW i3, the second model in the Neue
  Klasse range, begins here in August. This marks the start of the
  rollout of the Neue Klasse within the BMW Group’s global production network.</p>
<p>“We have been making rigorous preparations. With the BMW iFACTORY, we
  have devised a consistent, strategic framework for our production,”
  explains Milan Nedeljković, Member of the Board of Management of BMW
  AG, Production. “We have paved the way for the upcoming start-ups in
  all our plants and have invested heavily in technologies,
  digitilization, and AI.”</p>
<p>BMW Group Plant Munich has undergone extensive modernization in
  recent years. The result is a plant that now works even more
  efficiently, flexibly, and digitally, and is optimally positioned for
  the requirements of electric mobility and the Neue Klasse.</p>
<p>But that’s not all: as of 2027, the Munich plant will produce
  all-electric vehicles exclusively, and thereby achieve a further boost
  in efficiency. This is assisted by proactive planning, close
  collaboration with development teams and suppliers, as well as modern
  production technology in the new structures. “We have reduced
  production costs considerably over recent years. With the start of
  production of the BMW i3, we will reduce overall production costs at
  the Munich plant by a further 10 percent, bringing them below the
  level of the current vehicle generation,” says Peter Weber, Head of
  BMW Group Plant Munich. In addition to optimized production processes,
  and targeted automation and digitilization, the new vehicle
  architecture of the Neue Klasse also ensures efficiency.   </p>
<p>Plant Munich is investing around €650 million in its transformation
  into a fully electric production site.</p>
<p>
  <strong>Highly efficient production at an historic site</strong>.</p>
<p>Plant Munich has been reinventing itself consistently for more than
  100 years – from a location outside the city to today’s site
  surrounded by it. The facility has undergone a fundamental process of
  redevelopment for the Neue Klasse – with production of up to 1,000
  vehicles a day continuing during this period. A new body shop and
  state-of-the-art vehicle assembly including new logistics areas were
  set up on an area spanning around a third of the plant’s footprint.
  Extensive updates have also been made to existing technologies.  </p>
<p>Plant manager Peter Weber highlights what the workforce has achieved:
  “The people at the factory played an essential role in making this
  transformation a success. With their high level of expertise,
  enthusiasm, and tremendous dedication, our employees have shown that
  world-class industrial production is possible even under the toughest
  conditions. The BMW i3 is just the beginning – several Neue Klasse
  models will be manufactured in Munich in the future, including the BMW
  i3 Touring.”</p>
<p>
  <strong>A vision for all technologies: the BMW iFACTORY</strong></p>
<p>The BMW iFACTORY focuses on the areas of efficiency, sustainability,
  and digitilization. Within this framework, the company’s plants around
  the world are implementing site-specific solutions and, in doing so,
  strengthening the company’s resilience as well as its ability to
  deliver reliably at any time and worldwide. This vision has now also
  been consistently implemented across all technologies at BMW Group
  Plant Munich.</p>
<p>“We have rethought the entire value stream from supplier to finished
  customer vehicle. We have looked at every single process in detail and
  made optimizations. Now our plant is even more efficient, more
  flexible, and even more digitized than ever before. We are thereby
  safeguarding the future viability of the plant,” adds Peter Weber.</p>
<p>In the <strong>press shop</strong>, steel and aluminium boards are
  turned into tens of thousands of components on highly automated press
  lines daily. Uniform press and tool standards across the global
  production network result in efficiencies on many levels: installation
  and integration of the systems are standardized, tools for the presses
  can be swapped within the network, and employees can work at various
  locations and help each other. An AI-assisted camera system supports
  quality control before an underground transport system moves the parts
  to the body shop. Output has increased significantly compared with
  previous structures. Cuts of steel and aluminium are collected,
  sorted, and then used to manufacture new steel or aluminium coils.</p>
<p>Plant Munich has set up a new <strong>body shop</strong> for the Neue
  Klasse featuring systems planned and realized using a virtual twin. A
  total of 800 new industrial robots take care of the joining processes
  here; decreasing the number of joining processes to five reduces
  process complexity. With an automation rate of around 98 percent,
  robots perform the majority of standardized processes. Automated
  surface inspection (ASI) assists with quality assurance. The
  energy-efficient building complies with the KfW 40 EE standard<a href="#_edn1" name="_ednref1" title="">[i]</a> and uses a
  photovoltaic system to generate its own electricity.</p>
<p>In the <strong>paint shop</strong> at Plant Munich, digital and
  AI-assisted systems control central quality processes. Automated
  surface inspection (ASI) uses cameras and artificial intelligence to
  detect even the most minor deviations on the surface and documents
  them digitally. Automated surface processing (ASP) works on the
  variations detected directly during the running process. To purify the
  exhaust air, the paint shop uses the energy-efficient, electrically
  powered eRTO process. This is complemented by heat and energy recovery
  as well as water-saving cycles.</p>
<p>What once was the home of engine manufacturing at BMW Group Plant
  Munich has become a new <strong>assembly area</strong> for the Neue
  Klasse. The assembly area is set up for end-to-end digital processes:
  vehicles, systems, and tools are interconnected and digital live
  tracking and automated inline quality checks support employees in the
  assembly line process. During assembly already, the BMW i3 digitally
  transmits the status of up to 20,000 features to the production
  system. Ergonomic workstations, height-adjustable systems, and
  simplified processes lighten the load for employees, while targeted
  training supports new digital fields.</p>
<p>Aspart of the transformation,<strong> logistics</strong> at BMW Group
  Plant Munich has focused squarely on efficiency and direct integration
  of production. The logistics department at the Munich plant moves
  around 2.5 million parts every day; in future around 70 percent of
  these parts will be delivered directly to the assembly workstations.
  This will reduce internal transport distances, save space and
  accelerate supply to the production lines. This is made possible by a
  multi-story building structure developed specially for the plant’s
  city location. Delivery is at ground level and then conveyor
  technology transports the parts to the right levels, where they are
  distributed directly to the assembly workstations. This enables the
  principle of direct delivery to be applied systematically even in a
  multi-story plant. At the same time, the level of automation in
  logistics has been significantly increased. Automated supply systems,
  smart transport robots, and driverless transport systems will handle
  around 60 percent of supply tasks in the future. A digital logistics
  control station manages all processes centrally, ensuring transparency
  and data-driven optimization.</p>
<p>Unique to Plant Munich is the in-house <strong>seat manufacturing
  </strong>facility. It is a “plant inside a plant” and takes on a
  central role for quality assurance and expert evaluation within the
  production network. The seats for all versions of the models produced
  in Munich are manufactured here and delivered to vehicle assembly
  directly and “just in sequence”. The in-house seat manufacturing
  facility is regarded as the benchmark for quality assurance across the
  BMW Group. Modern, largely automated processes ensure seamless quality
  control. This is complemented by fully automated end-of-line checks,
  including for safety-relevant components. The seat manufacturing
  facility also systematically strengthens the BMW Group’s in-house
  expertise. It serves as a competence center and innovation hub, tests
  new materials, technologies, and manufacturing concepts, and supports
  the evaluation of costs, quality and production processes – making an
  impact far beyond the Munich location.</p>
<p>
  <strong>Global network, regional value creation: high-voltage
    batteries and e-drive. </strong></p>
<p>With the new assembly plant for high-voltage batteries in
  Irlbach-Straßkirchen (Lower Bavaria, Germany) around 90 minutes away,
  the BMW Group is significantly boosting value creation in the Bavaria
  region. In keeping with the “local for local” approach,
  Irlbach-Straßkirchen will deliver high-voltage Gen6 batteries to the
  Munich plant as well as other German locations. Here, the batteries
  will be installed in the BMW i3. Manufacture of the high-voltage
  batteries combines a rigorous zero-defect approach with the latest
  production technologies, which were developed at Bavarian pilot
  plants. With seamless inline quality controls, digital twins and the
  systematic use of artificial intelligence, the BMW Group is setting
  new standards in battery production.</p>
<p>The Gen6 e-motor for the BMW i3 is produced at BMW Group Plant Steyr
  in Austria – a location that has been manufacturing drivetrains for
  over 40 years. With the first e-motor in the portfolio, the plant is
  developing its role as a prime example of technology openness. All
  core components of the highly integrated e-drive – from the rotor and
  stator to the inverter and transmission – are produced on-site. New
  production lines and state-of-the-art clean room environments have
  been set up for this. The aluminium foundry at BMW Group Plant
  Landshut supplies the e-motor housing for Plant Steyr.</p>
<p>
  <strong>BMW Group in the United States</strong></p>
<p>BMW Group began operations in the U.S. over 50 years ago. In addition
  to the sales, marketing, and distribution of BMW, MINI, Rolls-Royce,
  and BMW Motorrad vehicles, BMW Group’s business in the U.S. spans 30
  locations in 12 states including BMW Group Financial Services, BMW
  Manufacturing, Designworks, BMW Technology Office USA, and BMW i
  Ventures. The company’s U.S. plant in South Carolina is the largest
  single BMW production facility in the world and the global center of
  competence for BMW Sports Activity Vehicles. The BMW Group sales
  organization is represented by a nationwide network of 355 BMW
  retailers, 147 BMW motorcycle retailers, 104 MINI passenger car
  dealers, and 38 Rolls-Royce Motor Car dealers. Taken together, BMW
  Group’s business activities in the U.S. provide and support over
  120,000 jobs and contribute more than $43.3 billion to the U.S.
  economy annually. For more information about BMW Group’s business and
  products in the U.S., please visit: <a href="https://newsroom.bmwgroup.com/global/en">PressClub USA.</a></p>
<p>#      #      #</p>
<div>
  <br clear="all" />
  <hr />
  <div>
    <p>
      <a href="#_ednref1" name="_edn1" title="">[i]</a> To comply with
      the standard, a high-efficiency building may consume only 40% of
      the primary energy of a standard reference building and use at
      least 55% renewable energy for heating/cooling. </p></div></div><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Jay Hanson<br>Tel: +1-201-307-4085<br>E-mail: <a href="mailto:jay.hanson@bmwna.com">jay.hanson@bmwna.com</a></div></div></div>]]></description><category><![CDATA[Press Release,Research &amp; Development,Production,Drive Technologies,Production Plants,Locations,Industry 4.0,Logistics,Supply Chain,Digitalisation]]></category>
            <pubDate>Thu, 02 Apr 2026 00:01:00 +0200</pubDate>
            <pp:lastModified>Wed, 01 Apr 2026 22:01:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3243/c020c756-c92e-4b02-9c9c-69a26c4b2a69/500_P90634415_highRes_bmw-group-plant-muni.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3243/c020c756-c92e-4b02-9c9c-69a26c4b2a69/500_P90634415_highRes_bmw-group-plant-muni.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3243/c020c756-c92e-4b02-9c9c-69a26c4b2a69/P90634415_highRes_bmw-group-plant-muni.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90634415_highRes_bmw-group-plant-muni.jpg]]></pp:imageTitle></item></channel>
                    </rss>