<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[BMW Group Newsroom Canada]]></title>
                    <link>https://newsroom.bmwgroup.com/americas/en-ca/</link>
                    <description></description>
                    <language>en-ca</language>
                    <lastBuildDate>Fri, 30 Oct 2026 19:27:48 +0100</lastBuildDate>
                    <pubDate>Thu, 26 Oct 2023 12:00:00 +0000</pubDate>
                    <image>
                        <title><![CDATA[BMW Group Newsroom Canada]]></title>
                        <url>https://content.presspage.com/clients/150_3243.png</url>
                        <link>https://newsroom.bmwgroup.com/americas/en-ca/</link>
                        <width>144</width>
                    </image><item>
                        <title>Expertise built into every cell: BMW Group produces battery cell samples in Parsdorf</title>
                        <link>https://newsroom.bmwgroup.com/americas/en-ca/expertise-built-into-every-cell-bmw-group-produces-battery-cell-samples-in-parsdorf/</link>
                        <guid>https://newsroom.bmwgroup.com/americas/en-ca/expertise-built-into-every-cell-bmw-group-produces-battery-cell-samples-in-parsdorf/</guid><pp:caseid>784216</pp:caseid><pp:summary><![CDATA[+++ Know-how concentrated at BMW Group Cell Manufacturing Competence Centre +++ Production, development and purchasing linked in unique way +++ Special focus on recycling and circularity +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Munich/Parsdorf.</strong> A tiny piece of the future began
  rolling off the production line in Parsdorf today: 95 millimetres
  tall, cylinder-shaped, with a diameter of 46 millimetres. These are
  the new battery cell samples – like those that will be used in the
  models of the Neue Klasse from 2025 onwards – being produced at the
  new Cell Manufacturing Competence Centre (CMCC) in Parsdorf. The BMW
  Group is thus positioning itself to ramp up electromobility
  efficiently and showcasing its leading role in battery cell technology.</p>
<p>“With the Cell Manufacturing Competence Centre, we are strengthening
  Germany’s capacity for innovation,” explained Milan Nedeljković,
  member of the Board of Management of BMW AG, responsible for
  Production. “In this way, we are making an important contribution to
  the quantum leap in technology in the Neue Klasse.”</p>
<p>“Production of battery cell samples in Parsdorf marks the next
  logical step in our battery cell strategy,” said Frank Weber, member
  of the Board of Management of BMW AG, responsible for Development.
  “The Cell Manufacturing Competence Centre is the perfect complement to
  our existing Battery Cell Competence Centre in the north of Munich.
  Development takes place there, then we scale the best product towards
  a series process in Parsdorf. Thanks to cross-divisional
  collaboration, we are able to link product and process in a unique way.”</p>
<p>The CMCC in Parsdorf will enable the BMW Group to span the whole cell
  value creation process. With this know-how, the company is setting
  benchmarks for production, quality, performance, costs and
  environmental standards, which it is implementing in close cooperation
  with its partners for standard production of battery cells. At its
  battery cell competence centres in Munich and Parsdorf, the BMW Group
  is systematically pursuing future milestones, such as the ramp-up of
  the sixth generation of BMW electric drive trains and development of
  all-solid-state batteries (ASSB). About 80 employees work at the
  15,000-square-metre Cell Manufacturing Competence Centre, which has
  benefited from a total investment of around 170 million euros. The
  German Federal Ministry of Economic Affairs and the Bavarian Ministry
  of Economic Affairs, Regional Development and Energy are supporting
  the project within the framework of the European funding process IPCEI
  (Important Projects of Common European Interest).</p>
<p>
  <strong>Recycling at the CMCC: Keeping materials in the loop</strong></p>
<p>Raw materials are among the significant cost factors for cell
  production. Efficient and responsible use of raw and carrier material
  is therefore necessary and makes sense from both an environmental and
  economic perspective. At the new CMCC, experience will be gained from
  all processes and the lessons learned analysed to further optimise the
  use of resources. Residual materials from the production process will
  be collected at the CMCC, sorted and fed back into the cell production
  cycle. In addition to working on the cell manufacturing process, BMW
  Group experts are also focusing on reusing materials and components
  from the whole battery after its initial use in the vehicle.</p>
<p>At the Battery Cell Competence Centre (BCCC) in Munich, the first
  battery cells made from 100% recycled and/or secondary (battery-grade)
  cathode material have been manufactured and tested using
  state-of-the-art characterisation methods. Our cell suppliers are
  already delivering battery cells containing secondary raw materials
  (e.g. nickel) from various used-battery sources (incl. production
  waste). The long-term aim of the BMW Group is to reuse all raw
  materials in recyclable high-voltage batteries.</p>
<p>
  <strong>How the cell is created: Production steps for sample
    manufacturing at the CMCC</strong></p>
<p>Cell manufacturing begins with electrode production. Here the base
  material, comprising, for example, graphite for the anode and nickel
  oxides for the cathode, with binders and solvents, is metered and
  mixed in a precisely measured ratio. This creates the so-called
  “slurry” – which means wafer-thin metal foils are coated and then
  compressed after drying. In technical jargon, this is referred to as
  “calendering”. The highest level of precision is required: The foil is
  just a few micrometres thick – in other words, thinner than the
  threads of a spider web, while the coating is in the micrometre range.
  During cell assembly, the coated foils, referred to as calendered
  electrodes, are wound into so-called “jelly rolls” using the separator
  and inserted into the cell housing. The cells are filled with
  electrolyte, then charged for the first time and finally checked for
  functionality and quality.</p>
<p>
  <strong>CMCC Parsdorf: Buildings with a focus on the environment</strong></p>
<p>The CMCC in Parsdorf is built to high environmental standards. An
  immission control approval procedure has been carried out for the
  technical installations used in battery cell production – ensuring
  that the company complies with all requirements and guidelines. The
  CMCC will also operate fossil-free, relying on electricity produced
  using renewable energy, including from photovoltaic systems on the
  roof of the building. The building will also be supplied with
  regenerative heat produced using state-of-the-art groundwater and air
  heat pumps.</p>
<p>
  <strong>Sixth-generation BMW battery technology: New cell format and
    enhanced cell chemistry</strong></p>
<p>The battery cell is responsible for electric vehicles’ core
  properties: range, driving performance and charging time. With the new
  BMW round cell specially designed for the electric architecture of the
  Neue Klasse models, it will be possible to significantly increase the
  range of the top model by up to 30 percent (according to WLTP).</p>
<p>The new BMW round cells come with a standard diameter of 46
  millimetres and two different heights of 95 millimetres and 120
  millimetres. Compared to the prismatic cells of the fifth BMW battery
  cell generation, the nickel content of the sixth-generation BMW round
  cells will be higher on the cathode side, while the cobalt content
  will be reduced. On the anode side, the silicon content will be
  increased. As a result, the cell’s volumetric energy density will
  improve by more than 20 percent.</p>
<p>Battery, drive train and charging technology in the Neue Klasse will
  have a higher voltage of 800 volts. Among other things, this will
  optimise how energy is supplied to direct current high-power charging
  stations, which can achieve a much higher charging capacity with a
  current of up to 500 amperes – thus reducing the time it takes to
  charge from ten to 80 percent by up to 30 percent.</p>
<p>
  <strong>Reducing the carbon footprint of battery cell production by up
    to 60 percent</strong></p>
<p>The BMW Group is particularly focused on keeping the carbon footprint
  and resource consumption of production as low as possible, starting in
  the supply chain. For standard production of battery cells, the cell
  manufacturers commissioned will use cobalt, lithium and nickel
  containing secondary material. Together with the commitment by its
  cell suppliers to use only green power from renewable energies in
  production, the BMW Group will reduce the carbon footprint from
  battery cell production by up to 60 percent, compared to the current
  generation of battery cells.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Marc Belcourt<br>Tel: +1-905-428-5078<br>E-mail: <a href="mailto:marc.belcourt@bmwgroup.ca">marc.belcourt@bmwgroup.ca</a></div></div></div>]]></description><category><![CDATA[Research &amp; Development,Mobility of the future,Drive Technologies,Press Release,Locations,Production Plants,Production,e-Mobility]]></category>
            <pubDate>Thu, 26 Oct 2023 12:00:00 +0200</pubDate>
            <pp:lastModified>Thu, 26 Oct 2023 12:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3243/838c74d4-24b3-4169-8327-f0cfef55fba3/500_P90529377_highRes_milan-nedeljkovi-mem.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3243/838c74d4-24b3-4169-8327-f0cfef55fba3/500_P90529377_highRes_milan-nedeljkovi-mem.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3243/838c74d4-24b3-4169-8327-f0cfef55fba3/P90529377_highRes_milan-nedeljkovi-mem.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90529377_highRes_milan-nedeljkovi-mem.jpg]]></pp:imageTitle></item><item>
                        <title>Local for local: BMW Group relies on regional supply chain to expand e-mobility in North America</title>
                        <link>https://newsroom.bmwgroup.com/americas/en-ca/local-for-local-bmw-group-relies-on-regional-supply-chain-to-expand-e-mobility-in-north-america-en-ca/</link>
                        <guid>https://newsroom.bmwgroup.com/americas/en-ca/local-for-local-bmw-group-relies-on-regional-supply-chain-to-expand-e-mobility-in-north-america-en-ca/</guid><pp:caseid>784220</pp:caseid><pp:summary><![CDATA[+++ Local battery cell supply for US vehicle production +++ Cathode raw material manufactured in Canada +++ AESC and Umicore as strong partners in North America +++ Board of Management Member Joachim Post: “We pursue a globally balanced procurement strategy” +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Munich.</strong> The BMW Group is accelerating its ramp-up of
  e-mobility and increasingly relying on regional supply chains, in line
  with the principle “local for local”. The company aims to source
  components like battery cells close to vehicle production and
  gradually localise the supply chain for primary materials.</p>
<p>
  <strong>New partner to supply primary material for battery cell production </strong></p>
<p>Belgian company Umicore has now been recruited as a further partner
  for establishing a local supply chain in North America. <a name="_Hlk144231506"></a>Umicore will supply our battery cell supplier
  AESC with cathode active battery materials from a new plant in
  Ontario, Canada. This is an important step in strengthening the BMW
  Group's regional supply chains and securing the ramp-up of e-mobility.</p>
<p>In accordance with the “local for local” principle, our partner AESC
  is currently building a battery cell factory in Florence, South
  Carolina. With an initial capacity of 30 GWh/a, the facility will
  produce the innovative cylindrical lithium-ion battery cells
  specifically developed for the sixth generation of BMW eDrive
  technology. Electricity for production of the battery cells and
  cathode raw material will come exclusively from renewable sources.</p>
<p>“The BMW Group pursues a globally balanced procurement strategy in
  the three main geographical regions of the world. Our battery cell
  supplier in the US will source key primary materials from Canada going
  forward. We are pleased that Canada is playing a strong role in
  establishing a robust and efficient battery cell supply chain for the
  BMW Group in North America,” said Joachim Post, member of the Board of
  Management of BMW AG responsible for Purchasing and Supplier Network.</p>
<p>
  <strong>Further BMW Group investment in South Carolina</strong></p>
<p>Oliver Zipse, Chairman of the Board of Management of BMW AG, already
  announced an extensive investment of 1.7 billion US dollars in
  expansion of the US production site back in October 2022. This
  includes 700 million US dollars to build the BMW Group’s new assembly
  centre in Woodruff, which will provide high-voltage batteries for the
  fully-electric BMW X models in the future. In the initial phase, the
  roughly 93,000 sq. m. facility will produce sixth-generation battery
  modules. The assembly centre will also create about 300 new jobs.</p>
<p>
  <strong>Sixth-generation battery cell technology for better
    performance and sustainability </strong></p>
<p>The new sixth-generation battery format will increase energy density
  by more than 20 percent and improve charging speed and range by up to
  30 percent. At the same time, CO<sub>2</sub> emissions from cell
  production will be reduced by up to 60 percent: on the one hand, by
  cell suppliers relying on energy from renewable resources; on the
  other, by using a percentage of secondary material for the raw
  materials lithium, cobalt and nickel.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Marc Belcourt<br>Tel: +1-905-428-5078<br>E-mail: <a href="mailto:marc.belcourt@bmwgroup.ca">marc.belcourt@bmwgroup.ca</a></div></div></div>]]></description><category><![CDATA[Research &amp; Development,Drive Technologies,Press Release,Spartanburg,e-Mobility,eDrive]]></category>
            <pubDate>Mon, 16 Oct 2023 21:45:00 +0200</pubDate>
            <pp:lastModified>Mon, 16 Oct 2023 21:45:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3243/cd18969e-b7e7-4391-9118-1e1b340cfdbe/500_P90527545_highRes_bmw-group-s-sixth-ge.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3243/cd18969e-b7e7-4391-9118-1e1b340cfdbe/500_P90527545_highRes_bmw-group-s-sixth-ge.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3243/cd18969e-b7e7-4391-9118-1e1b340cfdbe/P90527545_highRes_bmw-group-s-sixth-ge.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90527545_highRes_bmw-group-s-sixth-ge.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group to build logistics centre for high-voltage batteries in north of Leipzig</title>
                        <link>https://newsroom.bmwgroup.com/americas/en-ca/bmw-group-to-build-logistics-centre-for-high-voltage-batteries-in-north-of-leipzig/</link>
                        <guid>https://newsroom.bmwgroup.com/americas/en-ca/bmw-group-to-build-logistics-centre-for-high-voltage-batteries-in-north-of-leipzig/</guid><pp:caseid>784222</pp:caseid><pp:summary><![CDATA[+++ Ground-breaking ceremony +++ Construction work on eight hectares +++ First fossil fuel-free BMW facility on this scale +++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Leipzig.</strong> The BMW Group continues to invest in
  e-component production at Plant Leipzig and in the future of the site.
  A leasehold contract has now been signed for an area of land outside
  the plant premises, on the northern industrial estate – which is also
  home to the existing facility. The new plot for use by BMW consists of
  12 hectares in total, eight of which will be built on in the first
  stage of construction. This will produce a logistics hall for the
  current fifth-generation high-voltage batteries and an office
  building, both of which are due to reach completion in mid-2024.</p>
<p>To mark the start of construction of the Supply Centre North, Petra
  Peterhänsel, Plant Director, Jens Köhler, Works Council Chairman,
  Frank Hager, Head of Production for High-Voltage Batteries, Clemens
  Schülke, Mayor and Alderman for Business, Labour and Digital in the
  City of Leipzig and Anja Hähle-Posselt, Director of the Office for
  Economic Development of the City of Leipzig, were joined by Karsten
  Dickerboom, representing the construction company Max Bögl Stiftung
  & Co KG, to perform the symbolic turning of the first sod.</p>
<p>
  <strong>Building the future</strong></p>
<p>“These days car production is just as much a part of Leipzig’s
  economic DNA as the trade fair. We’re delighted that an already strong
  cluster is now growing further. What’s more, the focus will be on an
  eco-friendly footprint throughout. With this extension, BMW is sending
  out a clear signal around Leipzig as a base and electromobility. We
  are happy to partner the company and support the positive development
  of these areas,” said Mayor Clemens Schülke.</p>
<p>Plant Director Petra Peterhänsel also sees the transition to
  electromobility as an important building block in the plant’s
  development: “Leipzig continues to power ahead. Making the BMW i3, we
  were the BMW Group’s pioneer in electromobility. Now, with the
  development of e-component production and the upcoming launch of the
  MINI Countryman, the future is already taking shape.”</p>
<p>
  <strong>Investment in the transition to electromobility</strong></p>
<p>In the first stage of construction, a warehouse, a two-storey office
  building and a loading tunnel with a combined gross area of 38,000
  m<sup>2</sup> will be erected. There are also plans for a second
  construction stage, which will take the total investment to as much as
  100 million euros. When all the construction work is complete, the new
  buildings at the Supply Centre North will provide workplaces for
  approx. 500 employees.</p>
<p>By 2026 the BMW Group aims for at least one in three new cars sold to
  be fully electric, so the need for high-voltage batteries will
  increase. Plant Leipzig is already a cornerstone in supplying
  e-components for the production network and provides one in three
  battery modules for the BMW Group’s fully electric vehicles. These
  include the BMW iX1, the BMW i5 and the BMW iX. With the new hall as a
  logistics centre for high-voltage batteries, Plant Leipzig is
  embracing this role even further, with a building that meets all the
  structural requirements for handling high-voltage components.</p>
<p>
  <strong>Beyond compliance: Stringent environmental standards </strong></p>
<p>Planning the logistics hall, the team applied stringent environmental
  standards that go above and beyond legal requirements. The buildings
  will be powered not by fossil fuels, for example. Photovoltaic systems
  on the roof of the hall will generate approx. 3,000 kW in peak
  operations. In addition the hall will be heated by a heat pump. The
  office building will have a green roof, and trees at strategic points
  along the façade will keep indoor temperatures cool when the weather
  outside is hot.</p>
<p>The outside space will be landscaped with over 5,700 new shrubs and
  trees. This will continue the City of Leipzig and the BMW Group’s
  efforts to add to the green ring around the plant on the Northern
  Industrial Estate. Outdoor areas will be illuminated by
  insect-friendly lights, and parking spaces will be equipped with
  electric charging points for cars and trucks so that electric heavy
  goods vehicles can operate between the plant and warehouse.</p>
<p>
  <strong>E-component production as the powerhouse for the future of Leipzig</strong></p>
<p>One of the drivers behind the extensive additions that are currently
  being made to Plant Leipzig – both on the premises and off – is
  e-component production. Measures will safeguard existing jobs and
  increase the number of new ones. At the moment more than 800 employees
  work in e-component production in Leipzig, rising to over 1,000 by
  2024. Further jobs will be created with service providers.</p>
<p>From next year BMW Plant Leipzig will run all three stages of the
  high-voltage battery production process: cell coating, module
  production and high-voltage battery assembly. E-component production
  capacity has been steadily increasing since 2021, and at present
  battery cells are coated and assembled into modules there. One in
  three battery modules for fully electric vehicles by the BMW Group
  already comes from Leipzig today, and a battery assembly system is
  currently under construction, expected to go on stream early next
  year. The BMW Group is investing up to 1 billion euros in extending
  e-component production at Leipzig.</p>
<p>With BMW i3 production now phased out, 2024 will see Plant Leipzig
  launch its next fully electric model: the new MINI Countryman. The
  crossover will come with a choice of combustion engines or a fully
  electric drive, the high-voltage batteries for the latter being made
  directly in Plant Leipzig’s workshops.</p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Marc Belcourt<br>Tel: +1-905-428-5078<br>E-mail: <a href="mailto:marc.belcourt@bmwgroup.ca">marc.belcourt@bmwgroup.ca</a></div></div></div>]]></description><category><![CDATA[Research &amp; Development,Mobility of the future,Sustainability,Drive Technologies,Press Release,Leipzig,Environment,e-Mobility]]></category>
            <pubDate>Fri, 25 Aug 2023 10:30:00 +0200</pubDate>
            <pp:lastModified>Fri, 25 Aug 2023 10:30:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3243/1470a505-59cd-46d6-b0d2-43eef1cacf7f/500_P90520095_highRes_marking-the-start-of.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3243/1470a505-59cd-46d6-b0d2-43eef1cacf7f/500_P90520095_highRes_marking-the-start-of.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3243/1470a505-59cd-46d6-b0d2-43eef1cacf7f/P90520095_highRes_marking-the-start-of.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90520095_highRes_marking-the-start-of.jpg]]></pp:imageTitle></item><item>
                        <title>BMW Group Announces $1.7 Billion (USD) Investment to Build Electric Vehicles in the U.S. and Signs Agreement with Envision AESC for the Supply of Battery Cells to Plant Spartanburg</title>
                        <link>https://newsroom.bmwgroup.com/americas/en-ca/bmw-group-announces-17-billion-usd-investment-to-build-electric-vehicles-in-the-us-and-signs-agreement-with-envision-aesc-for-the-supply-of-battery-cells-to-plant-spartanburg-en-ca/</link>
                        <guid>https://newsroom.bmwgroup.com/americas/en-ca/bmw-group-announces-17-billion-usd-investment-to-build-electric-vehicles-in-the-us-and-signs-agreement-with-envision-aesc-for-the-supply-of-battery-cells-to-plant-spartanburg-en-ca/</guid><pp:caseid>784002</pp:caseid><pp:summary><![CDATA[+++ $1 Billion New Investment in Plant Spartanburg (USA) to Prepare for the Production of Battery Electric Vehicles. At Least Six Fully-Electric BMW X-Models by 2030 produced in the U.S. +++ Additional $700 Million Investment to Build a New High-Voltage Battery Assembly Facility in South Carolina +++ Envision AESC to Build New Battery Cell Plant in South Carolina to Supply New Round Lithium-Ion Cells for Electric Vehicle Production in the U.S.+++]]></pp:summary><description><![CDATA[<div class="imported-article"><p>
  <strong>Spartanburg (USA)/Munich.</strong> The BMW Group continues the
  roll-out of its electromobility plan with a new investment in the U.S.
  to expand Plant Spartanburg and the company’s manufacturing footprint
  in the U.S. BMW Group Chairman of the Board of Management, Oliver
  Zipse, announced today a $1.7 billion investment in its U.S.
  operations, including $1 billion to prepare for the production of
  electric vehicles at the company’s existing U.S. manufacturing
  facility in South Carolina, and $700 million to build a new
  high-voltage battery assembly facility in nearby Woodruff, SC. By 2030
  BMW Group will build at least six fully electric models in the U.S.</p>
<p>Zipse was joined today at Plant Spartanburg by South Carolina
  Governor Henry McMaster, Secretary of Commerce Harry Lightsey III,
  Chairman of Spartanburg County Council Economic Development Committee,
  David Britt, and Woodruff, SC Mayor, Kenneth Gist as he also announced
  an agreement to source next generation lithium-ion battery cells from
  Envision AESC, which will build a new plant in the state.</p>
<p>“For decades, Plant Spartanburg has been a cornerstone of the global
  success of the BMW Group. The home of the BMW X models that are so
  popular all over the world. Going forward, it will also be a major
  driver for our electrification strategy, and we will produce at least
  six fully electric BMW X models here by 2030. That means: The ‘Home of
  the X’ is also becoming the ‘Home of the Battery Electric Vehicle’,”
  said Zipse on Wednesday. “In addition, we can showcase BMW Group’s
  ‘local for local’ principle: Our newly developed sixth generation
  battery cells, which were specifically designed for the next
  generation electric vehicles, will be sourced here in South Carolina –
  where X goes electric.”</p>
<p> </p>
<p>
  <strong>Envision AESC Battery Cell Plant in South Carolina to Supply
    Plant Spartanburg</strong></p>
<p>In line with the principle of "local for local,” the BMW Group
  aims to purchase battery cells for its electric vehicles where
  production takes place. The company has found a partner in Envision
  AESC, which will build a new battery cell factory in South Carolina,
  to supply Plant Spartanburg. Envision will produce newly developed
  round lithium-ion battery cells, which were specifically designed for
  the sixth generation of BMW eDrive technology, and will be used in the
  next generation electric vehicles. The annual capacity of the battery
  cell factory will be up to 30 GWh.</p>
<p>The new battery format will increase energy density by more than 20
  percent, improve charging speed by up to 30 percent and enhance range
  by up to <br />30 percent. At the same time, CO<sub>2</sub> emissions
  from cell production will be reduced by up to 60 percent through the
  partial use of secondary lithium, cobalt and nickel material, as well
  as renewable energy for production. </p>
<p>The cooperation with Envision AESC is an important step in the BMW
  Group's plan to strengthen its regional supply chains. The expansion
  of electric vehicle production in combination with a local battery
  cell factory will lead to the creation of new supply chains, new
  networks for sub-suppliers, and new jobs throughout the entire region.</p>
<p>BMW Group has already announced that four additional battery cell
  factories will be built in Europe and China to meet its demand for
  next generation battery cells. The cell factories are being built by
  partners and will each have an annual capacity of up to 20 GWh.</p>
<p> </p>
<p>
  <strong>Increased Investment and Expanded Manufacturing Capacity in SC</strong></p>
<p>Of the new $1.7 billion investment announced today, $700 million will
  be used to build a new high-voltage BMW battery assembly center in
  Woodruff, SC, near Plant Spartanburg. The new facility will encompass
  over 1 million sq. ft., and produce next generation batteries for
  fully electric vehicles. Around 300 new jobs will be created on site.  </p>
<p>Plant Spartanburg currently produces lithium-ion battery modules for
  the two plug-in hybrid electric vehicles built at the plant, the BMW
  X3 xDrive30e (fuel consumption combined: 2.6-2.0 l/100 km WLTP; power
  consumption combined: 20.5-18.9 kWh/100 km WLTP, CO<sub>2</sub>
  emissions combined: 59-45 g/km WLTP) and BMW X5 xDrive45e (fuel
  consumption in l/100 km combined: 1.7-1.2 WLTP; power consumption in
  kWh/100 km combined: 27.7-24.3 WLTP; CO<sub>2</sub> emissions in g/km
  combined: 39-27 WLTP.). In 2021, nearly 70,000 electrified BMWs were
  built on site. The site in Woodruff will also leverage the experience
  and expertise developed in Plant Spartanburg’s existing operations at
  the new facility.</p>
<p>“BMW’s sustained and impactful presence in South Carolina
  demonstrates the power of partnership and shared commitment to our
  state’s automotive industry success,” said Governor McMaster. “With
  today’s announcement of a $1 billion expansion to Plant Spartanburg
  for manufacturing electric vehicles as well as $700 million for a new
  plant in Woodruff to assemble battery units, the road to the future is
  here. And I applaud BMW on helping lead the way.”</p>
<p> </p>
<p>
  <strong>BMW Group Plant Spartanburg</strong></p>
<p>Plant Spartanburg was established 30 years ago and began producing
  vehicles two years later. Since then, the plant has become the global
  center of competence for BMW Sports Activity Vehicles and a critical
  component of the company’s global production network. The plant
  currently represents an investment of nearly $12 billion, employs more
  than 11,000, and has an annual capacity of up to 450,000 vehicles. To
  date more than six million BMW vehicles have been built in the U.S. –
  for the U.S. and global markets. Based on this strength, BMW has been
  the largest automotive exporter from the U.S. by value for the past
  eight years.</p>
<p>Plant Spartanburg currently produces 11 models including the BMW X3,
  X4, X5, X6 and X7 Sports Activity Vehicles, four BMW M models and two
  plug-in hybrid electric models. Production of the all-new
  hybrid-electric BMW XM (fuel consumption in l/100 km combined: 1.6-1.5
  WLTP; power consumption in kWh/100 km combined: 30.1-28.9 WLTP; CO2
  emissions in g/km combined: 36-33 WLTP. Preliminary figures that have
  not yet been officially confirmed.) will begin later this year.</p>
<p>The plant is supported by more than 300 suppliers in the U.S.,
  including over 40 direct tier 1 suppliers in South Carolina alone.</p>
<p>“This is a very important step for Plant Spartanburg as we continue
  our legacy of producing high-quality vehicles, and build on the
  success of the last 30 years,” said Robert Engelhorn, President and
  CEO, BMW Manufacturing Co. “With this latest investment, we
  futureproof our operations and prepare the plant for electrification
  and new technologies, ensuring both the long-term success of our
  company and our position as an attractive and viable employer in the
  state of South Carolina.”</p>
<p> </p>
<p>
  <strong>Ongoing Commitment in the U.S. </strong></p>
<p>In addition to sales and marketing operations, the BMW Group
  footprint in the U.S. consists of nearly 30 locations in 12 different
  states, including an advanced design studio, a technology research and
  development center, and a venture capital fund in California, BMW
  Group Financial Services, and BMW Manufacturing Corporation, which
  operates Plant Spartanburg in South Carolina. The BMW Group dealer
  network consists of nearly 650 independently owned BMW, MINI,
  Rolls-Royce and BMW Motorrad dealers nationwide. Taken together, the
  BMW Group’s operatons in the U.S. directly and indirectly provide and
  support more than 120,000 jobs in the U.S., and has contributed $43.3
  billion to the U.S. economy.</p>
<p> </p>
<p>
  <strong>“Technology Openness” and Customer Focused Flexibility</strong></p>
<p>BMW Group is clearly focused on a sustainable future and shares
  common ambition in the U.S. with regard to climate goals and the
  reduction of greenhouse gas emissions. At the same time, the company
  is following a path of “technology openness” to offer a choice of
  fully electric, plug-in hybrid electric, and highly-efficient internal
  combustion options to its customers in meeting their diverse needs in
  vastly different geographies across the nation. BMW Group is committed
  to fulfilling its goal of making a minimum of 50% of its global sales
  battery electric vehicles by 2030.</p>
<p> </p>
<p>
  <strong>360-Degree Approach</strong></p>
<p>BMW Group has also set an initial target to reduce CO<sub>2</sub>
  emissions by 40% per vehicle by 2030. As BMW Group works towards the
  goal of climate neutrality, the company is focused on the reduction of
  CO<sub>2</sub> emissions throughout a vehicle’s entire life cycle. </p>
<ul>
  <li>
    <strong>Design and Engineering:</strong> Beyond simply electrifying
    its product portfolio, BMW Group begins the design and engineering
    phase of vehicle development with a ‘secondary first’ approach, so
    that currently on average nearly 30 percent of materials used in BMW
    Group vehicles are recycled or reused. In the longer term, the
    “secondary first” approach aims to increase this figure to 50 percent.</li>
  <li>
    <strong>Supply Chain and Procurement:</strong> BMW Group has been
    actively involved for many years in initiatives to develop standards
    for responsible raw material extraction and promote compliance with
    environmental and social standards for raw material extraction
    through certification of mines. The cobalt and lithium used as raw
    materials for the new generation of BMW battery cells will be
    sourced from certified mines which allows the company retains full
    transparency over extraction methods and ensures responsible mining.</li>
  <li>
    <strong>Vehicle Production:</strong> BMW Group’s global production
    network also relies on renewable energy such as solar, wind, and
    hydroelectric power in the manufacturing phase of its vehicles. All
    of the company’s production sites have been net CO<sub>2</sub>
    neutral by offsets since 2021.</li>
  <li>
    <strong>Vehicle Use Phase:</strong> BMW Group is also working to
    ensure that the electricity generated to charge battery electric
    vehicles is done so sustainably. For example, partnerships with
    dairy farms in California reduce greenhouse gas emissions by
    capturing methane gas and transforming it into renewable energy,
    which is exported to the power grid. The company also operates a
    pilot program called ChargeForward in the San Francisco Bay Area
    which makes it possible for owners to charge their vehicles with as
    much solar energy as possible.</li>
  <li>
    <strong>Vehicle Recycling & Post-Life:</strong>From the start
    BMW Group vehicles are designed with recycling in mind, thereby
    improving the possibility for components to be recycled or reused.
    The company has already demonstrated the ability to recover more
    than 90% of the material from high-voltage batteries and has
    approximately 3,000 collection points worldwide for the recycling of
    end-of-life vehicles.</li></ul>
<p>As the BMW Group continues towards an electric future, the company is
  looking beyond the vehicles themselves to ensure that it delivers
  sustainable solutions across the value chain and throughout the entire
  lifecycle of the vehicle. In the U.S. BMW currently offers two fully
  electric vehicles including the BMW iX Sports Activity Vehicle and the
  BMW i4 Gran Coupe. The fully electric <br />BMW i7 Sedan (power
  consumption in kWh/100 km combined: 19.6-18.4 WLTP) will come to
  market later this year and BMW will make a significant step forward.
  For more information about the BMW Group’s focus on sustainability and
  unique approach to electrification, please visit: <a href="https://www.bmwgroup.com/en/sustainability.html">https://www.bmwgroup.com/en/sustainability.html</a></p>
<p> </p>
<p>
  <sub>If you have any questions, please contact:</sub></p>
<p>
  <sub>
    <strong>BMW Group Corporate Communications</strong></sub></p>
<p>
  <sub>Eckhard Wannieck, Head of Corporate, Finance and Sales Communications</sub>
  <br />
  <sub>E-Mail: <a href="mailto:Eckhard.Wannieck@bmwgroup.com">Eckhard.Wannieck@bmwgroup.com</a>,
    Tel.: +49 (0) 151 601 28042</sub></p>
<p>
  <sub>Sandra Schillmöller, Communications Purchasing, Supplier Network, Sustainability</sub>
  <br />
  <sub>Email: Sandra.Schillmoeller@bmwgroup.com, Telephone: +49-89-382-12225</sub></p>
<p>
  <sub>Bernhard Ederer, BMW Group Innovation Communications</sub>
  <br />
  <sub>Email: Bernhard.Ederer@bmwgroup.com , Tel.: +49 (0) 176 601 28556</sub></p>
<p>
  <sub>Martina Hatzel, Communications Production Network BMW Group</sub>
  <br />
  <sub>E-Mail: <a href="mailto:Martina.Hatzel@bmwgroup.com">Martina.Hatzel@bmwgroup.com</a>,
    Tel.: +49 (0) 151 601 11966</sub></p>
<p> </p>
<p>
  <sub>
    <strong>For questions regarding Envision AESC please contact:</strong></sub></p>
<p>
  <sub>Lauren Flanagan, Senior Director International Government
    Relations & Communications, Envision Group</sub>
  <br />
  <sub>E-Mail: <a href="mailto:lauren.flanagan@envision-energy.com">lauren.flanagan@envision-energy.com</a>,
    Tel. +44 7379 340 101</sub></p><div class="import-contacts-wrapper"><div class="import-contact">Press Contact: Marc Belcourt<br>Tel: +1-905-428-5078<br>E-mail: <a href="mailto:marc.belcourt@bmwgroup.ca">marc.belcourt@bmwgroup.ca</a></div></div></div>]]></description><category><![CDATA[Research &amp; Development,Sustainability,Drive Technologies,Press Release,Sales &amp; Finance,Locations,Production Plants,Environment,Technology,Company,e-Mobility]]></category>
            <pubDate>Wed, 19 Oct 2022 17:00:00 +0200</pubDate>
            <pp:lastModified>Wed, 19 Oct 2022 17:00:00 +0000</pp:lastModified>
            <enclosure url="https://content.presspage.com/uploads/3243/83a96249-d8f2-49ef-a18e-091f53f534de/500_P90483676_highRes_bmw-group-plant-spar.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/3243/83a96249-d8f2-49ef-a18e-091f53f534de/500_P90483676_highRes_bmw-group-plant-spar.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/3243/83a96249-d8f2-49ef-a18e-091f53f534de/P90483676_highRes_bmw-group-plant-spar.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P90483676_highRes_bmw-group-plant-spar.jpg]]></pp:imageTitle></item></channel>
                    </rss>